• En12810 Construction Platform Ringlock Scaffolding CNBM System 1
  • En12810 Construction Platform Ringlock Scaffolding CNBM System 2
  • En12810 Construction Platform Ringlock Scaffolding CNBM System 3
En12810 Construction Platform Ringlock Scaffolding CNBM

En12810 Construction Platform Ringlock Scaffolding CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of En12810 Construction Platform Ringlock Scaffolding   

  • Material:Steel

  • Construction Properties:Installation Scaffold

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Projecting Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type: Scaffolding Frames

  • Move Method: Integral Lifting Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Surface:Hot-Dipped Galvanized

  • Color:Painted/HDG

  • Steel Grade:Q235/Q345

  • En12810 Construction Platform Ringlock Scaffolding CNBM

  • En12810 Construction Platform Ringlock Scaffolding CNBM


  • En12810 Construction Platform Ringlock Scaffolding CNBM

  • Descriptions of  En12810 Construction Platform Ringlock Scaffolding   

  • Introduction

    The revolutionary Ringlock System's node point ( Rosette) provide up to 8 connections in one place. The 4 narrow punched out holes automatically center the ledgers in correct dimensions and at right angles. The 4 wide holes permit alignment of ledgers and diagonal braces at angles required.
     

  • Standard

  •  Use: Standards are the vertical members of ringlock scaffolding. They provide the

  •  vertical support for scaffolding.

  •  Material: High strength structural steel

  •  Finish: Hot dipped galvanized

  • ledger

    Use: Ledgers are the horizontal members of Ringlock scaffolding. They provide horizontal support for loads and planks. Ledgers can also be used as mid rail and top or hand guard rails

  • Material: High strength structural steel Q235

  • Finish: Hot dipped galvanized

  •  

  •  Base collar

  • Use: The base collar is designed to "base out" the Ringlock scaffolding system sitting on top of the screw jack creating a lower node point.

  •  Material: High strength structural steel Q235

  •  Finish: Hot dipped galvanized

  •  

  • Features:

  • 1) Quick erection: Ringlock scaffolding are all pre-measured and just a hammer is required when erection.

  • 2) Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening.

  • 3)Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.

  • 4) Low maintenance: The dip galvanized finishing will greatly last the life of the products, no paint required, antirust and anticorrosion.

  • 5) Convenient in storage and transportation: Individual scaffolding parts can be packed in bundles for easy storage and transportation.

The Parts of En12810 Construction Platform Ringlock Scaffolding

DESCRIPTIONMATERIALQTY.   (PCS)W. T.     (KG/PC)SURFACE
3.00m  standardQ345  48.3*3.2mm1.00 15.3Hot-dipped  Galvanized
2.50m  standardQ345  48.3*3.2mm1.00 12.9Hot-dipped  Galvanized
2.00m  standardQ345  48.3*3.2mm1.00 10.5Hot-dipped  Galvanized
1.50m  standardQ345  48.3*3.2mm1.00 8.1Hot-dipped  Galvanized
1.00m  standardQ345  48.3*3.2mm1.00 5.7Hot-dipped  Galvanized
0.50m  standardQ345  48.3*3.2mm1.00 3.3Hot-dipped  Galvanized
2.00m  ledgerQ345  48.3*2.5mm1.00 6.8Hot-dipped  Galvanized
1.80m  ledgerQ345  48.3*2.5mm1.00 6.2Hot-dipped  Galvanized
1.50m  ledgerQ345  48.3*2.5mm1.00 5.3Hot-dipped  Galvanized
1.20m  ledgerQ345  48.3*2.5mm1.00 4.4Hot-dipped  Galvanized
0.90m  ledgerQ345  48.3*2.5mm1.00 3.5Hot-dipped  Galvanized
0.60m  ledgerQ345  48.3*2.5mm1.00 2.6Hot-dipped  Galvanized
2.00*2.00m  braceQ235  33.5*2.3mm1.00 7Hot-dipped  Galvanized
1.80*2.00m  braceQ235  33.5*2.3mm1.00 6.7Hot-dipped  Galvanized
1.50*2.00m  braceQ235  33.5*2.3mm1.00 6.4Hot-dipped  Galvanized
1.20*2.00m  braceQ235  33.5*2.3mm1.00 6.1Hot-dipped  Galvanized
2.00*1.50m  braceQ235  33.5*2.3mm1.00 6.3Hot-dipped  Galvanized
1.80*1.50m  braceQ235  33.5*2.3mm1.00 6Hot-dipped  Galvanized
1.50*1.50m  braceQ235  33.5*2.3mm1.00 5.6Hot-dipped  Galvanized
1.20*1.50m  braceQ235  33.5*2.3mm1.00 5.2Hot-dipped  Galvanized
0.90*1.50m  braceQ235  33.5*2.3mm1.00 4.9Hot-dipped  Galvanized
0.60*1.50m  braceQ235  33.5*2.3mm1.00 4.7Hot-dipped  Galvanized
2.00*1.00m  braceQ235  33.5*2.3mm1.00 5.8Hot-dipped  Galvanized
1.80*1.00m  braceQ235  33.5*2.3mm1.00 5.4Hot-dipped  Galvanized
1.50*1.00m  braceQ235  33.5*2.3mm1.00 4.9Hot-dipped  Galvanized
1.20*1.00m  braceQ235  33.5*2.3mm1.00 4.5Hot-dipped  Galvanized
0.90*1.00m  braceQ235  33.5*2.3mm1.00 4.1Hot-dipped  Galvanized
0.60*1.00m  braceQ235  33.5*2.3mm1.00 3.8Hot-dipped  Galvanized
2.00*2.00m  braceQ345  48.3*2.5mm1.00 10.2Hot-dipped  Galvanized
1.80*2.00m  braceQ345  48.3*2.5mm1.00 9.8Hot-dipped  Galvanized
1.50*2.00m  braceQ345  48.3*2.5mm1.00 9.2Hot-dipped  Galvanized
1.20*2.00m  braceQ345  48.3*2.5mm1.00 8.8Hot-dipped  Galvanized
2.00*1.50m  braceQ345  48.3*2.5mm1.00 9.1Hot-dipped  Galvanized
1.80*1.50m  braceQ345  48.3*2.5mm1.00 8.7Hot-dipped  Galvanized
1.50*1.50m  braceQ345  48.3*2.5mm1.00 8Hot-dipped  Galvanized
1.20*1.50m  braceQ345  48.3*2.5mm1.00 7.4Hot-dipped  Galvanized
0.90*1.50m  braceQ345  48.3*2.5mm1.00 7Hot-dipped  Galvanized
0.60*1.50m  braceQ345  48.3*2.5mm1.00 6.6Hot-dipped  Galvanized
2.00*1.00m  braceQ345  48.3*2.5mm1.00 8.3Hot-dipped  Galvanized
1.80*1.00m  braceQ345  48.3*2.5mm1.00 7.7Hot-dipped  Galvanized
1.50*1.00m  braceQ345  48.3*2.5mm1.00 7Hot-dipped  Galvanized
1.20*1.00m  braceQ345  48.3*2.5mm1.00 6.2Hot-dipped  Galvanized
0.9*1m  braceQ345  48.3*2.5mm1.00 5.6Hot-dipped  Galvanized
0.6*1m  braceQ345  48.3*2.5mm1.00 5.2Hot-dipped  Galvanized
0.88m  board  bracketQ345  48.3*2.5mm1.00 9.5Hot-dipped  Galvanized
0.60m  base  collar  downQ235  38.1*4.5mm1.00 4.4Hot-dipped  Galvanized
0.60m  base  collar  upQ235  38.1*4.5mm1.00 5.2Hot-dipped  Galvanized
0.24*2.00m  PlankDX51D-Z801.00 8.2Hot-dipped  Galvanized
0.24*1.80m  PlankDX51D-Z801.00 7.5Hot-dipped  Galvanized
0.24*1.50m  PlankDX51D-Z801.00 6.5Hot-dipped  Galvanized
0.24*1.20m  PlankDX51D-Z801.00 5.5Hot-dipped  Galvanized
0.24*0.90m  PlankDX51D-Z801.00 4.5Hot-dipped  Galvanized
0.50*2.00m  PlankDX51D-Z801.00 15.3Hot-dipped  Galvanized
0.50*1.80m  PlankDX51D-Z801.00 14Hot-dipped  Galvanized
0.50*1.50m  PlankDX51D-Z801.00 11.9Hot-dipped  Galvanized
0.50*1.20m  PlankDX51D-Z801.00 9.9Hot-dipped  Galvanized
0.50*0.90m  PlankDX51D-Z801.00 7.9Hot-dipped  Galvanized
  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
Q:I know its between chapters one and two, duh. Haha, but yeah, I needa do this thing on Edmodo for school, but i accidentally left my book in my locker.):I tried looking at online versions, but you know it's so hard, right? Looking and seeing all these different versions and I cant find the place...I need where she entered the scaffold because I need to cite where she thinks about how she's accepted her quot;sinquot;. So yeah~ PLEASE HELP! ( gt; . lt; )
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
Q:i got my scaffold done quite a while ago and it still really hurts and is all lush and crusty,loli know it takes agessss to heal but could i take it out and put normall small earrings in each whole instead? Which would i have to use? thanks
in my opinion you should ride it out and just clean it more often. not only will the piercings give you trouble if you try to change the earring now, the piercings themselves will move slightly and you won't be able to put an industrial bar back through it. if you can live with these go through with it, if not, wash often, rotate the bar constantly and avoid sleeping on it and getting your hair caught up in it. like you said, piercings in the cartilage are very sensitive and need time and nurturing so that they can heal properly.
Q:Compared to Pankou scaffolding and scaffolding have what distinction, what are the advantages
3, Pankou scaffolding load intensity up to 200KN capacity4, Pankou scaffolding scaffolding activities. Abandon the traditional parts easily lost, easily damaged, and compared with the ordinary bowl-scaffold, saving up to 2/3 more than the amount of steel, so to a certain extent, greatly shorten the construction unit cost and economic loss.
Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
To cover your A** in case of injury or an inspection.
Q:hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q:I plan to have a scaffolding or industrial piercing soon, but don't know where to go.Any suggestions and could you include the prices?x
Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
Q:So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
have a piercer look at it.
Q:In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
(3) the railings and retaining scaffold deadweight standard value (kN/m); the railings, bamboo amphipodsshouban baffle, the standard value of 0.15NG3 = 0.150 x 7 x 1.500/2 = 0.788 kN;(4) the load of the hanging safety facilities, including safety net (kN/m2); 0.005NG4 = 0.005 x 1.500 x 24 = 0.180 kN;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords