building steel Hex nut casted/formwork tie rod nut/formwork Building systems

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

color:
galvanized or self color

Packaging & Delivery

Packaging Detail:Crates,or Pallets, or Big bags,or Customed following customer
Delivery Detail:20days

Specifications

1.surface galvanized or self color
2.process casting
3.size custom made
4.material casted steel or ductile iron

1.surface galvanized or self color
2.process casting
3.size custom made
4.material casted steel or ductile iron  

5.Supply Ability: 50000 sets per month

6.Custom Made: Available

Our main products involve the Wing Nut, Formwork Clamp,  Nut, Base Jack Nut,   Slope Plate, Walter Plate, Pressed Plate,  Tie Rod, Scaffolding Coupler, Round Coupler, Pins, Washers, Steel Cone, Iron Cone, Concrete parts, Lock Nut, Flanged Wing Nut, Anchors, Lifting Anchors, Sockets, Lifting Clutch, Recess Former and other casted and pressed Formwork Accessories, Scaffolding Accessories etc.

   Our selling network spread all over the world, the current main customers come from the Europe, the Middle East, the America and the Africa.

1. We are one of the biggest factory on formwork and scaffolding accessories

2. We have more than 10 years experience on manufacturing and exporting.

3. We have the advanced equipment and process flow and excellent quality control.

4. We have the competitive price.

5. We have the completed sales and service team so that we can offer the best service


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Questions about Scaffold (aka Industrial) piercings?
Ask how long they have been piercing and what certifications (if any) they carry, additionally verify close by regulations to ascertain if any are required. additionally ask how generally they spore verify their autoclave and while it grew to become into accomplished final time. Ask to ascertain a portfolio of HEALED piercings, exceptionally pictures of in spite of piercing you try to get.
Q:What are the dangers of scaffolding
The scaffold and bar for use of instability, binding is not strong or break and fall; the improper operation of the impact and accident etc.;Improper operation generally have the following situations:A. overexert, causing physical instability;B. in the frame and pull the car back walking;C. crowded collision;D. many people handling or installation of heavier components;Ice and snow on the E. frame is not clear, causing the slide.
Q:Bowl buckle type steel pipe scaffolding should set up a few people
Structural partsThe bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.
Q:I have a contract to paint a six story hotel. Problem the roof has an aluminum skirt. Can scaffolding be used?
Scaffolding and Cherry picker is your best option.
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
As for the specific rent is not easy to say, because each scaffolding rental companies may have some differences
Q:Please help me in building professional people (scaffolding)
Please know a good personLearn slowlyWell then consider whether or not to kick offMore types of scaffolding
Q:Construction scaffolding fastener weight?
Weight: 48kg above 3, single piece weight in 20Kg or so, easy to carry and construction operation. 4, the installation and removal of only bare handed, greatly improved the efficiency of the door scaffolding installed than the fastener steel tube fast 1/2 time, faster than bamboo scaffolding 2/3 time. 2 the maximum weight of a single piece is not more than 20 kg, so lifting, assembling and disassembling and transportation are convenient
Q:how long will a scaffold piercing take to heal?
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Construction scheme and technical measuresAccording to the actual situation of the 1.1. design drawings and combined with the content of the project construction site, the project arrangement of small water method construction work construction, construction division order: positioning line - based project main project - - - Roof Engineering Decoration Engineering hydropower installation engineering - completion of cleaning, acceptance, delivery. Positioning of engineering survey according to the plan and the total construction plan.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range