Plastic Formwork Concrete Formwork New Material
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Plastic formwork
Plastic Formwork Concrete Formwork New Material
Saving your time, money and energy !!!
The material of modular formwork is ABS mixied with special glass fibres which enable panels to hold high pressures.
The handles are made by high strength Nilon, each panel locked by at least 5 handls, which makes the whole system strong enough to pour 40cm walls.
What is Details of our products plastic concrete formwork ?
Features:
1. Long lifespan& Cost effective -- Plastic formwork can be reused over 100 times,
where Plywood can only be reused 3 to 5 times. Therefore the Plastic Formwork
is more cost effective.
2. Waterproof -- As the nature of plastic material. It's imputrescible and rustless,
especially suitable for underground and watery circumstance.
3. Interlocking Design -- No release agent needed, good effect of demolding.
4. Easy deassembly -- The template will be separated easily from concrete
5. Simple Installation -- Light weight and safe to handle, easy cleaning and very robust.
6. High Quality -- Abrasion resistance, excellent mechanical property, best impermeability.
7. Recycable -- Waste scrap molding board could be recycled.
Product Photos/ plastic concrete formwork
If you are interested in our plastic formwork , please feel free to contact with us by email. We will quote you the best price.
Please send your project design drawing in AutoCAD file to us, we will help to make formwork solution for you.
Any building drawings is OK, just send us your drawing, we can make the plastic formwork quantity for you.
And we warmly welcome friends from all over the world to visit our factories for business.
- Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
- Should not be less than 160mm, and should not be less than the floor of the high 1/20; bottom reinforced parts of the wall thickness of not less than 200mm, and should not be less than the floor of the high 16/1. Hope to be helpful to you.
- Q:Who used plastic building templates? How is the effect? What are the advantages and disadvantages?
- Plastic building template is an energy-saving and green products, is following the wood template, the combination of steel formwork, bamboo glued template, all the steel template after another new generation of products. Can completely replace the traditional steel formwork, wood template, square wood, energy saving and environmental protection, amortization cost is low.
- Q:What is the economic benefits of building wood formwork compared to plastic molds?
- Both are their own strength, stiffness is not high, the turnover rate of the template material is low, but the cost is relatively low, due to different uses, can not be compared: wood sheet low cost, can be processed, the turnover rate is low, can not help blisters, if Small keel spacing is large, and the concrete side of the larger pressure, its own stiffness is low, there will be bending deformation or even up the mold, generally in the base floor or slope roof and other concrete appearance quality requirements are not high or one-time no longer a lot of turnover Parts of the use of plastic templates are generally stereotypes, such as ribbed floor in the plastic mold shell, is a specific structure with the template can be leased.
- Q:Plastic building template where there is an urgent need to solve
- Plastic construction template turnover can reach more than 30 times, but also recycling. Temperature to adapt to a large range of specifications adaptability, can be saw, drill, easy to use. Temporal surface of the template, smoothness than the existing technical requirements of the water concrete template, a flame retardant, anti-corrosion, anti-water and anti-chemical corrosion function, have better mechanical properties and electrical insulation properties. Can meet a variety of cuboid, cube, L-shaped, U-shaped building support model requirements.
- Q:Europe and the United States national construction template is made of plastic or wood
- Part of the place with stones, as the case may be, but certainly yes, Europe and the United States have anti-seismic buildings
- Q:Why the floor is not plastic building materials square wood and template
- Not people do not have this product is not humane is not perfect not to buy only to be used to solve the trouble of the workers with the boss's doubts
- Q:Does the building plastic template use it? How's the effect? Can I use 30 to 50 times? Can the fire protection requirements of the steel plate on the cast-in-place plate be achieved?
- Plastic template this line, and now China is not perfect, may reach less than 30-50 this requirement, but better than the wood template, fire requirements should be able to achieve.
- Q:Types of building templates? What is the water template?
- The type of template, according to the material to wood template, steel formwork, bamboo template, Gangmu combination template, etc.
- Q:I heard that plastic construction template workers do not want to use, there is such a situation
- Are generally wood board, plastic with less
- Q:Why is the building template made 1830mm * 915mm and not made 2000mm * 1000mm it?
- Can be ruled length processing, can be ruled length processing, can be ruled length processing
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Plastic Formwork Concrete Formwork New Material
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords