• Ringlock Scaffolding System Easy to Onstall System 1
  • Ringlock Scaffolding System Easy to Onstall System 2
Ringlock Scaffolding System Easy to Onstall

Ringlock Scaffolding System Easy to Onstall

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Ring lock Description 

Ringlock Scaffolding system is the most popular used Scaffolding system in the world.It will greatly reduce the cost because of the following advantages

 

Packaging & Delivery

Packaging Details:

Pallet or bag or upon client's request

Delivery Detail:

35days

 

2.Main Features of Ringlock

 It will greatly reduce the cost because of the following advantages

1Using less pipes

2Easy to install

3It can be used again and again for nearly 20years

 3.Ring lock product pictures:

 Ringlock Scaffolding System Easy to Onstall

 4.Ringlock Product Description

Type:

ringlock scaffolding diagonal Brace

specification

Ø48.3×3.20

material:

steel Q235

Finished

Hot DIP galvanized, painted

Diagonal length(m)

Weight(kg)

0.9m * 1.25m

6.28

1.25m * 2.7m

11.45

 

 5.FAQ

 We have organized several common questions for our clientsmay help you sincerely

1How many Scaffolding your company have

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit. 

Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q:Scaffold removal should comply with those requirements......
Preparation of scaffold safety demolition before demolition1 check the scaffold fastener connection, the wall, the support system is in line with safety requirements.2 according to the inspection results, supplement and improve the design of the demolition process, and after the implementation of the approval.
Q:Latch type disc scaffolding accessories is a national patent product
Disk lock scaffolding called socket type Pankou scaffold.
Q:A 520 kg box sits 1.4 m from the left end. What is the tension in the right hand side wire? (g = 9.8 m/s2) ____________ Newtons
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q:scaffolding piercing.. do they hurt? and how much are they in england? thanks x?
Yes, they hurt, quite a lot. But how rad they look outweighs the pain. :D
Q:Erection of scaffolding accessories
When the scaffolding height of more than 20m, should be in the scaffolding outside every 4 steps to set a level of reinforcement bar, and even walls should be in a horizontal layer set pieces; set of longitudinal reinforcement bars should be continuous, and the formation of the level of closed loop; on the bottom step lower door frame scaffolding should be sealed in the mouth bar, door frame and should be located on both sides of long rod should adopt sweeping bar; fastener rack pole fastened by. Construction should pay attention to the door frame and accessories should not be mixed with the same hand rack.
Q:Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
3 products have a high degree of economic, the use of more convenient and efficient in use, only need to put the plug into the hole of the ends of the cross rod pole corresponding, and then knock tightly, the quality of the demolition ride fast and overlapping is the traditional scaffold cannot do. Its erection speed is 4-8 times more than 2 times that of steel pipe scaffold. Reduce labor time and labor remuneration, reduce shipping costs to reduce the overall. The joint is reasonable in structure, easy in operation, light and handy. Vertical rod weight than the same length of the size of the bowl buckle 6-9%.
Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
oh dang u have to read that story too ! man i had to read it and watch the movie ! so boring. What grade are u in ?
Q:1.How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!
Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords