• Ringlock Scaffolding System System 1
Ringlock Scaffolding System

Ringlock Scaffolding System

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Model Number:
002
type:
smart scaffold systerm
construction:
scaffolding
scaffolding:
scaffolding parts
material:
steel pipe Q235

Packaging & Delivery

Packaging Detail:waterproof packing
Delivery Detail:15-20 days after payments

Specifications

1.time saving,labor saving
2.competitive price
3.ISO9001 approved
4.high rigidity , good durability and long service life

PRODUCT SPECIFICATION
TitleLength(m)G.W.(kg)Diameter (mm)Thickness(mm)MaterialSurface Finish
vertical props2.558.85482.75~3.00Q235Electrophoretic
Painting
1.956.60482.75~3.00Q235
1.354.81482.75~3.00Q235
1.053.88482.75~3.00Q235
0.752.61482.75~3.00Q235Electrophoretic
Painting
horizontal
props
1.223.90482.75~3.00Q235
0.872.79482.75~3.00Q235
0.471.60482.75~3.00Q235
CHARACTERISTICS OF OURS

Unlike traditional steel tube scaffold, this new scaffold system is all made of steel and not need wood timbers at all ,

it can save a lot of time, labor and money .

1. Easy operation, any worker under correct direction will be competent for the work.
2. Free size, suitable for any building through the adjustive sliding system.
3. Make the construction site neat and clear, improve the project Quality.
4. The life cycle is 300 times.
5. Working load: 450kg(max);  
6. They are made from the steel plate and tube;
7. Good quality in power coating;


Q: Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
Cross barName specification A (mm) B (mm) theoretical weight (kg)
Q: What are the full house scaffolding specification
Preparation of "full house scaffolding construction plan" according to the specification including but not limited to the following:1 "steel pipe scaffold fastener" (GB15831-2006)2 "technical code for safety of high level construction work" (JGJ80-1991)3 "technical code for safety of scaffold for building construction" (JGJ202-2010)4 "code for safety of steel tubular scaffold with couplers in construction" (JGJ130-2001)
Q: The classification of scaffolding and the relevant provisions of the provisions of the installation, please explain professional, thank you
7, the unloading platform progress specification in our city construction scaffolding scaffolding collapse prevention effect falling accident according to the "construction safety management regulations" "construction of steel tubular scaffold safety technical specifications" (JGJ130-2001) related matters notice: now, the scaffold erection procedures for the implementation of the 1 basic requirements, construction the enterprise construction project before the implementation of special case according to the characteristics of building scaffolding (highly 24m tubular steel scaffolding, cantilever scaffold should be attached to the safety check node) the case should be responsible for the enterprise technology (General Engineering) signed by the chief supervision engineer signature recognition project review organization and implementation review does not pass the special construction case the implementation of
Q: What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q: so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
Industrial piercings take 9-12 months to heal completely and you never want to remove an unhealed piercing unless the jewelry is causing problems and at that point it should be done by a professional in a sterile environment. Taking the jewelry out before it is healed could cause it to close up, become infected or irritated, and can cause hypertrophic scarring (scar tissue) to form on your piercing. I took my industrial out after having it for 3 months. It was out for less than a minute and when I went to put it back in it went through the first hole easily but wouldn't go through the top hole no matter how hard I pushed. It immediately started bleeding and hurtling like crazy. Awesome. Waste of time, pain, and money. So, you might get lucky and just have it get a little irritated or prolong the healing time by changing it early. But you could also end up like me or worse, with any infected piercing. Why risk it?
Q: Construction scaffolding right angle fastener, rotary fastener, butt fastener weight? There are more than one meter steel pipe?Thank you!!!
Button bowl frame of various specifications and theoretical weight list: scaffolding company, steel pipe, scaffold engineering, scaffold accessories, Wuxi scaffolding, scaffolding rental, mobile scaffolding, scaffolding, scaffolding rental, Aluminum Alloy scaffolding, scaffolding, mobile scaffolding, stainless steel scaffolding;
Q: I know its between chapters one and two, duh. Haha, but yeah, I needa do this thing on Edmodo for school, but i accidentally left my book in my locker.):I tried looking at online versions, but you know it's so hard, right? Looking and seeing all these different versions and I cant find the place...I need where she entered the scaffold because I need to cite where she thinks about how she's accepted her quot;sinquot;. So yeah~ PLEASE HELP! ( gt; . lt; )
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
Q: I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
When I got my industrial, it hurt more after wards. During the first week, it was a pain to sleep. Just make sure you clean it twice a day so it doesn't get infected.
Q: Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q: How to calculate the vertical force of scaffolding
First, the calculation of small beams: small beams in accordance with the strength and deflection calculation of simple beams, small bars in the upper bar. According to the small bar scaffold board and live loads above the maximum bending moment and deformation the uniform load calculation of small bar.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords