• Construction Building Tower Crane for Sale System 1
  • Construction Building Tower Crane for Sale System 2
  • Construction Building Tower Crane for Sale System 3
Construction Building Tower Crane for Sale

Construction Building Tower Crane for Sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of our Tower Crane

1) TC60/10 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of Tower Crane

Model

QTP80 (TC5511) (Flat-Top)

Max Working Radius (m)

55

Free Height (m)

41

Max Load (T)

6

Tip Load (T)

1.1

Max Height (m)

161

Wall Ties for Max Height (sets)

8

Main Material Specs (mm)

Square Steel Tube   1352*12

Mast Section Dimension (m)

1.835*1.835*2.5

Hoisting Speed (m/min)

80/40/10

Min Steady Falling Speed (m/min)

5

Slewing Speed (r/min)

0-0.62

Radius-changing Speed (m/min)

40/20

Jacking-up Speed (m/min)

0.6

Total Motor Power (kw)

60

Independent Structure Weight (kg)

37800

Counter Weight (T)

16.2

 

Construction Building Tower Crane for Sale

Construction Building Tower Crane for Sale

 

Q:ok, how do you make a paper crane. i've totally tried with a direction and marked paper, but that didn't work out. by the time i gave up the paper was all smooth cuz it was so worn. anything would help, links, step-by-step instructions, both. whatever. 10 pts to whoever tells me, and i succeed. sweet
not a joke lol.
Q:A 3000-lb wrecking ball hangs from a 40-ft cable of density 10 lb/ft attached to a crane. Calculate the work done if the crane lifts the ball from ground level to 40 ft in the air by drawing in the cable.
The total work done by the crane equals the potential energy gained by the wrecking ball and the cable; the potential energy gained is W = V_final = Mg L + ρ L g L/2 which is the final potential energy of the wrecking ball and the cable added together. In the case of the cable, you take the center of mass of it which is located right at the center (L/2). The result is then W = 3000*32*40 + 10 * 40 * 32 * 40 / 2 = 4096000 ft-lbf = (4096000)*(0.001285067) BTU = 5263.63 BTU
Q:A crane lifts a 425 kg steel beam vertically a distance of 117m. How much work does the crane do on the beam if the beam accelerates upward at 1.8 m/s^2? Neglect frictional forces.a.) 3.4 x 10^5 Jb.) 4.0 x 10^5 Jc.) 5.8 x 10^5 Jd.) 4.9 x 10^5 JSolved as W= mgh but obviously that is wrong. Where do I go wrong?
Force=mass x (acceleration) -Gravity must be taken into account F=425 x (1.8 -(-9.8)) F=4930 w= F x deltay w= 4930 x 117 w=576810J
Q:What is W_safe, the largest weight of the load that is safe to lift regardless of the angle of the crane's arm?
(Wc)/(2b) for my problem.
Q:What is the wall radius of a qtz50 tower crane?
The working radius is usually 50 meters. There are also 48, 49 meters. For example, 4810, 4910, and 5010, belong to 50 tons of tower cranes.Qtz50 resolves to:Q: crane;T: Tower type;Z: Jack up;50: lifting torque of 50 tons meters.
Q:Cranes are normally used in construction in most countries.But I saw some photos that show Iranians are hanging criminals in pubic with cranes instead of gallows.Is it more painful to the dying criminals to the last moment?Do you know why?
they probably didn't have the proper arrangements to carry out the punishment so they used cranes instead of gallows. who knows? but weird really. and it wouldn't be more painful... err... the purpose is to snap the neck... ouch :(
Q:If there was a fight between Stefano DiMera and Allistar Crane, who would win?
Crane would not have a chance againt DiMera because he is not skilled enough to even get past all of Stefano's pawns to get close enough to Stefano!
Q:I'm researching Stephen Crane for an English project and I need to how Stephen Crane's works effected others. Thanks for the help! xP
I'd mention his book Red Badge of Courage and how it changed the war novel for American and English writers. You can look at books like Catch-22 , MASH, or Hemingway's war novels and find that personal voice that Crane used.
Q:Can anyone give me a very accurate slow step-by-step video of how to make the prison break crane perfectly?Its hard to follow the directions on a diagram online so I need a good video.
They used a helicopter to break out of prison. Breakout with Charles Bronson and Robert Duvall (1975)
Q:when a tall building is under construction you alwase see cranes on top. well i would like to know 1. how they move them up as the buildung gets taller and 2nd after there done how do they get them down?
They disassemble them

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords