Alloy Steel Tee

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Piece pc
Supply Capability:
50 Tons per Week pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


Alloy Steel Tee


First grade





Product name


  Alloy Steel Tee








Stainless steel Carbon steel


Used in


Oil Field, Offshore, Gasoline, Water Systerm, Electrical factory, Building Construction



GB/T12459-2005 GB/T13401-2005 GB/T10752-2005

ASME B16.9 ASME B16.11 ASME B16.49 ASME B16.5 ASME B16.28

JIS B2311 JIS B2312 JIS B2313

DIN2633 DIN2605 DIN2615 DIN2616 DIN2617


Min order Quantity


1 piece or according to customer needs


Delivery Time


15---30days according to customer needs




First grade


Walk thickness


Sch10--- Sch160 XXS








Wooden cases or wooden pallet or as customers requirement


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many types of hydraulic connections?
A hydraulic system in which the components between the high pressure tubing and the high pressure tubing are connected.
Q:Can flared and jacketed hydraulic couplings be used as gas line couplings?
And it is not convenient to use, the general use of gas joints are fast plug.
Q:How are the sleeve couplings joined?
A sleeve type pipe joint is a kind of hard sealing joint
Q:What's the meaning of the plumbing PVC pipe joint specification "1/2" "X12" and "1/2" "x18"?
Indicates that the joint is 1/2 of the wire (that is, the 15 wire), and the length of the wire is 12 18mm
Q:PVC pipe joint leakage how to do?
Method for solving leakage of water pipe joint:The 1. pipe itself is broken and can only be replaced with a new one.2., the mouth of the water leakage can be removed, if there is no glue pad should be installed on the rubber pad, rubber pad aging, change a new, silk mouth painted white paint, and then wrapped on hemp silk after loading, with raw material belt winding is also the same.
Q:Reinforced pipe joint,Used in chemical pipes
20# steel, JB 4726-2000 material "pressure vessel with carbon steel and low alloy" standard, SW socket welding.  40T025/01 is drawing number, SCH80 diameter specifications. See below;
Q:110 degree PVC pipe joint
Hello, you can use PVC two to a 45 degree elbow three back, try on the line, 35 meters of pipe according to the 1% grade to install, depends on the specific circumstances if the flow rate is larger and with construction conditions if the proposed slope is a little bigger. (personally) I don't think it's necessary to install it with stainless steel pipe
Q:The difference between expanding, clamping sleeve and welding pipe joint
Welded pipe joints: welded pipe joint applicable medium: oil, water, gas and other non corrosive or corrosive medium. The welding type sealing pipe joint with steel pipe specifications and flexible pipe welding, has the characteristics of reliable connection, good sealing performance, so it is widely used in oil refining and chemical engineering light industry, textile, metallurgy, aviation, defense, and ship system; also suitable for hydraulic transmission of various mechanical engineering, machine tools and other equipment pipeline. When the sleeve type pipe joint production can not meet the needs, and in the case of strong corrosion, priority can be adopted.
Q:What are the standard drawing numbers for hydraulic couplings?
Jacket type pipe joint installation(1) in accordance with the requirements of the ninth chapter, the pickling pipe should be washed first;(2) tube machine tools for cutting pipe sawing or special cutting length required, absolutely not allowed by fusing (such as flame cutting) or grinding wheel cutting; remove pipe end burr, cylindrical metal chips and dirt; remove the rust and dirt pipe joint; and also to ensure pipe roundness;(3) the sleeve nut, successively sheathed in the pipe sleeve front edge (small end) from the pipe mouth at least 3mm, then the pipe is inserted into the connector body bore, until the top;(4) tighten the nut slowly, and turn the pipe at the same time until it does not move. Then tighten the nut 2/3 ~ 4/3 ring;(5) open the check that the sleeve has been cut into the pipe and the position is correct. The sleeve doesn't allow axial movement, but it can be rotated slightly;
Q:PPR pipe joints did not plug in the melt, in the end will leak?
A, in general, as long as the PPR hot melt pipe effective connection, through the fusion will fuse together, will not leak, and if not assured, it is recommended to re melt.Two, the pipeline before welding to seriously clean pipes and appearance, cleaning pipe appearance of oil, impurities and burrs. To carefully insert pipe length should be appropriate, should be symmetrical flange to discuss the formation of pipeline connection, if not well proportioned, stability that side, reflected weld is not ideal, the discussion is not difficult to guarantee Water Leakage, you should promptly reconnect.
Presently, we have advanced production equipment including hot forming elbow machines, cold drawn tee machines, beveling machines, sandblasting machines, air hammers, CNC lathes, drilling machines, etc. Moreover, we have advanced testing equipment such as metallurgical analysis experiment, physical experiment, chemical analysis experiment, X-ray testing experiment, ultrasonic testing experiment and other testing equipment.

1. Manufacturer Overview

Location Hebei,China
Year Established 2011
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port qingdao,rizhao
Export Percentage
No.of Employees in Trade Department
Language Spoken: English,Chinese
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range