CMAX Tower Crane TC 7034 Construction Machine

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 12t Maximum Lifting Height(M): 200m Rated Loading Capacity: 12t
Span: 70 Rated Load Moment: 12

Product Description:

CMAX Tower Crane TC 7034 Construction Machine

Product Description:

Descriptions of our tower crane:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our tower crane:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2,It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.







FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:1000 paper cranes myth?
I believe it too. You just make 1000 paper cranes, and I think that only the victim of the disease is supposed to make it. Oh yea, and you hang the cranes around the victim. This is kind of irrelevant, but once i read a book Sadako and the Thousand Paper Cranes. It's about a girl who tries to make 1000 paper cranes in order to get cured. It's really sad, but that's where I'm getting my info from.
Q:Are there cranes in North America?
There okorder.com
Q:books about the physics of a tower crane?
Hi, Well, this is an interesting topic about physics and requires to have a basic knowledge, correct? So here we have some books: - Chopra, K. A. Dynamics of Structures: theory and applications to earthquake engineering. - Bostelman, R., et al. “Toward Next-generation Construction Machine,” Proceeding of American Nuclear Society 9th International Topical Meeting on Robotics and Remote Systems. - Gore, Bryson. Trucks, Tractors, And Cranes. - Grote Antonsson, editors. Handbook of Mechanical Engineering. - Seidel, Michael. Tensile Surface Structures. B-) FL ------------- You cannot teach a man anything; you can only help him discover it in himself.” (Galileo Galilei)
Q:calculating psf in regaurdto crawler cranes?
Not sure what you are asking exactly... Are you saying that you have a crane with a capacity of 100 tons and you want to know the pressure on the soil where the crane is positioned? In this case, you take the capacity (in pounds) plus the weight of the crane (in pounds) then divide their sum by the area of the tracks on the crane (in square feet). This will result in pounds per square foot or psf as you wrote above. These are example estimates, they may not be anywhere near the correct answer, this is simply how to do the calculation. Assumed Capacity 100 ton = 200,000 lbs. Assumed Weight 105 ton = 210,000 lbs. Assumed Area of Track = 200 square feet Note: 1 U.S. ton = 2,000 pounds = 2,000 lbs. 410,000 lbs / 200 square feet = 2,050 psf There's a start, now you just need to find out how much it actually weighs and how long and wide the tracks are to get the area of the track on the ground. I hope that answers the question you were asking.
Q:Detailed parameters of QTZ80 tower crane 50
The weight of the whole machine is 36.1 tons (independent height). Its balance weight is 15 tons, and the balance weight is 11.82 meters. The boom weight is 5.72 tons. It is necessary to use planetary gear.Usually use two rotary speed reducer of 8000 nm.
Q:What are the three different types of Cranes?
Skid Loader Tower Gantry
Q:If a crane fly loses a leg...?
Only lizards can release a part of their body, but only the tail. It probably lost its leg while it was flying because it had a string tightly wrapped around it for a long time and it finally just fell off. It would probably hurt them a little because the bloodflow would be cut off and it would be somewhat numb.
Q:What do you think of paper cranes?
dats so sweet .. really
Q:Tower crane four limit, two insurance, two insurance what is that?
Refers to the air switch and the electric leakage protector in the electric tray.
Q:IF YOU HAVE'T READ THIS BOOK, DON'T ANSWER! In Suzanne Collins novel, Catching Fire, who is Seneca Crane?
Seneca Crane is the previous Gamemaker who decided to allow Peeta and Katniss to live after the berry incident. The Capitol killed her and replaced her for that act of mercy. That's why Katniss hung her; she was rebelling against the Capitol and implying that they murdered Seneca Crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range