Wholesale painted galvanied cuplock scafolding
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 1000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Feature
1. Cuplock scaffolding system has high flexibility and high loading capacity. And it is mainly used to build bridges, tunnels, metro stations, and etc.
2. Cuplock scffolding is made by Q235 steel which is strong and durable.
3. A complete cuplock scaffolding system includes standards, ledgers, or diagonal braces.
4. The accessories of cuplock scaffolding system are cantilever bracket, side bracket, ladder bracket, ladder, intermediate, and etc.
5. One standard is welded an up cup and a bottom cup in every 500mm to join ledgers at different
heights.
6. One ledger is welded a ledger blade on both ends.
Specification
Item Name | Cuplock Scaffolding | |
Brand Name | Queen | |
Raw Material | Q235 /Q345steel Grade | |
Components | Standard.Ledger .Diagonal brace. Top/Bottop Cup/ Ledge Blade | |
Surface finish | Electric Galvanized/HDG/Powder coated | |
Size | Pipe size:48.3mm | |
Thickness:3.25mm | ||
Usage | Widely used in Bridge .Tunnel.Peterifaction.Shipbuilding .railway,Airport. Dock Industry and Civil Building | |
Packing | By Steel pallet or bulk | |
Standard | 48.3*3.25*500mm | 3.5kg |
48.3*3.25*1000mm | 5.6kg | |
48.3*3.25*1300mm | 8.0kg | |
48.3*3.25*1500mm | 8.75kg | |
48.3*3.25*1800mm | 10.6kg | |
48.3*3.25*2000mm | 11.4kg | |
48.3*3.25*2500mm | 14.0kg | |
48.3*3.25*3000mm | 16.70kg | |
8.3*3.25*4000mm | 20.36kg | |
Ledger | 48.3*3.25*650mm | 2.54kg |
48.3*3.25*914mm | 3.6kg | |
48.3*3.25*1065mm | 4.10kg | |
48.3*3.25*1150mm | 4.7kg | |
48.3*3.25*1570mm | 5.76kg | |
48.3*3.25*1829mm | 6.62kg | |
48.3*3.25*2130mm | 7.62kg | |
48.3*3.25*2438mm | 8.24kg | |
48.3*3.25*3050mm | 10.68kg | |
Diagonal brace | 48.3*3.25*915mm | 3.4kg |
48.3*3.25*1150mm | 4.04kg | |
48.3*3.25*1572mm | 5.34kg | |
48.3*3.25*1829mm | 6.13kg | |
48.3*3.25*2130mm | 7.06kg | |
48.3*3.25*2438mm | 8.01kg | |
48.3*3.25*3050mm | 9.90kg | |
Steel Plank | 210*45*1.2*1000/2000/3000/4000 | |
250*50*1.2*1000/2000/3000/4000 | ||
Screw jack base | 38*4.0*500mm | 3.35kg |
38*4.0*600mm | 3.65kg | |
48*4.0*600mm | 4.4kg | |
35*500mm | 4.5kg |
- Q: I'm gonna be getting piercings this weekend, so i know im already getting my nose. but i want to get my ear. like barbell? so what's the difference between Scaffold and Industrial?
- I agree with A Silent Reminder - They're the same thing, just called something different in different places. I find that people in the U.S call it an Industrial, and those in England call it a Scaffold.
- Q: Key points for safety of portal scaffolding
- 4, grade six and above six winds and rain, snow, fog should stop the scaffolding erection, demolition and construction operations.5, during the construction of the following shall not dismantle the rod: 1) cross support, horizontal frame; 2) even wall pieces; 3) reinforcement rods: such as scissors, horizontal reinforcement bar, sweeping pole, sealing rod, etc.;
- Q: How to calculate the double wall scaffolding
- The adjustment coefficient of the bearing capacity of the foundation: KC = 0.400;The average pressure of the bottom of the vertical rod foundation, P = N/A =84.900 kN/m2;Among them, the superstructure to the top surface of the axial force design value: N = 7.641 kN;Basal area (M2):A = 0.090 m2.P=84.900 = fg=200.000 kN/m2. Calculation of bearing capacity of foundation!
- Q: Want to rent the scaffolding in the county, you need to cast how much money
- A portal scaffolding about 200, a steel springboard around 50,
- Q: Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
- Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
- Q: I couldn't believe it, but yes it happened...
- With God all things are possible.
- Q: Can you do the outer scaffolding?
- 6 15cm. When the oblique rod in a span of two step distance, it is appropriate in the intersection of the large cross bar to add a small bar, the oblique abdominal rod fixed on its protruding end. 7, scissors (1) of the scaffold bridging with columns, longitudinal and transverse horizontal rod synchronous erection, with long scissors along the elevated continuous layout
- Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- Scaffolding steel pipe1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
- Q: The construction scheme of high rise and external cantilever scaffold!
- (2): Fastener fastener should comply with the "steel pipe scaffolding fasteners" (GB15831 1995). The provisions of fastener can't crack, porosity, trachoma and other casting defects. Surface fastener and steel tube to contact good fastener clamping steel pipe, the minimum distance of the opening should be less than 5mm.(3) the foot board; steel foot plate generally with thick 2mm steel plate, and the table has a uniform distribution of anti slip hole, board length 2~4m, width 250mm of fir or pine, board length 3~6m, width not less than 150mm.
- Q: Okay so I want to get either done, I just want to know which one is more painful. Not felling that nervous because I have had my nose and tongue done. I want to know which one is more painful and how to clean each of them. And also with the lip, is it more like the tongue with what foods you can eat and how hard it is to eat?
- Everyone is different as far as what piercings they think hurt more or less, but based on my own experience, I'd say the scaffolding hurt more by far. Now, I've never had my lower lip pierced, but I had my upper lip area (I used to have angel bites), so I'd image it would have to be similar to the lower lip as far as pain, care, healing. As far as cleaning them, it's like most other piercings, where the best thing for you to use is warm sea salt water. But although everyone's different, the lip is going to be the faster healing of the two I'd say for basically anyone. The scaffolding takes up to a year to fully heal. The lip heals relatively fast;usually anything involving your mouth area heals quicker than other areas of the body-I'm sure you noticed how your tongue healed fast. Or even if you accidentally bite or cut anything involving your mouth, tongue, inside of your cheeks, etc., it heals faster than other areas. As far as the foods other aftercare with it, it is somewhat similar to your tongue in caring for it-just follow your piercer's instructions you'll be fine. Good luck!
Send your message to us
Wholesale painted galvanied cuplock scafolding
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 1000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords