Product Description:

1.Structure of cup lock Description

cup lock system is one of the most popular used scaffolding system in the world.It is consisted of cup lock,vertical,ledger,limit pins,blades and base etc.

Packaging & Delivery

Packaging Details:

Pallet or bag or upon client's request

Delivery Detail:

35days

2.Main Features of cup lock

1) Using less pipes

2) Easy to install

3) It can be used again and again for nearly 20years

3.Cup lock product pictures:

Cup Lock  Scaffolding  with Painting in Construction

 4.Cup lock Product Description

Type:

ringlock scaffolding diagonal Brace

specification

Ø48.3×3.20

material:

steel Q235

Finished

Hot DIP galvanized, painted

Diagonal length(m)

Weight(kg)

0.9m * 1.25m

6.28

1.25m * 1.8m

8.6

1.25m * 2.7m

11.45

  5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1) How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

-Cup lock Scaffolding(C-Lock Scaffolding)

-Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2) How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:What are the main safety problems when dismantling the scaffold
3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
Q:scaffold, where to buy?
Unless you need it constantly it might be cheaper to rent as most contractors do. Home Depot, Safeway Rentals or most any tool and equipment rental outfit rents it at pretty reasonable rates.
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Zpd And Scaffolding
Q:Exterior wall scaffold construction plan?
Foundation treatment:Pit backfill every 30cm thick layer by ramming into vibration compaction, compaction by cutting ring sampling test, the bearing capacity of Rammed Soil reached 60270KN/m2. And then in the compacted soil C15 cast in situ concrete hardening, thickness 100mm. The foundation of all scaffolds must be smooth. On the basis of the base plate, the thickness of not less than 50mm, the layout must be smooth, shall not be suspended; and in the periphery of the scaffolding outside the vertical rod 50cm set up a shallow ditch drainage.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
Q:Which kind of scaffolding is the most convenient and time-saving?
3, low cost (can speed up the construction schedule, shorten the construction period), large spatial scaffolding in the same condition, the new building quick dismantling scaffold material ratio of bowl type multifunctional scaffold, the same specifications of single member weight than the bowl type multifunctional scaffolding light.
Q:opinions on scaffolding piercing and how to hide it from school :)?
Why do you have to hide it? It's an ear piercing. And to hide it, just cover it with your hair.
Q:Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
PoleName specification A (mm) B (mm) theoretical weight (kg)Riser LG-60 6004LG-120 12007.41LG-180 180010.67LG-240 240014.02LG-300 300017.31
Q:Fastener type steel pipe scaffold composed of which components?
3.2 fasteners3.2.1 fasteners shall be made of malleable cast iron or cast steel, the quality and performance shall be in accordance with the current national standardRegulation of GB15831 for pipe scaffold fastener. Fasteners made of other materials shall be tested and verifiedQuality meets the requirements of this standard before use.3.2.2 fasteners in bolt tightening torque to 65N * m, shall not be damaged.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range