Galvanized Cuplock Scaffold from wholesale China factory
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 100000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Galvanized Cuplock Scaffold from wholesale China factory
Quick Details
Place of Origin: | Shandong China (Mainland) | Brand Name: | HILONG | Model Number: | HL |
Size:: | 48.3*3.25mm | Material:: | Steel (Q235/Q345) | Surface:: | Electro Galvanized/Self Color/Painted/HDG |
Category:: | Scaffolding system | Component:: | Standard, Ledger, Diagonal, Bracket, Top&Bottom cup, Ledger blade etc | Advantage:: | Durable,Stable,Skid-proof,Antirust,Easy to assembleandDismantle |
Service: | OEM, custom-made | Application: | Highways,Subways,Slab support,staircasecal | Delivery Time: | 15-25 days after deposit |
Package: | Bulk, Steel Pallet, Crate, Ton Bags, or as your requests |
Packaging & Delivery
Packaging Detail: | Bulk, Steel Pallet, Crate, Ton Bags, or as your requests |
Delivery Detail: | 20 days |
Specifications
1.OEM Service, internantional standards
2.competitive price,fast delivery,good service
3.over ten-years experience
4.sample
FAQ
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
We can provide you the professional design team.
We can provide fashionable and newest styles for you.
We can design the artwork for you.
Please feel free to customize.
2) What promises can be done by us?
If interested in Aluminum-Frame Formwork, please feel free to write us for any QUOTE.
If printing required, please advise asap because the whole set need much more time to complete.
Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale service?
Response will be carried out in 24hours after receiving any complain or request.
Aluminum-Frame Formwork cost can be refund after order is confirmed.
If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
Packing: As Customer's Requirements
Shipping: We have various shipping ways for our customers,
such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. By air/ sea, and we are VIP of these express.
- Q: has anyone done this? Does this work out really well?thanks,Chad
- I stumbled onto a deer stand like this in the woods and thought it seemed like a great idea. Make sure you chain it to a tree so it doesn't tip over.
- Q: Hello, in a Construction project who is required to check the scaffolding equipment?check the installation? and frequently check the scaffold during the day?is it the Planning supervisor, Contractor, Principle contractor, CDM coordinator or Works manager
- as a builder for over forty years ..i have never seen anybody check the scaffold once it is erected ..and providing it has not been altered it is the scaffolding contractor who is responsible for it ..and its extremely rare for a contractor to have his own scaffolders ..here in the uk they have work strictly to a code of practice and carry a public liability insurance
- Q: Okay, I'm wanting to get my scaffold pierced, I'm just curious on how much they hurt, and how much they cost. Another thing, how long is it before it heals?
- Hurts very bad- cost varies
- Q: A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold. If the plank's mass is 20kg , how close to the left end of the plank can he stand without tipping the plank? ( The scaffold supports are 2.5m apart, and the plank extends beyond the scafold supports, 1.5m on each end.)
- The mass of the plank on the left side of the scaffold is: M? = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L? = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T? = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M? = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L? = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T? = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T? = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
- Q: Why do a mobile tower scaffolds have wheels fitted with brakes?
- So it can be partially assembled, moved into position, then the brakes are put on so it doesn't move while it's in use.
- Q: The role of scaffolding and the basic requirements for scaffolding
- There are commonly used scaffolding scaffolding steel pipe scaffolding, door type steel pipe scaffolding, bowl buckle steel tube frame, etc. in addition to the attached lifting scaffolding, hanging basket scaffolding, hanging scaffolding
- Q: What are the main types of bowl buckle scaffold
- Scaffolding is a style of scaffold. This scaffold than often see the fastener scaffold much better. The first is to build much faster. Once again, small accessories will not fall. (fastener will often off the little parts).
- Q: Scaffolding step span, span, the vertical rod spacing is how much
- Distance refers to the distance between the adjacent two large bars, the middle of a protective bar.
- Q: How to weigh the weight per meter of wrist button scaffold
- The longest component of the scaffold 3130MTM, the most reconstruction pieces 40.53KG.
- Q: Hi im thinking of buying some Industrial Jewelry online but im not sure about the measurements. My recipt for my piercing says a 14g 1/4 barbell was used.
- From what I see on the site, pick the 14GA 11/4 option since it's long enough to go through the top of your ear. Seems there was a little typo on the receipt your piercer gave you. The mm measurements next to each of the sizing options refer to the diameter of the balls on either side. Hope that helped!
Send your message to us
Galvanized Cuplock Scaffold from wholesale China factory
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 100000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords