Tower Crane VFD PLC Trolleying Mechanism
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC7021(QTZ250)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC7135
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 50、55、60、65、71 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 16 | ||||
Tip load @ 71m(t) | 3.5 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-4 | 0-8 | 0-8 | 0-16 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF280-8-55KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YPBE132M-4-7.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YLEW112M-6-120N.M×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 26 | ||||
Mast section size(L×W×H)m | 2×2×3 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 95 | ||||
Power supply requirement (KVA) | 255KVA for generator | ||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 260A | ||||
Rated working voltage & current | 380V 146A |
Loading diagram:
70m jib length:
R | 3.7~18.26 | 20 | 22 | 24 | 26 | 28 | 30 | 32 |
4 Falls (t) | 16 | 14.48 | 13.02 | 11.8 | 10.77 | 9.89 | 9.12 | 8.45 |
R | 34 | 36 | 38 | 40 | 42 | 44 | 46 | 48 |
4 Falls (t) | 7.86 | 7.34 | 6.87 | 6.44 | 6.06 | 5.71 | 5.39 | 5.1 |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 |
4 Falls (t) | 4.84 | 4.59 | 4.36 | 4.15 | 3.95 | 3.76 | 3.59 | 3.43 |
R | 66 | 68 | 70 | |||||
4 Falls (t) | 3.28 | 3.14 | 3 |
71m jib length:
R | 4.7~35.36 | 36 | 38 | 40 | 42 | 44 | 46 | 48 |
2 Falls (t) | 8 | 7.98 | 7.38 | 6.96 | 6.58 | 6.24 | 5.93 | 5.64 |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 |
2 Falls (t) | 5.37 | 5.13 | 4.9 | 4.7 | 4.5 | 4.32 | 4.15 | 3.99 |
R | 66 | 68 | 70 | 71 | ||||
2 Falls (t) | 3.84 | 3.7 | 3.56 | 3.5 |
65 m jib length:
R | 3.7~19.55 | 21 | 23 | 25 | 27 | 29 | 31 | 33 |
4 Falls (t) | 16 | 14.79 | 13.36 | 12.16 | 11.15 | 10.27 | 9.5 | 8.83 |
R | 35 | 37 | 39 | 41 | 43 | 45 | 47 | 49 |
4 Falls (t) | 8.24 | 7.7 | 7.23 | 6.8 | 6.41 | 6.05 | 5.73 | 5.43 |
R | 51 | 53 | 55 | 57 | 59 | 61 | 63 | 65 |
4 Falls (t) | 5.15 | 4.9 | 4.66 | 4.44 | 4.24 | 4.05 | 3.96 | 3.7 |
65m jib length:
R | 4.7~38 | 39 | 41 | 43 | 45 | 47 | 49 | 51 |
2 Falls (t) | 8 | 7.77 | 7.35 | 6.96 | 6.61 | 6.29 | 5.99 | 5.72 |
R | 53 | 55 | 57 | 59 | 61 | 63 | 65 | 66 |
2 Falls (t) | 5.47 | 5.23 | 5.02 | 4.81 | 4.62 | 4.45 | 4.28 | 4.2 |
60m jib length:
R | 3.7~21.45 | 22 | 24 | 26 | 28 | 30 | 32 | 34 |
4 Falls (t) | 16 | 15.57 | 14.13 | 12.93 | 11.89 | 10.99 | 10.2 | 9.51 |
R | 36 | 38 | 40 | 42 | 44 | 46 | 48 | 50 |
4 Falls (t) | 8.89 | 8.34 | 7.84 | 7.4 | 6.99 | 6.61 | 6.27 | 5.96 |
R | 52 | 54 | 56 | 58 | 60 | |||
4 Falls (t) | 5.67 | 5.4 | 5.15 | 4.92 | 4.7 |
60m jib length:
R | 4.7~41.9 | 44 | 46 | 48 | 50 | 52 | 54 | 56 |
2 Falls (t) | 8 | 7.58 | 7.21 | 6.87 | 6.56 | 6.27 | 6 | 5.75 |
R | 58 | 60 | 61 | |||||
2 Falls (t) | 5.52 | 5.3 | 5.2 |
55m jib length:
R | 3.7~21.54 | 23 | 25 | 27 | 29 | 31 | 33 | 35 |
4 Falls (t) | 16 | 14.89 | 13.57 | 12.45 | 11.48 | 10.63 | 9.89 | 9.24 |
R | 37 | 39 | 41 | 43 | 45 | 47 | 49 | 51 |
4 Falls (t) | 8.65 | 8.13 | 7.65 | 7.22 | 6.83 | 6.47 | 6.14 | 5.84 |
R | 53 | 55 | ||||||
4 Falls (t) | 5.56 | 5.3 |
55m jib length:
R | 4.7~41.6 | 43 | 45 | 47 | 49 | 51 | 53 | 55 | 56 |
2 Falls (t) | 8 | 7.71 | 7.33 | 6.98 | 6.65 | 6.35 | 6.08 | 5.82 | 5.7 |
50m jib length:
R | 3.7~22.4 | 24 | 26 | 28 | 30 | 32 | 34 | 36 |
4 Falls (t) | 16 | 14.85 | 13.58 | 12.5 | 11.56 | 10.74 | 10.011 | 9.37 |
R | 38 | 40 | 42 | 44 | 46 | 48 | 50 | |
4 Falls (t) | 8.79 | 8.27 | 7.8 | 7.38 | 6.99 | 6.63 | 6.3 |
50m jib length:
R | 4.7~43.6 | 44 | 46 | 48 | 50 | 51 |
2 Falls (t) | 8 | 7.92 | 7.53 | 7.18 | 6.85 | 6.7 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: Did not city officials think of the danger if they toppled.
- CHEAPER TO HAVE THEM KILL PEOPLE THEN PAY TO TAKE THEM DOWN.
- Q: i live in cali and these things are really starting to piss me off!!!!!!! I never noticed any before ( when i lived in colorado) but it seems lately that they are all over!!!! every time i open my damn door AT LEAST 5 of them come in! THERE SO GROSS with there big hanging legs! EWWWWW! Anyways, when will they go away and what do i do to keep them from getting in my house?
- The crane fly season only last for a month or so. There are years when they can reach almost plague proportions but within another 2-3 years their numbers should return to normal.. They can cause some damage to farm crops but the good news is that they are harmless to us.
- Q: Is there an effective utility for estimating the required size of a crane? I’m an estimator for a mechanical contractor, and it seems we never allow enough money for crane rental. How can I effectively adjust my estimates?
- The only effective way to estimate the size of a crane when needed is to know, without a doubt the weight of the heaviest thing that you have to lift, and allow at least a 20% margin for safety. This is standard practice in building bridges, in particular - the weight of EVERYTHING is clearly marked, or just generally known. If there are bridge segments to load on a barge, for example and the heaviest segments are 220 tons, then a 300 ton crane is used. Always err on the side of safety.
- Q: On Batman Begins what is Dr. Crane's full name?
- Dr. Jonathan Crane.
- Q: how to draw a crane hook on auto cad?
- Measure a crane hook then draw it. Even better, visit a manufacturer's web site and see if you can download one of their drawings for a hook.
- Q: list of people confirmed dead from crane accident nyc?
- i imagine they are injuries. regrettably those who artwork for the city authorities - a minimum of in lengthy island - are extremely incompetent and corrupt. What makes you say that No inspector ought to deliberately ignore a risky contemporary challenge ? That 's precisely what the inspector of the first crane crumple did. Oops, my mistake. He did not verify the cranes in any respect. And all those those who died lately in structure by utilising being blown off by utilising wind from large heights??!! I have in no way heard something like that in the previous. Who supplies those people the needed facilitates?? How educated are those people? the position is their union?
- Q: What can paper crane symbolize?
- Paper crane symbolizes peace and freedom.
- Q: Has anyone actually folded 1000 paper cranes? i want some proof
- no and no proof
- Q: What type of crane done the lift?what type of object was the crane lifting?what was the weight of the load being lifted?
- the lift capacity of the Crane is pretty much dictated by the type of crane it is. The largest Gantry / Bridge type is capeable of 1,500 tons.. the largest tower is 100 tons w. a 100meter turning radius. Tracked lattice boom type is 1,600 tons...........(self contained) there's one that will do 4000 tons with modifications including seperate tracks for counterweights
- Q: mobile tower etc (uk)
- Tower cranes and Gantry Cranes Since toer cranes are the most used in the construction industry gantry Cranes are used in all Ports for loading and unloading containers has a vast scope of work
Send your message to us
Tower Crane VFD PLC Trolleying Mechanism
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords