Tower Crane Mini Crane Luffing Trolleying

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 8T Maximum Lifting Height(M): 200M Rated Loading Capacity: 1.3T
Span: 56M Rated Load Moment: 80T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5613(QTZ80) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

Technical Sheet for TC5613

 

Free standing height (m)

46

Max height with attachment (m)

150200

Working range can be adjustedm

445056

Min working rangem

2.5

Max lifting capacityt

8

Tip load @ 56mt

1.3

Hoist mechanism

Falls

2

4

Lifting capacityt

02

04

04

08

Speedm/min

080

040

040

020

Motor

YZRWFc250M-4/8     30/30KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4 /8/16   3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

00.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.5

Counterweightt

14.1

Mast section sizeL×W×Hm

1.8×1.8×2.5

Working temperature

-40+60

Total power (KW)

42

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 40 meters from site power source to lower

electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A

Loading diagram

 

56m jib length

R

2.5—13.7

14

20

24.9

26

32

35

38

44

50

56

a=2

4t—24.9m

3.80

2.94

2.63

2.36

1.94

1.63

1.38

a=4

8t—13.7m

7.79

4.12

3.92

3.72

2.86

2.55

2.28

1.86

1.55

1.30

 

50m jib length

R

2.5—15.1

16

22

26

27.6

32

35

38

42

50

a=2

4t---27.6m

3.34

2.99

2.70

2.37

1.88

a=4

8t-15.1m

7.48

5.15

4.22

3.92

3.26

2.91

2.62

2.29

1.80

 

44m jib length

R

2.5—16.3

20.9

26

29.8

32

35

38

40

42

44

a=2

4t---29.8m

3.69

3.31

2.99

2.79

2.63

2.48

a=4

8t---16.3m

6.0

4.64

3.93

3.61

3.23

2.91

2.72

2.55

2.40

 

 Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane Main Section TC5613 in China

Tower Crane Main Section TC5613 in China

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:do you know where Ty Crane is now? The one in the film coach carter.?
Ty Crane is the next ersan ilyasova (PF Bucks)
Q:How did Romans make columns in roman times Without cranes?
Columns weren't one piece - they were stacked. They had cranes of a type the used human lifting power.
Q:I'm looking to buy a sweet grabber machine (crane)?
Do okorder.com/ There's some at the bottom there for sale for only $2175 if you're willing to shell out that much. Cheers
Q:i will like to crane operator?
You made a statement, you will like to crane (an) operator. Which operator is it you are going to like to crane? If you mean would you like to operate a crane, that is up to you. If you mean can you be a crane operator, that is up to an employer. You need to be employed as one, and that probably means training and experience before being allowed to operate cranes for him/ her.
Q:is it ok to have an open crane?
I have no idea what an open crane is? Do you mean you leave her outside all day? If so, the answer is no. Dobermans don't have the right type of coat to be left outside all day even with shelter.
Q:where can i find the xxx video of bob crane?
I think they're in police custody or destroyed. Some of the women in his videos were suspects (or at least persons of interest). Police feel his murder may have been by a jealous husband or boyfriend. In just recent years someone was tried for the murder and they were found not guilty. If you ever do find videos of Crane tell me where.
Q:When the tower crane foundation is found, what should be discontinued?
The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped
Q:Would David have made a better babysitter than a crane driver?
none of the crane accidents were fatal, a black lad was slightly injured though
Q:I need help on finding the least amount of steps on how to make an oragami crane.?
Start with a square piece of paper. You got that? Fold the paper corner to corner to get a large right triangle, and fold it corner to corner again to get a smaller triangle. You got that ,or did I lose you. Open the paper, and you will see a big X. Never mind the X. We will come back to it. Now fold the paper side to side to get a rectangle, and fold the two SHORT SIDES to the X fold. Open and do the other two by repeating what you just did. Open the paper FLAT. You can now see a 4 pointed star. Along the four sides of the square, push down on the perimeter of the star to make the star come up. Fold down until you have a flat KITE. Make sure you have 2 flaps on each side. What you are looking at now is one wing, and the other one is in the back. The neck and head are inside the wings. Pull them out half way to expose them. Fold one side at the tip to make a head. If you did everything correctly, and hold under the neck with one hand and pull the tail with the other hand, the crane should flap its wing. Write back if you need more help.
Q:Can anyone summarize this article for me its about Manslaughter Charges Expected in Crane Collapse?
The City is covering itself by shifting the blame form a negligent city inspector to the crane company by charging its owner with Manslaughter Charges. This is typical of civil service personal who forget who they work for (We the People).

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range