• Tower Crane Mini Crane Luffing Trolleying System 1
  • Tower Crane Mini Crane Luffing Trolleying System 2
  • Tower Crane Mini Crane Luffing Trolleying System 3
  • Tower Crane Mini Crane Luffing Trolleying System 4
  • Tower Crane Mini Crane Luffing Trolleying System 5
  • Tower Crane Mini Crane Luffing Trolleying System 6
Tower Crane Mini Crane Luffing Trolleying

Tower Crane Mini Crane Luffing Trolleying

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Maximum Lifting Weight:
8T
Maximum Lifting Height(M):
200M
Rated Loading Capacity:
1.3T
Span:
56M
Rated Load Moment:
80T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5613(QTZ80) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

Technical Sheet for TC5613

 

Free standing height (m)

46

Max height with attachment (m)

150200

Working range can be adjustedm

445056

Min working rangem

2.5

Max lifting capacityt

8

Tip load @ 56mt

1.3

Hoist mechanism

Falls

2

4

Lifting capacityt

02

04

04

08

Speedm/min

080

040

040

020

Motor

YZRWFc250M-4/8     30/30KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4 /8/16   3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

00.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.5

Counterweightt

14.1

Mast section sizeL×W×Hm

1.8×1.8×2.5

Working temperature

-40+60

Total power (KW)

42

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 40 meters from site power source to lower

electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A

Loading diagram

 

56m jib length

R

2.5—13.7

14

20

24.9

26

32

35

38

44

50

56

a=2

4t—24.9m

3.80

2.94

2.63

2.36

1.94

1.63

1.38

a=4

8t—13.7m

7.79

4.12

3.92

3.72

2.86

2.55

2.28

1.86

1.55

1.30

 

50m jib length

R

2.5—15.1

16

22

26

27.6

32

35

38

42

50

a=2

4t---27.6m

3.34

2.99

2.70

2.37

1.88

a=4

8t-15.1m

7.48

5.15

4.22

3.92

3.26

2.91

2.62

2.29

1.80

 

44m jib length

R

2.5—16.3

20.9

26

29.8

32

35

38

40

42

44

a=2

4t---29.8m

3.69

3.31

2.99

2.79

2.63

2.48

a=4

8t---16.3m

6.0

4.64

3.93

3.61

3.23

2.91

2.72

2.55

2.40

 

 Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane Main Section TC5613 in China

Tower Crane Main Section TC5613 in China

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Q:I read a book a year ago about sadako sasaki who tried to make all 1000 paper cranes to live. Do you have to keep saying your wish over again when your making them, and when you finished making all 1000 how long did you wait until your wish came true??
you make your wish once your done cause you only get the wish if you have 1000 cranes right so saying your wish when you only have 6 won't do anything. it can come true the next day till the next year or ten years it not something definite. I've never made 1000 but I think I will.
Q:I need to know how Stephen Crane came up with writing the Red Badge of Courage. I need examples of his life experiences that he had and then he put them in the Red Badge of Courage.
In March 1893, while spending hours lounging in his friend Corwin Knapp Linson's studio while having his portrait painted, Crane became fascinated with old Civil War issues of the Century published between 1884 and 1887. Largely devoted to famous battles and military leaders, the writing was dry and lifeless and Crane, frustrated, said to Linson, I wonder that some of those fellows don't tell how they felt in those scraps. They spout enough of what they did, but they're as emotionless as rocks. Crane returned to these magazines during subsequent visits to Linson's studio and eventually the idea of writing a war novel overtook him. He would later state that he had been unconsciously working the detail of the story out through most of his boyhood and had imagined war stories ever since he was out of knickerbockers. This novel, which he believed would make him famous, would ultimately become The Red Badge of Courage. From the beginning, Crane wished to show what it felt like to be in a war by writing a psychological portrayal of fear. Conceiving his story from the point of view of a young private who is at first filled with boyish dreams of the glory of war and then quickly becomes disillusioned by war's reality, Crane borrowed the private's surname, Fleming, from his sister-in-law's maiden name. Crane would later tell Hamlin Garland that the first words and paragraphs came to him with every word in place, every comma, every period fixed.
Q:Are Crane Flies Venomous?
Crane flies are non-venomous and non-biting .It is a common myth that the daddy long-legs would be the most poisonous animal if only it knew how to use its poison, but this is false. There are 300 species in Britain with the commonest being the entirely harmless, if annoying, Tipula Paludosa. They are completely harmless and only live for around three days as adults.
Q:They;re ENORMOUS!!! Do they take them apart or something?
They are broken down into smaller unit pieces and are transported by truck or rail.
Q:I know, do you know?
They build it on the ground, raise it up with another crane, and then lift the counter weights up!
Q:i read this comment on youtube about people making 1000 paper cranes for japan is this a real thing like can i make paper cranes and mail them to some place if anyone knows the details you would be helping me out because i already started making paper cranes and its such a small but beautiful thing plz help
I think it's better to donate money through help Japan on Yahoo! top page or something. Sorry. But paper cranes are not practical help for those who are suffering.
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:which is crane lift planning software free to download?
autocad based
Q:Old used 200 t crawler crane is available for purchase. What are the guidelines/ thumb rules for assessing its cost ?
Supply vs demand Extreme examples: If the crane is no longer needed anywhere, the cost will be 0; no demand. If the crane still has a unique useable function and there is only one available, it's immediate cost will be very high; no supply. So, assuming that the cranes supply/demand is somewhere in the middle, the methodology for assessing it's cost would be to evaluate the following: * Where is it located with respect to where it is needed? (place value) * How quickly do I need it, and how quickly can I get the crane? (time value) * What alternative solutions are available? * How much do other similar cranes cost? * etc Hope this helps!
Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords