• Luffing Jib Tower Crane for Building Hot Sale System 1
  • Luffing Jib Tower Crane for Building Hot Sale System 2
  • Luffing Jib Tower Crane for Building Hot Sale System 3
  • Luffing Jib Tower Crane for Building Hot Sale System 4
  • Luffing Jib Tower Crane for Building Hot Sale System 5
  • Luffing Jib Tower Crane for Building Hot Sale System 6
Luffing Jib Tower Crane for Building Hot Sale

Luffing Jib Tower Crane for Building Hot Sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our Hot Sale Luffing Jib Tower Crane for Building


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Hot Sale Luffing Jib Tower Crane for Building


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our Hot Sale Luffing Jib Tower Crane for Building


Luffing Jib Tower Crane for Building Hot SaleLuffing Jib Tower Crane for Building Hot SaleLuffing Jib Tower Crane for Building Hot SaleLuffing Jib Tower Crane for Building Hot SaleLuffing Jib Tower Crane for Building Hot Sale


Luffing Jib Tower Crane for Building Hot Sale

FAQ Topkit Cranes Rental Tower Crane Specification

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: (a)What is the power output of the crane. (ignoring losses)?(b)If it takes the cran2 2 minutes to raise the payload to its final height, how far above the ground is this?(c)If the cable were to break as the payload reaches its final height, how fast would it be traveling as it hit the ground?
a) As the crane is lifting at constant speed, there is no acceleration on the payload, therefore the net forces on the payload are equal to 0. Therefore the crane overcomes just the force of gravity = 500*9.81 = 4905 N Power = force * velocity = 4905 * 0.7 = 3433.5 W b) distance = speed * time = 0.7 * (2 * 60) = 84 m c) assuming that the cable breaks while it is still going up at 0.7 m/s, therefore initial velocity upwards = 0.7 m/s. using v? = u? + 2as: v? = 0.7? + 2(-9.8)(-84) = 1646.89 v = √(1646.89) = 40.9 m/s the payload will be travelling at 40.9 m/s when it hit the ground.
Q: What makes a crane so strong?
Cranes are built using a structural technique called a truss which is characterized by looking like a series of triangles connected together. That structure prevents the members from having to resist any bending loads. All of the truss members experience only tension and compression, no bending. That is an extremely efficient structure which is why they can be so strong without being monstrously heavy. Or if you prefer the short answer, engineers make the crane so strong.
Q: What do you do after you made 1000 paper cranes. I know you string them up, but storing them is hard. Do you ceremoniously burn them or what? When can they be gone? This is the missing link in the story I want to know. I have 846 and I want to know what to do after I'm done.
i know this big organisation in Japan and some of my frineds live there... if you are interested, I can give you the address and more details...etc
Q: I am doing uni coursework to design an ergonomic layout for an operator cab for a tower crane and so I need to list the required operator controls.Thanks!
There are only two control levers that are on a tower crane.There is one on either side of the seat called joy sticks the right side joy stick controls the hoist cable to go up and down pushed forward to go down and pulled back to hoist up.The left has four functions it controls the swing of the crane and also the boom of the crane to control the swing you push the lever to the left to swing left and push the lever right to swing right.You pull the lever back to boom up and puh it forward to boom down.
Q: I still cannot grasp how a crane was taken apart on a building with no roof
They used a climbing crane , and who said that the building has no roof? the crane parts can be dismantled on site and removed either by helicopters or using the construction lifts
Q: I saw this documentary on ancient buildings like the pyramids and it said that we don't have a construction crane that can life the stones used to build some of these ancient structures.So I gotta wonder how much the strongest crane CAN lift....or is that just fantastical nonsense about cranes not being able to lift those blocks?
First, okorder /. This means that at 5 m the capacity is 600 tonnes. Double the radius, half the capacity. A crane located at the foot of the pyramid, will be at 115.2 m from the center. At that radius, the crane could only lift 26 tonnes, so this crane could not lift the greatest stones weighing 80 tonnes. Being the boom only 100m it could'nt even reach the center.
Q: I want to know how to make the best and easyist paper crane with origami.
How okorder /
Q: stories about paper cranes?
Sadako and the Thousand Paper Cranes by Eleanor Coerr - about a girl who gets luekemia from the Atom bomb dropped on Hiroshima and her making paper cranes to pass the time in the hospital.
Q: Form the movie Dreamer, daughter of Ben Crane
It was Dakota Fanning that played Cale Crane, daughter of Ben Crane in the film Dreamer: Inspired by a True Story. She's a good little actress. I love to watch her films.
Q: a/ Calculate the lift workb/ What is the power used by the crane when the efficiency is 60%? (Can you explain for me what efficiency means)c/ What will the kinetic energy of the load be when it hits the ground, if it falls from the height 8.5 meters, g=9.81 m/s^2Thank you.
The work done (W)= Force*Distance. Force is 9.81*3000kg. So W = 9.81*3000*8.5 = 250,155 J Power (P)= Work(W)/Time(t) = 250,155/15 = 16,677 W 60% efficiency means that the lift is only using 60% of its maximum amount of power output. So to find 100% (lets call it x) of the crane's efficiency, consider the following: x * 0.6 = 16,677 x = 16,677 / 0.6 = 27,795 W Total mechanical energy in a system remains constant, so the kinetic energy the moment it hits the ground equals the potential energy when it is still hanging in the air. Potential energy = mgh = 3000x9.81x8.5 = 250,155 J You know this is correct, because it is the same amount of work the crane performed on the object to lift it.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords