• Slewing Mechanism for Tower Crane System 1
  • Slewing Mechanism for Tower Crane System 2
  • Slewing Mechanism for Tower Crane System 3
Slewing Mechanism for Tower Crane

Slewing Mechanism for Tower Crane

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
1 Set pc
Supply Capability:
1000 Sets Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Description of Slewing Mechanism for Tower Crane

We're specialized in tower crane parts, mast section. anchore frame, fixing angle, pin, bolt, various mech, assembly and spare parts, control box, resistance box and spare parts, drive room and spare parts, wire rope, pulley, cable etc

 

Our main products are CMAX type tower crane parts, mast section. anchor frame, fixing angle, pin, bolt, various mesh, assembly and spare parts, control box, resistance box and spare parts, drive room and spare parts, wire rope, pulley, cable etc. complete anti-parts

1.We  are state-owned company and well-funded;

2.State-level R&D department;

3.Competetive price and great quality;

4.Complete after-service system;

5.Experienced in the import&export business

 

 

Specifications Suitable Model: TC4808,TC5013,TC5610,TC5516,TC5613,TC6014,TC6016,TC6024,TC6520,TC7021,TC7034,TC7135,TC7050

 

We supply different types of mast sections, anchorage collar and base frames for widely used tower crane models, with high performance and reasonable cost.

 

Packaging & Delivery:

frame container

about 15-30 days after receiving T/T payment

slewing

 

 slewing

Q:What kind of electrical equipment do you have? What are the main components of each device?
1 、 electrical equipment part of electrical equipment mainly refers to: substation and distribution of power equipment and local scattered power, lighting distribution box. Such as: dry type power transformer, high voltage and low voltage power distribution cabinet, control the use of DC cabinet (with battery), standby uninterruptible power supply cabinet, lighting distribution box, power distribution box (cabinet), power factor capacitor compensation cabinet and standby diesel generator etc.. The utility model is characterized in that the rated voltage is mostly 10KV380V/220V by the combination of independent functional electric components, and the voltage is only 24V or 12V in the control system only.
Q:What functions should be achieved in mechanical structure design?
Mechanical structure design plays an important role in mechanical design. This chapter mainly discusses the characteristics, steps and mode of thinking of mechanical structure design. The working principle and design requirements of the machine assembly is a major factor in determining the structure and shape of the parts, followed by the selection of materials, manufacturing process requirements, which has the advantages of good manufacturability (processing and assembly). In addition, the perfection of the structure and shape of the parts has a great influence on the strength and stiffness.
Q:How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
The whole circle of the triangle is welded as an angle weld, and the other is the outer circle with the same diameter as the two, so the butt joint is better to open the groove. Welding, for V type welding seam, and, technical requirements are generally, welding firm, no defects, welding smooth grinding, cleaning welding slag splash
Q:What is the difference and connection between equipment manufacturing and machine building?
When our company went to the training center of the Department of industrial engineering of Tsinghua University, the professor of Qinghua University told us about it. Equipment manufacturing industry is a general term for the equipment provided for the national economy and national security
Q:Construction Engineering, moving equipment and stationary equipment, respectively
2. Static equipment: reaction equipment (code R). Such as reactor, reaction kettle, decomposition pot, polymerizer, autoclave, converter, digester, steam ball, sulfonation pot, gas producer and so on. Heat exchange equipment (code H). Such as tubular waste heat boiler, heat exchanger, evaporator, condenser, cooler, heater, sterilization pot, water jacket, etc. for dyeing dryer, steamer, cooker, gas preheating. Separation equipment (code S)
Q:What is the use of spare parts prices in Chinese market by foreign companies?
But there is always somebody to ask, just like a college paper, where everyone can read or keep secrets, but collecting them and sending them to foreigners is a sign of treason
Q:Building materials, equipment, components and fittings products must have "three certificates" is what cards?
Three is a business license, certificate of product quality, product quality inspection certificate. Business license is the legal provisions of some industries must be licensed, and handled by the competent department of the operating permit, such as tobacco monopoly license, drug business license, business license and other dangerous chemicals.
Q:Where was the construction machinery conference held in 2015?
Organizer: China Academy of machinery science and engineering machinery and military modified vehicle testing center, Shandong Bada International Engineering Machinery Company Limited, Shandong Bada Luqiao Construction Co. Ltd. and Shandong northern Luqiao Engineering Company Limited. Organizer: Shandong Bada international engineering machinery City, Lee brothers auction, Beijing Shengda Trade Center, Hing Beijing power machinery and equipment in the international science and Technology Co Ltd
Q:What are the sub projects of a construction project?
Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects
Q:How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords