• Rubber Seal 5'' System 1
  • Rubber Seal 5'' System 2
  • Rubber Seal 5'' System 3
  • Rubber Seal 5'' System 4
  • Rubber Seal 5'' System 5
Rubber Seal 5''

Rubber Seal 5''

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 pc
Supply Capability:
100000pcs Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Name: Concrete Pump Rubber Seal 5''

1. Specification of Concrete Pump Delivery Rubber Seal 5''

     Materials:  ruber

     Inner Diameter: 125mm, 100mm

     Outer Diameter: 148mm, 127mm etc.

     Flange size: 148mm  127mm

     Flange type: SK flange, ZX flange

     Standards: ASTM A128-C

Color: Black

Notes: Total series of Concrete Pump Rubber Seal for different brand concrete pump (PUTZMEISTER, SCHWING, CIFA, SANY, ZOOMLION, IHI, KYOKUTO Etc)available from us, different length, different raw material pipe for customers choices.

2.  Application of Concrete Pump Rubber Seal 5''

     Widely used on concrete pump truck, concrete placing boom, trailer concrete pump etc, for concrete delivery.

     Our concrete pump delivery pipes have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc

      Aiming at the largest concrete pump parts manufacturer, and reliable, professional supplier in China, we can supply concrete pump elbows, delivery pipes, casting or forging couplings, end rubber hoses, rubber pistons, tungsten wear plates, delivery cylinders, and other hydraulic parts, one stop service for your concrete pump parts and accessory business.

3.   Package and Delivery of Concrete Pump Rubber Seal 5''

 All the pipes directly put into Carton or woven bag,then put inot one 20feet or 40feet containers.

 

  

4.Production ofConcrete Pump Rubber Seal 5''

Our Concrete Pump rubber seals are made with advanced technology of rubber formula, rubber moulding,Baking, Etc, suitalbe for different size of pipe flanges.

 

concrete pum pipe  concrete pump delivery pipe factory

5. Primary Competitive Advantages

1) Brand-name Parts

2) Country of Origin

3) Competitive Price

4) Good Product Performance

5) Prompt Delivery

6) Quality Approvals

7) Good Reputation

8) Expedite Communication

9) Good Packaging

10) Distributorships Offered

11) One Step Service

12) Good Quality Service

13) Small Orders Accepted

14) Overseas Service Branches

 

Q: What are the mixing arms of the concrete mixer?
Concrete mixer parts often due to operational mistakes and equipment damage, we should know that the correct use of Yantai mixer parts, mixing arm not only can complete the "workload" on time, but also to extend the service life
Q: The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
The distribution of the construction site, construction machinery and electric hand-held electric tools, lighting, construction site construction site: risk factors and lightning protection, the construction site of common electrical tools and instruments, the construction site of the electricity management, common electrical fault, accidents and accident cases.
Q: What are the details of construction machinery parts in sand casting?
Lighting distribution box and other small appliances, slot box, detection control device, air inlet, bell, industrial TV, muffler and its components, dust removal equipment, and the communication line at the same time, a combination of the components installed. (4) refractory used for masonry at site.
Q: What is the use of spare parts prices in Chinese market by foreign companies?
You might be gathering information for him. You have no data for one person, if there are several people? They can analyze a lot of things through big data. You can't find out, you're OK. Once you find out, your whole life is over.
Q: How are the machine parts stacked?
Classification ah! Put small pieces of different sizes and functions into boxes and attach labels; larger items can be placed outside in a certain order (for example, function, length, value, etc.)
Q: Definition of large mechanical equipment?
The hoisting machinery used in bridge construction can be divided into three categories: light and small lifting equipment, bridge type crane and boom type crane. Light and small lifting equipment, such as jacks, hoists, winches, etc.. Bridge type lifting machinery, such as beam cranes, Longmen cranes and so on. Boom type cranes, such as stationary slewing cranes, tower cranes, truck cranes, tires, crawler cranes, etc..
Q: How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
Therefore, the medium carbon steel has the most extensive application in the medium strength level. Besides being used as building material, it is widely used in the manufacture of various mechanical parts. Welding: 1 the preheating is conducive to reducing carbon steel heat affected zone is the most
Q: What are the mechanical drawing software?
The 3D map only contact with SolidWords and Pro/E, Pro/E is better than Solidwords in general, but Solidwords is very simple to use, see Help tutorials you can learn to draw a three-dimensional map is not particularly complex easily to estimate a few days is enough. But any one of the two kinds of software, want to do not understand the words, expert advice is not really easy. UG and MasterCAM haven't touched much, but I've heard that it's suitable for processing stereogram.
Q: Where are the hanging baskets for the building?
It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;
Q: What are the construction materials, components, fittings and equipment in construction?
: construction engineering materials, components, fittings, equipment, each refers to: 1, engineering materials: engineering materials mainly refers to raw materials. Such as: sand, stone, steel, etc., there is no processing materials. 2, structural parts: the main structure here is the main structure of the building, the two structure and other accessories. Most of the semi-finished products and the structure of part of the installation accessories, such as: beam beam, continuous beam, beam, beam, cantilever beam, curved beam; steel, timber, concrete beam.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords