• Tower Crane TC5516 Fast Delivery Factory System 1
  • Tower Crane TC5516 Fast Delivery Factory System 2
  • Tower Crane TC5516 Fast Delivery Factory System 3
  • Tower Crane TC5516 Fast Delivery Factory System 4
  • Tower Crane TC5516 Fast Delivery Factory System 5
Tower Crane TC5516 Fast Delivery Factory

Tower Crane TC5516 Fast Delivery Factory

Ref Price:
$20,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
6T
Maximum Lifting Height(M):
141.5M
Rated Loading Capacity:
1.0T
Span:
50M
Rated Load Moment:
62T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5516(QTZ100) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 

Specification of Tower Crane

 

Technical Sheet for TC5516

 

Free standing height (m)

44

Max height with attachment (m)

150200

Working range can be adjustedm

455055

Min working rangem

2.5

Max lifting capacityt

8

Tip load @ 55mt

1.6

Hoist mechanism

Falls

2

4

Lifting capacityt

02

04

04

08

Speedm/min

080

040

040

020

Motor

YZRWFc250M-4/8     30/30KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4 /8/16   3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

00.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.5

Counterweightt

17.6

Mast section sizeL×W×Hm

1.6×1.6×3.0

Working temperature

-40+60

Total power (KW)

42

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 40 meters from site power source to lower

electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A

 

Loading diagram

 

55m jib length

R m

3.1—13.5

17

22

27

33

37

45

47

50

52

55

a=2

4t—24.65m

3.61

3

2.61

2.38

1.95

1.8

1.72

1.6

a=4

8t

6.2

4.62

3.41

3

2.61

2.38

1.95

1.8

1.72

1.6

50m jib length

R m

2.5—15.17

19.65

22

25

27.4

33

38.5

42

47

50

a=2

4t---27.6m

3.22

3

2.71

2.37

2.2

a=4

8t

6.2

5.53

4.76

4

3.22

3

2.71

2.37

2.2

 

45m jib length

R m

2.5—15.17

22

25

27.4

29.8

33

38.5

40

42

45

a=2

4t

3.65

3.22

3

2.87

2.71

2.5

a=4

8t---15.17m

5.53

4.76

4.2

3.65

3.22

3

2.87

2.71

2.5

  

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane TC5516 Fast Delivery Factory

Tower Crane TC5516 Fast Delivery Factory

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Q: He has to be in his 30's to 40's but I can't find anything that gives me a definite age.
Okay Well, You havent specified in what, but presuming you mean in the comics, and baring in mind he was the psychologist when Thomas Elliot and Bruce were only 7-8, then the bare minimum he could have been then was 21, though he was likely older. THEN presuming Bruce is around 35, though he also is probably older, then the bare minimum Crane could be is 48. that being said, he is likely between 48-60. He just looks good for his age ;). this of course is in the comics, however. The movie is different.
Q: Hi guys, I am doing a project for school on blue cranes, and i can't find much on what their diet is like? Does anyone know?
What Do Blue Cranes Eat
Q: Are there any NECs that let them do so? Maybe Minesweeping Bosn Mate?
In the latest update to the NEOCS Manual Vol II (NECs) I no longer see an NEC for BM for Crane Operator. Volume II Navy Enlisted Classifications (NECs) NAVPERS 18068F April 2011 NEC Chapter 4 RATING SERIES AND SPECIAL SERIES NECS www lic.navy.mil/bupers-npc/re...
Q: A. Power LinesB. WaterC. FiresD. Overturns
Dangerous to whom and exactly what does overturns mean? Operators are most likely to be killed when a tower crane breaks (is this an overturn?) because the operator is several hundred feet up in the air in the cab. Hitting power lines can be risky to the operator if dumb but staying in the cab is likely to be safe (stepping out may kill in touching ground) Overturning a ground based crane is going to hurt someone in the area much of the time.
Q: What should the sub contractor do before the installation of the bridge crane in the workshop?
Baidu search [tower crane tower demolition, lowering section safety technical disclosure]. If it is installed, remove the "two words" to "installation", and other contents are adjusted slightly.
Q: Around how much would it be to rent a crane to put a jacuzzi in my backyard.
You okorder /
Q: Building a new skyscraper? Tearing down the old Mellon Arena?
Get ready for the new tower.
Q: Does anyone know where I can locate a print or lithograph of the chromolithograph done in the 1850's of William John WIlgus' Ichabod Crane and the Headless Horseman?
Preach is son! I know in my case I ask if something looks good on me or if I look good because half the time I can't tell if something looks hideous on me or not. I always used to get picked on when I was younger as well because i grew up in an area where everybody was blonde haired and blue eyed, and I'm italian with extremely dark features so I stuck out! The popular girls tore me apart and I coudln't STAND to look at myself in the mirror. Yuck, dark, dark times. But then again, those girls were just trying to make themselves more secure, and they're the kinds of people fishing for compliments. heh.
Q: crane signals?
they are out there somewhere, and everywhere I have been they are the same
Q: how do they erect those large tower cranes you see on big building projects?
with another crane. assemble the tower first in sections, assemble the jib on the ground then lift it into place

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords