Tower Crane TC5516 Construction Equipment Building Machinery

Ref Price:
Loading Port:
China main port
Payment Terms:
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC5516 Description:

1.CMAX Tower Crane TC5516  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5516  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5516 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5516  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5516  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.

Tower Crane TC5516  Parameter:

 Max. working range 55m, tip lifting weight 1.6T and Max. lifting weight 8T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 44

Max height with attachment (m) 150

Working range can be adjusted (m) 44、50、55

Min working range (m) 2.5

Max lifting capacity (t) 8

Tip load @ 50m (t) 1.6 

Tower Crane TC5516   Packaging & Delivery:

40HQ container

20~25days after deposit

Tower Crane TC5516 Diagram:

Tower Crane TC5516 Construction Equipment Building Machinery

Tower Crane TC5516 Construction Equipment Building Machinery

Tower Crane TC5516 Technical Sheet:

Tower Crane TC5516 Construction Equipment Building Machinery

Tower Crane TC5516 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5516 for example, the first two letters “TC” means Tower Crane, “55”means jib length is 55 meter, and the last two letter “16” means the tip load is :1.6 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:National standards for tower cranes
GB/T 5031-2008 GB 5144-2006 tower crane safety code for tower crane safety GB mechanical and electrical equipment thirty-second 5226.2-2002 mechanical parts: requirements for hoisting machines GB 5802-1986 lifting short chain hoists and other lifting equipment for the T (8) test specification level calibration chain GB 5905-1986 hoisting machine test code and procedures GB/T 5905-2011 crane and GB/T program 5972-1986 lifting wire rope for examination and discard utility specification GB/T 5972-2006 crane wire rope inspection and scrap utility specification GB/T 5972-2009 crane wire rope maintenance, maintenance, installation, inspection and disposal GB/T 5973-1986 wire rope with wedge joint GB/T 5973-2006 wire rope with wedge joint
Q:i will like to crane operator?
You made a statement, you will like to crane (an) operator. Which operator is it you are going to like to crane? If you mean would you like to operate a crane, that is up to you. If you mean can you be a crane operator, that is up to an employer. You need to be employed as one, and that probably means training and experience before being allowed to operate cranes for him/ her.
Q:What are the special operators of tower cranes?
Specific include construction lifting signal division, cable construction, lifting machinery, tower crane driver (T), construction crane, tower crane installation, demolition worker (T), and height job basket, installation, demolition workers.
Q:What is the fundamental differences between Goju-ryu Karate and Fujian White Crane?
Are these some sort of new pokemon?
Q:Japanese Crane Info Needed!?
in the east Hokkaido, the north island of japan. some japanese crane in russia goes to north korea in winter, but cranes in hokkaido stay all through the year.
Q:When the tower crane foundation is found, what should be discontinued?
The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped
Q:What are the conditions of tower cranes, strictly prohibited?
According to the national standard "tower crane safety regulations" (GB5144-2006) requirements, "the installation and disassembly, section, or drop section operation, wind tower crane at the maximum installation height should be no more than 13m/s, when there are special requirements, according to user and manufacturer's protocol implementation." Wind speed 13m/s, that is, 6 winds.
Q:I have to do some research on a crane and technology itself (please help me)?
Q:Story where boy/girl makes 1000 paper cranes?
Sadako and the 1000 paper cranes by Eleanor Coerr; the anime theatrical.
Q:How to fix the cable on the tower of QTZ125 type tower crane?
The main purpose is to prevent the main cable fixed tower crane tower crane cable weight lead cable pulled bad (insulation damage, core pulling) etc.,

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range