• TOWER CRANE TC4708A System 1
  • TOWER CRANE TC4708A System 2
  • TOWER CRANE TC4708A System 3
  • TOWER CRANE TC4708A System 4
TOWER CRANE TC4708A

TOWER CRANE TC4708A

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Q:I'm curious
Shortly okorder /
Q:If anyone can find me a decent video of a Fujian White Crane Kung Fu simple hand block then I will be very grateful! I know sort of how to do it but I would like to get it spot on.Thanks
Not sure if there is a video but if you check out Analysis of Shaolin Chin Na by Dr. Yang Jwing-Ming you might find something.
Q:In the U.S. please and tell me where and how you got the number.Thanks!!!
There are so many overhead cranes in operation today in the US and around the world. They could be numbering in tens of thousands in industries and other operations. An overhead crane, commonly called a bridge crane, is a type of crane found in industrial environments. An overhead crane consists of parallel runways with a traveling bridge spanning the gap. A hoist, the lifting component of a crane, travels along the bridge. If the bridge is rigidly supported on two or more legs running on a fixed rail at ground level, the crane is called a gantry crane (USA, ASME B30 series) or a goliath crane (UK, BS 466). Unlike mobile or construction cranes, overhead cranes are typically used for either manufacturing or maintenance applications, where efficiency or downtime are critical factors. Have a pleasant day.
Q:What is an attached tower crane?
Attached tower craneAttached tower crane is arranged close to the building, the tower by themselves to rise up with the increase of buildings and roof, tower, every 20m with attachment support device, the tower body is fixed on the building, in order to maintain stability. Figure 11 is a QT4 - 10 self - elevating four - tower crane (attachable, stationary, walkable, and climbing).
Q:who invented cranes?
It is true that it is lost in the mists of time but I think I read it somewhere that it that Clarence A. Crane invented the crane.
Q:across the street from my work, there are three big cranes. It seems like they just popped up over night. anyone know how they get them built?
If okorder /.. Crawler cranes/ have tracks like a bulldozer/ normally have a larger lifting capacity and are brought to the work site on multiple semi-trucks. Then put together with smaller cranes. Hope this answers most of your questions. Wingman
Q:In stephen Crane's The Open Boat does the correspondent change from the beginning of the story to the end?
It relies upon entirely on the area. If the character revealing the dying(chosen climax) is a fortune teller or vacationer from the destiny who occurs to understand the effect of the story, i might discover it setting up. As you suggested, it may on occasion make the dying or climax extra emotional because of the fact, alongside the way, you're praying something will substitute the oncoming adventure entirely. while that fails to ensue, you are able to share the different characters' emotional misery, that helplessness and expertise that no longer something would desire to be executed on your area. Now, if the dying or climax is given away with the aid of the author in a narration or with the aid of a talkative character which could no longer have in all hazard time-honored what grow to be to ensue, i may be somewhat unnerved. It dismantles the story's exhilaration and stress for the reason which you will finally end up critiquing each little thing that follows. Why is that this happening if the character is meant to die? and this is pointless if he/she will have the means to finally end up lifeless besides. Me in my view... i like walking with the aid of a room packed with twists and turns with a blindfold on(no longer actually as that would desire to be very uncomfortable). the place is the buzz in understanding the effect of something if it does not slot interior the context? Authors of those particular novels want stress to construct and yet they get so absorbed of their very own paintings that they experience the objective audience ought to understand each little thing unexpectedly. i think of that's a variety of education dumping. although, as i discussed in the previous, if the way of informing an objective audience of the story's effect suits, than it could make the e book very relaxing. :) ~~ ??MeryKheper??
Q:from the legend of sleepy hollow, his background, characater, personality, life etc.
Howdy okorder ........whatever you like to use. Search engines are the whole key to locating information on most anything you want information on. Legend of Sleepy Hollow is of course what he is most famous for. Good luck
Q:I am making a crane(jib) whatever you call it and I have a concept for the crane itself but not for how I will actually move the camera. I heard wires work but I can not seem to grasp teh concept.* It is a heaver camera by the way*
On a real camera crane you would press the up and down button that moves the wrist part of it. ( I drove a forklift). If you are doing to yourself you'll have to rely on the elbow movements. I might think about renting a Genie lift. And letting someone be your hands in the thing. Unless you know how to build a fully articulating hydraulic ball-joint?
Q:Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords