• TOWER CRANE TC4708A System 1
  • TOWER CRANE TC4708A System 2
  • TOWER CRANE TC4708A System 3
  • TOWER CRANE TC4708A System 4
TOWER CRANE TC4708A

TOWER CRANE TC4708A

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Q: what is the common cause of crane accidents
i might think of that for the time of many situations the fault is with wrong maintenance, and inspection. the government has quietly comfortable well being and protection rules on the behest of their company acquaintances, and as common the worker will pay the value.
Q: My kid wants to pet a crane fly because it's cool but I don't want to keep it around as a pet. I'm not a fan of crane fly. How should I tell him no? Also, I'd like to explain to him besides the fact that it disgusts me: I don't like insects.
well seriosly just let him have 1 if he wants it i mean gawsh hes just a kid n he likes pets dont u?
Q: I currently have 1999 origami paper cranes. And I haven't made my 2000th yet because I don't know what to wish for :3So I wanna know...Do you have to make your wish right on the 1000th one? Or can you make the 1000th one and save it until you think of something good to wish for.I'm serious. :3
wait, you folded 1999 paper cranes and you still didn't have enough time to come up with a wish? I recommend that you wish to become more decisive...
Q: When the earthquake happened, the children wanted to know what they could do to inform other students and raise awareness for the people in Japan. So, we decided to do a show on the earthquake, and to also making the cranes, the origami cranes.thank you! a foreigner. (detail)
To also make the cranes is the correct way to say it. To also making the cranes is incorrect.
Q: On Batman Begins what is Dr. Crane's full name?
johnathan crane..no middle was mentioned..if i'm not mistaken...
Q: I read Maggie: A Girl of the Streets in eleventh grade and I wonder if the author, Stephen Crane, was the same Stephen Crane that married Lana Turner.
hah ha i'm in your class too :) This project sucks... and I still haven't done it! I have to tonight..
Q: Form the movie Dreamer, daughter of Ben Crane
Connor. Caleb. Caden. Caelin. Cedric. Craig. Carson. Christian. Christopher. Callan. Chris. Casey. Chandler. Colton. Collin. Cain. Calvin. Campbell. Chesney. Chad. Chase. Chance. Channing. Chaz. Cieran. Columbus. Cody. Colbie. Cole. Clyde.
Q: Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
It is the work level of the organization, representing the working hours and load sizes of the institution. See GBT/13752 or GBT/3811 for specific explanations.
Q: Tower crane body standard section connection bolt screw upward or downward, why?.
Up or down, there is no change in the firm torque of the connecting bolt. Simply choose to go up or down for convenience. Generally no special requirements, it is recommended that the thread upward, so that it is not easy to rust.
Q: Pictures, data, manufacturers.
how in the world could you take a tower crane, a huge crane, and mount it on a wall?

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords