TOWER CRANE TC4708
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
The construction hoist product produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad
1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
- The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
- Q: I caught this crane fly in my garage but is almost the size of a dragonfly. It has a 3 inch wingspan. I saved it in a jar because I though no one would believe me. so do they really get this big or is this thing a freak?
- OMG - I saw one of those to! No one believed me, too. I should of saved mine...anyway, I don't know. Sorry.
- Q: feminists always point to sexism. but Ive found 3 women here - who say they have experienced no sexism, and were pleasantly surprised by how excepting their largely male co-workers have been -
- Because manual work is the domain of the working classes, and the further down the social heirarchy you go, the less effect feminism has had. People from working class backgrounds are more likely to have broadly traditional attitudes towards work. This will change. I know young working class girls who are training to be plumbers and electricians. Hopefully their daughters or granddaughters will be operating cranes and working on building sites.
- Q: In the poem "The Wayfarer”, what is Crane's ironic comment on the pursuit of truth?
- On a semi-close inspection, it would seem to me that Crane is saying that, ironically, the truth hurts. He's making a statement similar to Shakespeare in Hamlet. Hamlet is NOT muddled by indecision, as so many poor readers have often thought, but he sees much too much of the truth of the way of the world, and sees how futile and terrifying it is, and is embarrassed, or even humorously angered, that he should be asked to fix the world in the face of such impossible distress and futility. Similarly, the path to truth in Crane's The Wayfarer is overgrown with painful daggers which, if you step onto the path, will cut up your feet; if you take the path and find truth, you'll be hurt and dumbstruck and terrified by this path, so that the Truth (with a capital 'T') itself convinces the poem's 'hero' to turn to a different path, to choose something other than truth. And he doesn't even need to walk the path at all, only get a bit of a glimpse into truth, in order to be terrified by it.
- Q: S930 M50 (M125/75) level jib tower crane about how much money
- With the ten standard section, not to Sishijiwan
- Q: Romney woulda had that thing fixed by now.
- sure.. because after more tax cuts on the rich and starting another war... it would be possible if u think the crane is more important than the 1000s of people stuck then i hope u r some stupid 11 yr old kid becauz u should not vote
- Q: any1??
- forces for cranes are dynamic , so u'll have repeated cycles of compression tension ( i assume it's a trussed crane). but generaly for a cantilever , the main forces are -ve Bending Moment +ve shear which changes the rft. bars position if dealing with R.Concrete for example
- Q: More than meters of tower cranes must be equipped with red barrier lights at the top
- To see the land of tower crane or floating crane... Basically, however, tower cranes over 30 meters above the tower shall be equipped with red light on the top of the tower and jib.
- Q: why are siberian cranes endangered?
- Wetland loss means Siberian Crane loses ground Siberian Crane Grus leucogeranus is now listed as Critically Endangered, having previously been listed as Endangered in 1994. Its population is estimated to be 2,500-3,000 and comprises three separate populations. The western population breeds in western Siberia and winters in Iran, and the central population breeds in western Siberia and winters in India. Both the western and central populations are on the verge of extinction as a result of habitat loss and hunting. The much larger eastern population breeds in eastern Siberia and winters in the lower Yangtze basin in south-east China. The main threats to this population are wetland destruction and degradation at staging areas and wintering sites caused by agricultural development and the development of oil fields. The main wintering site in China, Poyang Lake in Jiangxi Province, holds 95% of the global population but is potentially threatened by future hydrological changes resulting from the construction of the Three Gorges Dam and other dams. If the operation of these dams prevents the development of suitable winter feeding conditions for waterbirds at Poyang Lake and other wetlands, Siberian Crane and other threatened species could undergo extremely rapid population declines in the near future.
- Q: In Catching Fire Katniss hangs a dummy with the words Seneca Crane on it. Who is that? It sounds familiar...
- I'm sorry I saw this now, but I can answer it if u still don't know. Seneca crane was a head game maker who allowed there to be 2 victors cause he , according to pres. Snow felt sentimental, well he was killed because of that , and katniss did that As an act of defiance ...
Send your message to us
TOWER CRANE TC4708
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords