Tower Crane of Chang Li Model Number QTZ40A
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 60 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ40A Description
Feature: Tower Crane
Condition: New
Application: All kinds of costruction
Rated Loading Capacity: 4T
Rated Lifting Moment:500/630/800/1000/1200KN.m
Max. Lifting Load: 4T
Max. Lifting Height: 150m
Span: 42M
Place of Origin: Henan, China (Mainland)
Brand Name: Yu Jie
Model Number: QTZ40A
Certification: ISO,CE,BV,SGS
Warranty: 12 months
After-sales Service Provided: Engineers available to service machinery overseas
Tip Load: 0.8
Trolley travel speed: 38/25m/min
Slewing speed: 0.6r/min
Jacking up: 0.4m/min
Powed: 380V/50HZ
Lifting character: 2/4 Fall
QTZ40A Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
9. Engineers available to service machinery overseas.
QTZ40A Specification
QTZ40A Pictures
QTZ40A FAQ
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
- Q:?? Please star my ? i will give you points!
- Although I haven't seen it done I imagine that especially for very high cranes it's done most often with cables and winches (utilizing a pivot point at the bottom of the structure). For many lower cranes such as those found on vehicles hydraulic lifting is sufficient.
- Q:I know they will leave because last year they left after a few weeks. I have seen that they normally leave after a month. They annoy me and I want them gone. They have been around since the end of February or beginning of March. Does anyone else have these in their house. It seems like they are leaving slowly usually there is like 1 or 2 a day in moms room but the last 2 days there have not been any. They have been in my room, just one a day it seems like and maybe one in the kitchen. We swat them or spray them and they die eventually but when will they be gone atleast for a little while?
- Crane flies are totaly harmless to humans.They fly for some time and fall down to earth.Ants will take them away.These flies never byte or sting. Pet Cats like to play with it and catch it.They will disappear after some time. Do you know that crane flies spend most of their lives underground in their larval forms, which are known as leatherjackest?. Leatherjackets were very common round here, and are a favourite food of the local crows .These leatherjackets transform into crane flies.Summer is their growth time.
- Q:The really really tall ones you see next to skyscrapers. How do they assemble them? I thought that maybe they use another crane, but then how did they assemble that crane? Some of them are really, really tall. Try to remember what one looks like. They have long hollow necks with a top section where the driver sits that stretches long horizontally.
- You okorder /
- Q:how do they take crane off top of building?
- Commonly cranes attached to the top of buildings were built up there.
- Q:how a tower crane for a high rise building construction is erected?
- Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).
- Q:how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
- If an object is uniform, it's a fair bet the centre of mass will be at the centre of the shape. If lifting with slings, he will have them placed equidistant from centre, at an angle to each other not exceeding 60 degrees. He will then lift a little, and can tell by the angles from vertical of each sling whether or not the CM is under the centre of the crane cable. If not, he will lower the load, and have someone adjust the sling positions. Having slings equally loaded ensures a level load when lifting, and when a load is level it is a much safer lift than when it tilts one way or the other. A tilt would mean greater force in the sling on the low end. The load could slip out, or the excess force could break the sling.
- Q:How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
- A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
- Q:Brief introduction of ten no hanging criterion for tower crane operation
- 8, oxygen acetylene generator with explosive materials are not allowed to hang; 9, mechanical safety device failure or sick when not hanging; 10, bad weather, more than six winds not hanging.
- Q:Why are crane flies called mosquito eaters?
- Adults crane flies seen in spring and summer. Found in damp woodland and beside woodland streams ; leathery larva lives in watery margins, so might eat mosquito's
- Q:If so, would you mind finding me a site that will teach me how to either with a good video or an easy-to-follow explanation because i tried many sites and i just cannot understand clearly enough. I get so far and then i can't tell what is happening in a step, and i can't do it.If you wouldn't mind to find me a site that you know will help, since you can make them, it would be greatly appreciated.Thanks.
- Go to Howcast and type in origami.It taught me how to fold like a pro.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane of Chang Li Model Number QTZ40A
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 60 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords