• Tower Crane of Chang Li Model Number QTZ40(TC4210) System 1
  • Tower Crane of Chang Li Model Number QTZ40(TC4210) System 2
  • Tower Crane of Chang Li Model Number QTZ40(TC4210) System 3
Tower Crane of Chang Li Model Number QTZ40(TC4210)

Tower Crane of Chang Li Model Number QTZ40(TC4210)

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
200 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ40(TC4210)  Description

Feature: Tower Crane

Condition: New

Application: Buliding Construction

Rated Loading Capacity: 1T

Rated Lifting Moment: 168 t*m

Max. Lifting Load: 4t

Max. Lifting Height: 100m

Span: 42m

Place of Origin: Henan, China (Mainland)

Brand Name: YUJIE

Model Number: QTZ40(TC4210)

Certification: CE,ISO,IAF

Warranty: 15 months

After-sales Service Provided: Engineers available to service machinery overseas

color: as you like

QTZ40(TC4210)  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

6. New designed mast, can be used to Internal and external climbing tower crane

7. Engineers available to service machinery overseas.   

QTZ40(TC4210) Specification

 Tower Crane of Chang Li Model Number QTZ40(TC4210)

QTZ40(TC4210)  Pictures

Tower Crane of Chang Li Model Number QTZ40(TC4210)



QTZ40(TC4210)  FAQ

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.



 

 


Q:What is the theme of the poem A man to the universe by Stephen Crane?
In the poem “A Man said to the Universe” by Stephen Crane three distinct images appear as the reader relates man and universe as they fit into their cosmic role. The simplicity of the five line poem envelopes man’s perception of his place among the universe, the universe’s perception of its role in the order of life, and the relationship of both man and universe in regards to the enormity of the cosmos. Collectively, these three components create a profound thought on creation. By Folrani Adewale
Q:How come you never see cranes being transported from one site to another?
Many are too large to be transported whole, and are assembled on-site (or even build for a single on-site use).
Q:(a)What is the power output of the crane. (ignoring losses)?(b)If it takes the cran2 2 minutes to raise the payload to its final height, how far above the ground is this?(c)If the cable were to break as the payload reaches its final height, how fast would it be traveling as it hit the ground?
a) As the crane is lifting at constant speed, there is no acceleration on the payload, therefore the net forces on the payload are equal to 0. Therefore the crane overcomes just the force of gravity = 500*9.81 = 4905 N Power = force * velocity = 4905 * 0.7 = 3433.5 W b) distance = speed * time = 0.7 * (2 * 60) = 84 m c) assuming that the cable breaks while it is still going up at 0.7 m/s, therefore initial velocity upwards = 0.7 m/s. using v? = u? + 2as: v? = 0.7? + 2(-9.8)(-84) = 1646.89 v = √(1646.89) = 40.9 m/s the payload will be travelling at 40.9 m/s when it hit the ground.
Q:I want to know what the cheapest way is to rent a crane. I want to crane a spa out of one backyard to another. Where can I go to find a great deal on a crane rental?
call a crane rental company - rates are pretty standard in the industry for each type of equipment
Q:we have a project starting that will require a stack built 1km high in the air?How will they install this?
Build form the top, when they build these huge cranes, they build the top section, lift that up and build the next section underneath it, set it down to release the lift off the top section and lower it to the second section. Lift those 2 sections from the bottom, build the third section underneath it, and so on. You need to lift securely, like on all 4 sides for stability, and that leaves the corners free to build the next section.
Q:Is stature of the crane a Japanese, Chinese, or Okinawan form?
Found in kata from all 3 sources okinawan japanese and chinese .GANAKAKU KATA in shotokan CHINTO in okinawan kata and in FUKIEN CRANE STYLE for chinese. GANAKAKU means crane on a rock.
Q:A heavy concrete panel is being lifted into position in a building by means of a crane (see figure below). The tension of 1.78 x 10^4 N in the supporting cable produces a torque with respect to point O. (Let L = 46.3 m.)
The crane contributes a torque of 495,979.8 Newton-meters. 1.78e+4 * 46.3 * cos(53.0) = 495,979.8 ...but this is not the total (net) torque. There is also a torque due to the weight of the concrete slab - torque we are ignoring since we do not know the weight of the slab.
Q:i'm doing it for fun but i was wondering because my aunt had a baby that like 1 and the baby has cancer and i'm gonna try this to help her please don't be mean like the only thing you will get is sore hands and stuff is it true or is it a myth only answer if you did thid and i want to know what happened to you but anyway ill pray to god that everything will be ok with the baby
I wish that were so but God only acts according to HIS will. Not your will but thy will be done, it doesn't hurt to ask and hope that he will grant you with what you desire but don't be disappointed when it doesn't happen. And remember, just because it does not happen doesn't mean that he didn't listen. We do not know what God has in store for us until it happens, but that's what we call faith. Trust in HIM and you shall receive, even though it might not be what you want God is righteous and you may expect a better outcome than what you have expected.
Q:What special operators should be equipped for the installation and disassembly of tower cranes?
2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:Tower crane 5610 why is it called QTZ63?
Q is reusable, T is tower, Z is jack up, and combined is jack up tower crane. (this is the earliest known China, now the various manufacturers have their own name, some close to the French take, such as F0/23B, the tower jib 50 meters, a maximum weight of 10 tons, 2.3 tons of weight lifting arm tip)80 is the moment, the unit is t * m, (should say is the force multiplied by distance, 800kn.m) for 5613 cranes, the maximum lifting capacity of 8 tons, the boom length is 56 meters, arm tip lifting weight 1.3 tons, maximum weight in the range of 2.5 meters ---13 meters, calculation of 8 * 13=104, so the name is QTZ104, now the provisions should be a QTZ104, but before, people think is 8 tons of weight, so called QTZ80, is now available.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords