Tower Crane H6015 for The Construction Use

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of our Tower Crane

1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of Tower Crane

Model

QTP80 (TC5511) (Flat-Top)

Max Working Radius (m)

55

Free Height (m)

41

Max Load (T)

6

Tip Load (T)

1.1

Max Height (m)

161

Wall Ties for Max Height (sets)

8

Main Material Specs (mm)

Square Steel Tube   1352*12

Mast Section Dimension (m)

1.835*1.835*2.5

Hoisting Speed (m/min)

80/40/10

Min Steady Falling Speed (m/min)

5

Slewing Speed (r/min)

0-0.62

Radius-changing Speed (m/min)

40/20

Jacking-up Speed (m/min)

0.6

Total Motor Power (kw)

60

Independent Structure Weight (kg)

37800

Counter Weight (T)

16.2

 Tower Crane H6015 for The Construction UseTower Crane H6015 for The Construction Use

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do you build a crane!?
Carefully. okorder.com has kit numbers and downloadable instructions for many Lego cranes. You might be able to find some of them on OKorder. You may not need to actually build the Lego crane. Instead, look at the model, determine the major pieces (wheels, turntable, arm, etc.). Then, look at your bundle of pieces and make something with the same function.
Q:What should be included in the disassembly plan of the tower crane?
- 3 - tower crane demolition special program should include the following1. General situation of engineering;2, the tower crane position of the plane and elevation;3. Disassembly order;4, unit weight and hanging point position;5, remove the auxiliary equipment types, performance and arrangement position;6, the power set;7, the construction personnel configuration;8. Rigging and special tools;9, major sources of risk and safety technical measures;10, emergency plans, etc..Note: (1) the special construction plan for the installation and disassembly of tower cranes shall be examined and approved by the units, technology, safety, equipment and other departments, and shall be implemented after approval by the supervisor.(2) the contents and requirements of the special construction scheme for tower crane installation;Compiled from the "building construction tower crane installation, use and disassembly safety technical regulations" JGJ196-2010, please refer to the implementation. Attached: 1, Zhifu Wanda Plaza Tower Crane installation program 2, Muping District Cultural Center project PT7528 tower crane demolition program
Q:What special operators should be equipped for the installation and disassembly of tower cranes?
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:my father is owning a crane manufacturing business I hav given my ssc wat should I study after ssc IT, mechani
Without being too critical, the first thing you need to do is improve your English so that you will be a huge help in the company whether in engineering or sales. Cranes require lots of engineering in weight handling (mechanical), automation and controls including instrumentation (electrical) and a tertiary field in engineering is in stopping and starting (clutches and brakes) which can be mechanical or hydraulic engineering. A new filed is metalurgy which is concerned with the way metals perform (stress), lighter,stronger, etc. Take your choice. Mpho
Q:Mosquito Eater (Crane Fly) Problems?
Crane flies will probably be interested in the sunshine of the condo, so decreasing the light subsequent to the structure and what escapes from the home windows can help. They come from floor so it is rough to really do whatever to manipulate them.
Q:do you know how to make an origami paper crane?
this okorder.com
Q:Is it true that crane flies are THE most venomous insects in the world?
RE: Is it true that crane flies are THE most venomous insects in the world? I've heard that daddy longlegs aka crane flies contain the most deadly venom of all insects. The only reason they aren't dangerous or deadly is because they have no mouth or 'straw' to inject the venom. But I'm not sure what's correct. Although they cannot harm us humans,...
Q:How were Railroad Steam Engines from 1830 to 1890's recovered before the advent of the Wrecker Steam Crane.?
Old Man Dirt is right. Block and tackle. Remember too those early engines weren't that heavy. The most common type from 1850 to the 1890s was the 4-4-0. They, and the other types were usually between 25 and 60 tons. I don't necessarily collect old rail photos, but I've seen many hundreds in other people's collections. And early locomotive salvage was usually block and tackle, with another engine brought in to furnish the muscle required. Since this could be a lengthy process if the wreck was extensive, a temporary track, or sometimes called a shoo-fly would be built to move trains past the derailment, or to enable getting another engine and hoisting equipment positioned.
Q:Do US Navy Boatswains Mates Operate Cranes?
In the latest update to the NEOCS Manual Vol II (NECs) I no longer see an NEC for BM for Crane Operator. Volume II Navy Enlisted Classifications (NECs) NAVPERS 18068F April 2011 NEC Chapter 4 RATING SERIES AND SPECIAL SERIES NECS www.public.navy.mil/bupers-npc/re...
Q:A crane mounted on truck droped the cargo on the truck itself, Is claim for damage to the truck valid?
The crane and the truck are one and the same vehicle, so I can't see why a claim on fully comp. wouldn't be valid. If this is not the case, then the crane IS the cargo, so surely the claim would go to the insurer of the crane, and not the lorry.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range