TC7135 Crane Machine with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of TC7135 Crane Machine with CE ISO Certificate

1, TC7135 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 3.5 to 71m, TC7135 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Main Features of TC7135 Crane Machine with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

Tower crane Specifiction TC7135 Crane Machine with CE ISO Certificate

TC7135 Crane Machine with CE ISO Certificate

FAQ of TC7135 Crane Machine with CE ISO Certificate

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Which kind is better, gantry crane or tower crane?
Each has advantages, the use of different conditions, the use of different cranes, tower cranes can not move, but the lifting height can be very high, the door machine has tracks can be vertical and horizontal movements, lifting height, tower crane is not high.
Q:Help with origami flapping crane?
The okorder.com/
Q:Does anyone know where I can order Sugar Crane to grow?
Crane? anyway,, if your store has those little pieces you can buy to eat? or if you know someone with canes,, you strip off the hard outer covering,, this has the seed buds,, plant these in 3 inches of soil and wait,, cane is slow growing!! if you google sugar cane growing or go to wikipedia you will find plenty of info google buy sugar cane seeds you will find sites to order!!
Q:Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
Q:How were Churches and really tall buildings constructed hundreds of years ago before the invention of cranes?
Cranes existed in Roman times. Before that, you just hauled stuff up with ropes as best you could.
Q:What subject does Ichabod Crane like to read about? What increased his interest in this subject?
About Ichabod Crane, the school master, Washington Irving writes in A Legend of Sleepy Hollow: He was, in fact an odd mixture of small shrewdness and simple credultiy. His appetite for the marvellous, and his powers of digesting it, were equally extraordinary; and both had been increased by his residence in this spellbound region. Ichabod Crane digests Cotton Mather's (a Puritan preacher) History of New England Witchcraft, a book in which he firmly and most potently believes. He spends many hours reading Mather's work, and fluttered by his excited imagination he believes that he is struck with a witch's token at times. To drive away the evil spirits, he sings psalm tunes. Nevertheless, Crane still delights in the supernatural, so he spends winter evening with the old Dutch wives who exchange tales of ghosts and goblins around the fire. In turn, Ichabod entertains them with Mathers's reports on witchcraft, as well as predicting what the sounds in the winter air portend.
Q:In dragon ball, Why is master crane evil in the filler?
The idea is that Crane Hermit is a selfish man that would do anything to get what he wants. In the past, Master Mutaito was there to ram some discipline in his head and have him under control. Following the events of his death and the defeat of King Piccolo, nothing could really stop him from being a selfish jerk again. Roshi probably didn't mention Crane being bad before King Piccolo's arrival because he wasn't really evil before it either. He was selfish and greedy, but not outright despicable as later... at least not that much. Roshi seeing Crane as a friend might imply that Crane had some redeeming qualities during his years as Roshi's rival under Mutaito's guidance. About their baldness, I think they shaved their heads after a while due to how monks and some martial artists tend to shave their heads. That or it's a plot hole due/filler error. It's again either a plot hole/filler error or they just switched outfits once they reached a certain level of their training, just like how you gain a different color of band as you progress in Judo and Karate.
Q:I need the Safe working load for a Crane Lift Formula......Please Help?
Normally you would get a chart for that crane and you look up the SWL at the extension and angle you would want to use, but you can calculate this too. Basic formula; mass*distance = newmass*newdistance, in the case you have described you have to take into account that the distance is not the load arm as it is not at a right angle to the force the mass has and therefore you would have to work that out via trigonometry. Any clearer?
Q:Some questions about the 1000 paper crane myth?
The myth seems to surround the FOLDING on the 1,000 cranes - it is the sacrifice on the part of the person doing the folding that is the magic not the cranes themselves. See the Wiki......
Q:What is the load moment of a crane?
The load moment for a crane is a number measuring the weight of the load lifted times the distance between the mass and the centre of the crane's superstructure. For example, a 20 ton weight lifted at 5m away from the crane (in reality, right next to it!) gives us a load moment of 100 ton*m, the same as a 10 ton weight lifted 10m from the crane. Cranes can handle higher load moments closer to the crane, so really heavy lifts are always done from very close to the load.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range