• TC6018 Construction Tower Crane System 1
  • TC6018 Construction Tower Crane System 2
  • TC6018 Construction Tower Crane System 3
  • TC6018 Construction Tower Crane System 4
TC6018 Construction Tower Crane

TC6018 Construction Tower Crane

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. 10T tower crane

2. Factory cost

3.block mast section, strengthen

4.Advanced painting process

5.ISO,CE, GOST

Our various model goodsas follows:

1.Topkittower crane (4-12 tons)-

QTZ40,QTZ50,QTZ63,QTZ80,QTZ100,QTZ125,QTZ250,QTZ315

2.Flat top/Hammer headtower crane (4-10 tons)-

QTP4810,QTP5010, QTP5210,QTP5510, QTP5515,QTP6016

3.Luffing tower crane(8-12 tons)-

QTD100,QTD125,QTD160,QTD300

4. Building Hoists(SC200/200, SC100/100, SC100, SC200) single cage or double cages. load capacityis 1 ton/cage or 2 tons/cage

5. Aerial suspendedplatform(ZLP630)

Company Information

Professional tower crane manufacturer in Supplying/Offering Brand New Self-erecting Tower Crane with new HYCMBrand. Export To More Than 20 Countries With CE/ISO Certificates.

Two manufacture factories and 5 produce lines for topkit tower crane, topless tower crane, luffing towercrane, construction hoists and aerial suspended platform.

   Our company qualitypolicy is leading in the development of science and technology, managementof standardizing, quality first, customer satisfication and struggle towardsquality goal that is no accident and zero defect.

   Our brand "HYCM"Tower Crane has got a high reputation at home and abroad due to our quality andcredit. We have after-sale offices in almost all the provinces in China.  

   Gathering allcorners of the land and making friends all over the world, the company willcooperate with the masses of knowledgeable people of all circleswholeheartedly, to connive the great cause and to create the resplendence.

Inquires QA:

My dear friends, If you need any towercranes, please tell us the below basic parameters:

1. Building height or tower crane workingheight.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements

Welcome to contact us! Believe will be your best choice!



Q:If garden gnomes and oragami cranes were to battle with one would win?
Staring Contest!!! (THAT NEVER ENDS!!!) Dun Dun DUNNNNN!!!!!
Q:Jon and Paul are folding origami cranes. If Paul works alone he can fold 100 cranes in 5hours. together they can do the same job in 3 hours. how much time would it take for Jon to fold 100 cranes alone? Please show your work. :)
Paul does 100 cranes in 5 hours So in 1 hour he does 20 cranes In 3 hours he does 60 cranes and balance 40 cranes Jon does Jon = 40 cranes in 3 hours So 100 cranes = 100/40 X 3= 7.5 hours ANSWER
Q:How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
This Site Might Help You. RE: How do they put up tower cranes? How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
Q:please tell me thats not what i think it is O_O
It probably is what you think. I've heard that they use whale parts to make some brands of lipstick so I wouldn't be surprised if they used parts of other animals in cosmetics. =X
Q:I have to create a crane to support a dead load for my Engineering Technology class. It can be made out of only 1/8 inch balsa wood and wood glue, and is going to be graded by the ration of weight held to structure weight.Could anybody give me some suggestions as to how to go about designing this thing? I already know most of the basics, but if anybody could give me some specific tips, they would be greatly appreciated.Thanks!
Is this for a nuclear power station? If 2500 Te and 60m really are the specified loads and span then it is likely that it will be used very seldom. In theory you can design for any load to be lifted but maintenance on a crane system that is used once a year (10 years?) is a real problem. The main items to consider are: Availability of winches and bogies which then dictates running beam and rail sizes. For the spanning beam several alternative sizes needed to be designed and then costed. It will be not just weight but transport costs that determine the most efficient sizes The overall height of the crane will then determine the required roof height assuming that the crane is under cover. For comparison the Harland and Wolf cranes in Belfast called Samson and Goliath can lift 840 Tonnes each. Overall design needs to consider speed of travel, acceleration and deceleration rates and a host of other things.
Q:In the Bride comes to Yellow Sky, Stephen Crane uses symbolism to evoke in readers a sense of the “old west”. However, the knowledge of the “old west” that the average person holds in his or her mind is false and nothing more than a Hollywood created myth. By using the symbols inherent in Hollywood’s old western myth Crane manipulates the reader’s misconceptions only to leave them feeling stupid when he reveals a hole in that way of thinking with the irrational ending.This is actually a thesis i'm working on for an analytical essay on the piece.I need to know if anyone has ever read the story and gotten the same feeling Crane was having fun at the reader's expense or perhaps poking fun at the old western I have very good points from the text to support my thesis but i cannot find anything online that touches on the possability of this being a parody. Anyone else think Crane's having fun or is a bit condescending in this piece?
I have to say no. Your question erred in a significant way. Hollywood didn't create this false image of the West. The false image was created a long time before by people living in the age of the incidents. It didn't take publishers long to notice that people living back East enjoyed these gritty depictions of the West. Dime novels were a big seller in the 18th and 19th centuries. Look at Stephen Crane. He died in 1900. Hollywood was non-existent as the facet of American life that it holds now. Crane would have been writing this story with the idea that he was depicting a real slice of the wild West that was becoming more civilized.
Q:sun/rising/etcBQ: how often are your winnings
I love this question. My uncle is pretty good at it. I haven't tried because primarily most of these machines I've come across have mostly crap or the crap is pancaked on top of all what I consider the goodies--like a baby pink Domo! Y'know, maybe I should try it sooner. OOooh, a moose!
Q:for example: erection, technical data...
A bridge crane is one that looks like a bridge (sorry I am tired). It sits on two railway tracks. One at either side of say a building. The tracks are at a fair height. The crane bridge spans between the tracks. Long travel is when the crane moves along the tracks. Cross travel is when the 'crab' moves sideways along the bridge. The crab has the hoist on it with a drum and cable type arrangenment. The lifting gear or hook is attached to the cable. They are very useful in factories for transporting large parts from one process to another. They transport pretty well anywhere in a well designed building in that Long Travel can be X cross travel can be Y and hoist up and down can be Z.
Q:I saw da construction of the upcoming tallest building in da world in Dubai,how did da crane get on top of it?
Why do you write da instead of the? It's irritating. I apologize to you. That was rude and unkind of me.
Q:How do they get the cranes and counterweights down off the top of buildings when finished?
Dereks, which are built along side of the buildings, actually take themselves apart. There is a jacking system which attaches to the segment that is 2nd from the top. This lifts the bussiness end of the crane off the top segment which can then be unfastened and lowered to the ground. The jacking system then replaces the crane on the new top, travels down one more segement and the process is repeated. It is actually cool to watch.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords