• TC 6024A tower crane System 1
  • TC 6024A tower crane System 2
  • TC 6024A tower crane System 3
  • TC 6024A tower crane System 4
TC 6024A tower crane

TC 6024A tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TC6024A tower crane is hoisting and conveying machinery which is designed  by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.

The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 438kN•m. The tower crane has the lifting height of 29m and the adhesion lifting height of 120m (2 magnification) during independent use.

All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 24.9kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

400

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~50

Maximum amplitude lifting capacity

t

0.8

Lifting height

Independent

m

29

Attached

m

120

Time of moving outrigger end to rotation center

m

50.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

8.54

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

(1)4-magnification Lifting Performance Table


Amplitude(m)

3-10.966

11

12

13

14

15

16

17

18

19

20

Lifting capacity(t)

4

3.98

3.64

3.36

3.10

2.89

2.70

2.54

2.39

2.26

2.14

Amplitude(m)

21

22

23

24

25

26

27

28

29

30

31

Lifting capacity(t)

2.04

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

1.35

Amplitude(m)

32

33

34

35

36

37

38

39

40

41

42

Lifting capacity(t)

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

0.99

0.97

Amplitude(m)

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-21.4

22

23

24

25

26

27

28

29

30

Lifting capacity(t)

2

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

Amplitude(m)

31

32

33

34

35

36

37

38

39

40

Lifting capacity(t)

1.35

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

Amplitude(m)

41

42

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.99

0.97

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

 

Q:I'm a little confused as to what the difference is between the crane and the flare boom-____- I'm thinking that the flare boom is what they use to burn off oil I there's a fire, but is that right? And what does the crane do?
It's called a flare boom because the flare is out on the end of a boom like structure. To keep the flame as far as possible from the rig production operations.
Q:I alsways see projects where there are these massive cranes sitting on top of huge buildings...how they hell do they get them up there?
With more massive cranes. Sometimes, they will put them up in pieces - and assemble them on top of the building.
Q:how do construction crews put up a crane?
They assemble it on a concrete foundation using a mobile crane. To grow taller, the top unit of the tower crane has a jacking mechanism that lets it raise itself up and insert another tower section.
Q:I am having trouble thinking of girls names that go well with my last name, Crane.my favorite name is lily but i think it sounds bad with my last nameand i like the name emma and i think that it goes well with crane but i think it might be too commonso if any of you can think of names that are not super common (not unheard of either) that go well with crane that would be awesome. Thanks!
Bridget Elisabeth Crane Jordyn McKenzie Crane Juliana Lily Crane Cristina Lily Crane Lily Anne Crane Abigail McKenzie Crane
Q:Flocks of cranes shout'. Is it right to use the word'shout' here?
Assuming this is creative writing and not a zoological text book, it's fine to use 'shout'.
Q:I have some cranes in our field next door and I was wondering do they eat chickens? I live in Wisconsin.?
Nope, cranes don't eat chickens
Q:Is there a crane big enough to lift Hillary off the yoga matt when she has finished her yoga?
You wouldn't need a crane, all you'd need is a hershey's bar and she'd wattle off the yoga mat. Or, you can present her with facts about the destruction of her e-mail server, the fact that she allowed innocent people in Iraq and Syria to die, or the fact that she hit the reset button with Russia, and she'll RUN AWAY from the yoga mat.
Q:how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
If an object is uniform, it's a fair bet the centre of mass will be at the centre of the shape. If lifting with slings, he will have them placed equidistant from centre, at an angle to each other not exceeding 60 degrees. He will then lift a little, and can tell by the angles from vertical of each sling whether or not the CM is under the centre of the crane cable. If not, he will lower the load, and have someone adjust the sling positions. Having slings equally loaded ensures a level load when lifting, and when a load is level it is a much safer lift than when it tilts one way or the other. A tilt would mean greater force in the sling on the low end. The load could slip out, or the excess force could break the sling.
Q:The car weights approx 900 kg.Thank you xx
Gravity acts downwards, force = mass x acceleration. Crane acts upwards at same force. As the crane starts to lift the car there is upwards acceleration that causes more force to be generated for a moment.
Q:What are the special operators of tower cranes?
Specific include construction lifting signal division, cable construction, lifting machinery, tower crane driver (T), construction crane, tower crane installation, demolition worker (T), and height job basket, installation, demolition workers.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords