• TC6014 tower crane System 1
  • TC6014 tower crane System 2
  • TC6014 tower crane System 3
  • TC6014 tower crane System 4
TC6014 tower crane

TC6014 tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TC6014 tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

 

Amplitude(m)

3-13.6

14

15

16

17

18

19

20

21

22

23

Lifting capacity(kg)

4000

3890

3618

3380

3170

2860

2810

2660

2530

2400

2290

Amplitude(m)

24

25

26

27

28

29

30

31

32

33

34

Lifting capacity(kg)

2190

2090

2000

1920

1850

1770

1710

1650

1590

1540

1490

Amplitude(m)

35

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1440

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-26

27

28

29

30

31

32

33

34

35

Lifting capacity(kg)

2000

1920

1850

1770

1710

1650

1590

1540

1490

1440

Amplitude(m)

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~48

Maximum amplitude lifting capacity

t

1.0

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

48.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

7

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

 

Q: I work in downtown Atlanta, and they are doing some kind of work on top of one of the high rise buildings downtown with a big crane. I was wondering how they got that heavy of a crane there to begin with? Thanks ahead of time!
If they have more than 13 floors, in fact there is a 13th floor. People are just too superstitious for some buildings, like hotels to state them. It will skip from 12-14.
Q: I currently have 1999 origami paper cranes. And I haven't made my 2000th yet because I don't know what to wish for :3So I wanna know...Do you have to make your wish right on the 1000th one? Or can you make the 1000th one and save it until you think of something good to wish for.I'm serious. :3
wait, you folded 1999 paper cranes and you still didn't have enough time to come up with a wish? I recommend that you wish to become more decisive...
Q: How much height should tower crane work at M?
High building one meter high voltage line to keep the relevant national standard to ensure the forearm and the adjacent adjacent tower crane tower crane standard section has a safe distance of 2 meters, big boom high high tower mechanism area covering more than one meter, the end will need to receive from the nearest cab hook.
Q: It seems like every time I turn on the news there is another crane collapse. I don't know if it is the same problem every time, but it seems awfully suspicious. Does anyone know why crane collapses seem so common lately? Has it always been this way?
You okorder .. This chart is not definitive, it leaves out many occupations (such as mining), it only considers fatalities (not loss of limbs, etc.) but it conveys the general picture. For hard data look at: www.bls /iif/
Q: well I am making 1000 paper cranes... I am on 18... but how do you string them all together anyone know?
There should be a tiny hole at the bottom. Thread some colorful embroidery floss onto a needle, poke the needle through the hole in the bottom and straight up through the point at the top (on the crane's back). You can string one after another like this. You'll have to just take a guess on the length of the thread that you'll need, and be sure to knot it on the end. I have dozens of strings that I've made and given to friends like this. If you like, you can separate each crane by a colorful glass bead. It looks really cheerful.
Q: the lifting capacity of a hydraulic crane is based on two primary design factors what are they?
Stability(when it tips) and mechanical structure (when it breaks). Bomba is right: when it comes to a simple hydraulic cylinder. The complete crane is a more complex beast than that though.
Q: A crane lifts a 1265 kg steel beam vertically 26 m, it then stops and swings the beam 3 m horizontally into a position where the welders can secure it into its proper position. What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
Q: They;re ENORMOUS!!! Do they take them apart or something?
Large cranes are dismantled and sections are placed on numerous flatbed semi-trucks and transported to other locations. Typically this is done early morning, or late evening when traffic is at its minimum. Sections are typically no longer that 60' in length.
Q: Does a crane have a pulley?AND....Is an axe a wedge?THANX CUZ I DONT KNOW WHAT IM DOING, AND OMG IM SO GOING TO FAIL MY TEST BECAUSE IM SO DUMB.
Of course cranes have pulleys. If you know how they work it should be clear. Why else do you think there are two, or more (depending on the crane), ropes attached to their hook. Every rope added, except for the first, halves the weight of the object you want to lift. If you have two ropes and an object is 5 tones, the crane will only need the power to lift 2,5 tonnes. If it has six ropes it even only need the power to lift one tonne. And an axe is a wedge, logically. In fact, every tool with a blade is more or less a wedge. After all the wedge is the principal of a blade's function.
Q: Tower crane, this model inside each letter number represents what meaning, ask the great God to inform.TCT7527-20, TC6015A-10E
Two, weight: rated lifting weight and maximum weight. The maximum rated lifting weight refers to the biggest boom in quality to allow the minimum amplitude of the tower crane, is one of the main technical parameters of the tower crane. Three, lifting...

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords