SINOTRUK - THE HIDOW HYDRAULIC EXCAVATOR HW215-8

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1-Excellent quality with competitive price.

 

2-World famous brand hydraulic system and other key parts.

 

3-Hydraulic Excavator is good excavator,have good preformance.

 

4-perfect after-sale service system.

 

 

                                                          Main Technical Paramenters
Main ParametersModelHW215-8 
(KG) Operating weight20900
(CBM) Bucket capacity0.9
(kN) Bucket digging force134.5
Performance of the Macine(rpm)     Swing speed8.6
(%)Gradeability70%
(Kpa)Ground pressure50
EngieEngine     ModelISUZU-6BG1TRP-03
(Kw/rpm) Rated Power110KW/2100RPM
Emission standardⅡphase
Hydraulic SystemMotorKAWASAKI
(L/min) Flow rate of Motor2*215L/MIN
MAIN VALVEKAWASAKI
travel motorNABTESCO
rotary motorKAWASAKI
Overall Dimensions(mm)Length9460
(mm)Width3250
(mm)Height2800
(mm) Counter weight ground clearance1090
(mm)Ground contact length of track3270
(mm)Track length4080
(mm)Shoe width600
(mm)Track gauge2200
Working Range(mm)     Max. digging radius9750
(mm) Max. digging depth6575
(mm) Max. digging height9490
(mm) Max. dumping height6745
(mm) Max. vertical digging depth5940
(mm) Max. depth cut for 2.5m level bottom6400
CabAir-conditioning     brandDENSO
seat brandGrammer 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is an easy way to determine if a concrete block wall has been filled with cement? I want to demolish it.?
Most likely they are not. You can drill a couple of holes to make sure.
Q:How do you adjust the tracks of an excavator 690b?
you hve a plate in the front on the outside, remove the plate and you will see a grease fitting, pump grease into the fitting until you reach desired tension. aint sure what the measurment is on it but dont get to tight or youll do more harm than good. track should droop a couple inchs i would think. good luck
Q:Have you ever met or dealt with someone so stupid that it made you angry?
I work in IT, so you can imagine all the idiots that I come into contact with on a daily basis. I just look at them and smile and wonder how long until they get their Darwin Award. Now I'm not saying that people that aren't computer savvy are idiots, I'm not the holier than thou type. I'm talking about the ones that will call me complaining that their computers are broken only to find out they aren't plugged in. One lady requested a new CD drive for her laptop claiming hers as broken. I go up to find out that she was placing the CDs in upside down. Sometimes a little common freaking sense goes a long way, but unfortunately no too many people in my place of employment have it. So much for being common.
Q:How long to water transplanted Arbavida trees?
all the way to winter.... these first months, the little new feeder roots are pushing their way thru the soil , expanding their area to draw water and nutrients.... if the soil goes dry, it's very hard for the little things to push thru ... so the soil should remain moist to make it easier for them .... makes for a happier tree!....
Q:The reason why the excavator holds down the engine is 150
1., although you said that the inspection is no problem, but still suggested from the most basic fuel road cleaning, replace all filter elements, began to check. The diesel pump is removed from the oil line to see if the injection length can reach about 6~7cm.2. small arm and walk, mainly pump 2 oil supply, check the main pump cleaning 2 of the regulator.3. choke 90% is fuel road failure, it is best to carefully check the oil circuit to confirm that there is no leakage of space, such as pipe joint seal damage, filter is not in place, oil-water separator, water supply cover is not tightened, etc.. Direct connection with fuel tank test can be used.
Q:What are the loading skills of excavators? Just a few words!
This question can not be made clear in 32 words! It feels like you have to do some systematic training! I learned it at the school of engineering and machinery of Zhumadian City, Henan province! Feel this home is pretty good, 1, want to be loaded quickly, the first is to be loaded with. Not half shovel. If you think so, it's all a bucket, how much you dig and how much you dig. If you dig a little more than other people, you'll be less loaded with 1-2 shovels in a car, so you're not faster than others?.
Q:Black ops zombies moon excavators problem?
Black Ops Moon
Q:Who is the big one wheel robot in transformer?
That would be Devestator. Formed by multiple robots; from Wikipedia: Scavenger, a red Terex OK RH 400 hydraulic mining excavator, closely resembling Demolishor. He forms the torso of Devastator, along with Overload. Hightower, transforms into a yellow Kobelco CK2500 crawler crane and forms the left arm. Long Haul, a green Caterpillar 773B dump truck, which forms the right leg. Mixmaster, who transforms into a black and silver Mack concrete mixer truck. He forms the head. Rampage, a yellow Caterpillar D9 bulldozer who forms the left leg. Scrapper, a yellow Caterpillar 992G scoop loader who forms the right arm. Overload, a red articulated dump truck that also forms Devastator's torso.
Q:How much are the first pilot pressure and the two pilot pressure of the excavator?!
A pilot pressure is required with the normal operation of the system is generally about 35kg, two pilot pressure used in special conditions, such as the bucket bucket must use to dig out from the stone soil and the mining stress exceeds the system overflow pressure 345KG system set in a mining buried in the earth stone, then open the two pilot system, the sum of the overflow pressure at that time as one and two times the pilot pressure is 380kg, the working pressure increased to complete this action.
Q:hi guys me and my partner are immigrating to brisbane next month from ireland she is a nurse and got sponsord?
Construction has slowed down a great deal, but if you're labouring or looking fro an apprenticeship you shouldn't have toooo much trouble. For machinery you do need relevant tickets, shuttering work is a bit of a dog eat dog industry ..... while the pay can seem good you can rack up a lot of miles which eats it away, and you'll need your own van. If you're willing to work though, you'll find it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range