Ringlock Scaffolding Vertical Support System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Ringlock Scaffolding Vertical Support System

Ring-lock Scaffolding consists of cup-lock connector, post, cross bar, diagonal brace, base and top brace. Safe and convenient to operation, fast to assemble and dismantle, widely used in scaffolding construction, such as formwork scaffold and fitment construction.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2. Main Features of Ringlock Scaffolding Vertical Support System

.Each Ring-lock is welded on post every 0.6m. Choose step pitch based on mechanical requirements

.When installing the scaffolding, insert ledger connector into the pole of the cup-lock, then hammer ledger connector to finish fastening

.The more load, the more reliable fasten

.Ring-lock Scaffolding has no special retaining member and no active parts. It’s easy and convenient to operation with integral low costs

 

3. Ringlock Scaffolding Vertical Support System Images

Ringlock Scaffolding Vertical Support System

 

Ringlock Scaffolding Vertical Support System

 

4. Ringlock Scaffolding Vertical Support System Specification

    .Buckling resistance: 2KN.M when concentrate load on cantilever and 6-9KN.m when evenly distributed load.Design load of cross bar. Design Lord of base:Pmax=60KN

 

5.   FAQ of Ringlock Scaffolding Vertical Support System

     1) What can we do for you? 

      \We can ensure the quality of the Ringlock Scaffolding Vertical Support System and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

   . If interested in Ringlock Scaffolding Vertical Support System, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

  3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

  4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

   .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Ringlock Scaffolding Vertical Support System we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I am in urgent need of emergency contingency plans
You can go to the MG flagship store inside to see, the general flagship store are authentic, the product itself is why people own production
Q:How far should the tower crane be from the outer wall?
" If you want to 2011 or the model, you can choose to update the specifications of the recent update
Q:In the project settlement of continuous rainfall led to the cost of the construction team can be like the construction side to withdraw claims
Not Kazakhstan, can not pass, there are security risks
Q:High price seeking truth! ... capacitive BCD-232M refrigerator price ... who answered, I asked him to breathe oxygen ...!
Housing construction refers to the construction of housing and other buildings in the construction of infrastructure, including residential buildings, industrial plants, commercial buildings, office buildings and other special housing The external wall insulation is made of polymer mortar, fiberglass mesh, flame retardant molded polystyrene powder, and other materials such as EPS foam or extruded plate (XPS) Into, on-site bonding construction The new insulation decorative board is produced through the assembly line, set insulation, waterproof, finishes and other functions in one, is to meet the current housing building energy needs, improve the industrial and civil building exterior wall insulation level of the preferred material, but also on the existing building energy Transformation of the preferred material
Q:Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
The actual score of each item in the checklist should be calculated as follows: A1 = B * C / 100 where: A1 - the summary table is the actual score of the sub-item; B- Full score; C-check the score score.
Q:How is the tower crane on the site raised?
The roof of the color steel composite panels can be applied to the roof insulation layer of the fixed amount of conversion in the fixed amount of the main material; because the quota is different, you use the fixed quota in such a quota on the direct application of no use of similar quota conversion material
Q:Construction site steel pipe fastener loss generally how much?
Pay attention to check, remember to take a ,,,
Q:The basic form of the outer scaffolding is filled in
Polyurethane roof with a small nail connection, board lap tight
Q:The latest "current building construction specifications Daquan" electronic version can give me a copy of it
(Insulation, thermal insulation effect is better) of the insulation material and the building wall fixed one (the thermal insulation effect is better), and the thermal insulation material is fixed with the building wall (fixed, mechanical anchoring, paste + mechanical anchoring, spraying, casting, etc.) , Increase the average thermal resistance of the wall, so as to achieve the insulation or insulation effect of a engineering practice. Should include roof insulation!
Q:Construction safety inspection score summary of the supervision unit, construction unit inspection opinions how to fill?
Safety crates, safety nets, protective gloves, protective masks, protective goggles; tower cranes, construction lifts, construction hoists, ,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range