• Tower Scaffolding system and formwork system System 1
  • Tower Scaffolding system and formwork system System 2
Tower Scaffolding system and formwork system

Tower Scaffolding system and formwork system

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Scaffolding

Shoring tower is an effective supporting system. It is easy to assemble and dismantlement, and

has excellent stability and bearing capacity. It has been widely used in the construction of industry

& residential buildings , bridges, tunnels and dam project, etc.


Characteristics:

◆ High degree of standardization.

◆ Easy storage and transportation




Q:Safety Management of Winter Construction Rules for Construction Engineering
Extruded board, xps extruded board the same, but the name is not the same as the name is not the same, b1 extruded board burning grade b1 level, as xps extruded board grade can be done b1 level can also b2 level,
Q:I am in urgent need of emergency contingency plans I am very anxious ah
You can refer to the "town gas design specifications" above should be a detailed description
Q:Rt, 3ks, as far as possible Please ask questions: is the construction site, there are other sites? More
1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
Q:What kind of scaffolding is the building divided into? Where to use it as
better strength and stiffness, excellent hydraulic characteristics, the inner wall is smooth, the resistance is small, the damage to the cough and the cough and the seepage point of the same diameter and the design of the hole and the design of the pipe, corrosion resistance, anti-wear, anti-aging, anti-aging, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti- Cracking, long life, up to 50 years or more; light weight, no special hoisting facilities, handling and installation is very convenient; comprehensive economic better Hope you can be satisfied More hope to learn the knowledge of the plastic industry
Q:Construction of the project more than the number of layers must be used construction elevator
Bulk density of polystyrene foam board should be ≥ 18kg / m; Polyurethane double-sided steel plate metal surface sandwich panel
Q:There are several special construction projects in the construction project?
What is the exterior scaffolding erection specification? What do you need to pay attention to?
Q:What is the maximum lifting capacity of the tower crane What is the maximum weight of the tower crane?
The position of the two adjacent rods should be staggered, should not be set in the synchronization, the synchronization of a vertical separation of the two joints in the height of the side of the length of the function of the population can not be less than 0
Q:Construction safety management system should be clearly defined what the content
I only know that the glass beads can be made tiles
Q:What are the basic processes of civil engineering need to prepare the construction program
The general needs of the minimum . namely: construction crane equipment (tower crane), construction crane machinery (material hoist), construction crane machinery (construction lifts), building shelves (ordinary scaffolding), construction Construction workers, construction electrical welding (cutting) workers, high operating basket installation demolition workers and other special operations personnel with or without provincial management issued by the "construction of special operations personnel operating qualification certificate", " And the card is consistent.
Q:Discussion on the Selection of Tower Crane in High - rise Building
Now the construction of the scaffolding of the steel pipe specifications are two: diameter of 48mm wall thickness 3 bones of the fence section of the lettles of the wind. 5mm; diameter 51mm wall thickness 3.0mm

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords