Stair tower for building construction

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Stair Tower


The structure of ring-lock stair tower is the same as Φ60 ring lock scaffolding.


The dimension of cross section is 1500×3000mm.It is widely used in construction.


Bearing Capacity of Stair Tower:


The stair tower can be erected with the maximum height of 150m,


when attached to the wall every 4.5m.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Seeking architectural internship diary, at least sixty, can be a different project, a project five or six of the do not made
For example: . steel pipe --- high-rise buildings and heavy load . mobile scaffolding --- generally used for lower construction or interior decoration (also . bamboo - simple low-rise buildings (like ordinary factories and Rural housing) with more
Q:I am in urgent need of emergency contingency plans
You can go to the MG flagship store inside to see, the general flagship store are authentic, the product itself is why people own production
Q:Safety Management of Winter Construction Rules for Construction Engineering
Generally take 30 to 35 on it, low hardness is not enough, the cost is too high
Q:Wanzhou District housing notarized brick structure is how much money per square meter
Main technical performance: The use of adhesive gypsum and expansion anchor will be extruded polystyrene gypsum composite plate fixed to the inside of the building wall, and the use of joint gypsum and paper tape on the joints for processing
Q:Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
Thickness and material is not the same ah also heat resistance is also different ah.
Q:Construction of the project more than the number of layers must be used construction elevator
A does not affect the claim clause B does not affect the existence of the provisions of the dispute on the settlement of the dispute C
Q:Construction site steel pipe fastener loss generally how much?
Pay attention to check, remember to take a ,,,
Q:March 20 Beijing-Zhuhai high-speed explosion, occupying the emergency lane of the car all the firefighters with forklift shovel high-speed, insurance does not lose money.
Want to know the density, we must first know that you want the board of the flame retardant grade is a few levels, or can not tell you how much density, and each company's products do not rush to avoid the rules, but also the density of the same Not the same, very different!
Q:What are the special types of jobs that need to be certified?
As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
Q:What are the main points in the inspection of building safety data?
Structural adhesive, or weathering glue, similar to the kind of silicone, but the packaging is different, silicone is plastic loaded, weathering glue and structural glue is ham sausage packaging, the price of 15-45 or so, you have seen the building glass curtain wall Glass bar, that is, with glue and adhesive structure, good can be anti-aging for decades

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range