• elevator for construction System 1
  • elevator for construction System 2
elevator for construction

elevator for construction

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
50 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Guangxi Heqing Construction Machinery Manufacture, established in 2004, is a private enterprise specializing in R&D, designing, manufacturing, selling and leasing of construction machinery, mainly producing builder hoist, mast climbing work platform, superdeck loading platform, temporary suspended platform, building maintenance unit etc.

Taking product sale and leasing as the basic market strategy, the company has effectively built “Heqing” and provided steady cash flow. On one hand, it pushes the independently developed builder hoist, mast climbing work platform, superdeck loading platform, suspended platform and other standardization products to Germany, Sweden, Australia, Malaysia, Singapore, India, etc.; on the other hand, it energetically expands leasing business of builder hoist, superdeck loading platform, suspended platform and other products. Till now, we have established leasing branches in Guangxi, Beijing, Shanghai and etc. Besides, according to the different requirements of customers, our company actively develops design, production, sale and other business of building maintenance system, steel aluminum shuttering and other non-standard building machinery and metal parts.

High-quality technological management team and first-rate production and detection equipment lay good foundation for the steady development of the company. Its technology and management personnel, including many senior engineers, have college degree or above, and skilled workers mostly have vocational school degree or above. The company also has over 200 general and special production equipment and over 300 measuring instruments for detection. The company passed the certification of ISO9001 Quality Management System in 2002, providing reliable guarantee for the management system and product quality.  

Our “Heqing” concern requirements of modern city construction and strive to provide products with advanced technology and rational price, furnish good technical support and pre and after-sales service for customers. We hope to create beautiful future with customers.

Corporate Vision

Vision:Become an ever-green construction machinery enterprise and maximally meet customers’ requirements
Core Values】  
Quality: High quality, innovation, safety and reliability.
              High quality is the basis of the enterprise.
              Innovation is the soul of the enterprise.
              Safety is reverence to life.
              Reliability wins the trust.
Service: Customer focused, customers are existence value of Heqing people, do what we have promised.
Responsibility: Attentive and responsible, brave to undertake and fully perform individual, company and social responsibility.
Spirit
Hard Work:Industry, simplicity, perseverance and hardships are the source power of Yuhuaxing to achieve transnormal and leapfrog development.
Struggle:Concentrated reflection of brave advance, assiduous seeking, brave challenge and enthusiasm and progress of Heqing people.
Pioneering & Progress::Promote traditions, keep pace with the times, have the courage to innovate and pursue excellence in work

Q:How many meters are needed to build a lift?
Residential Design Code clearly states: 4.1.6 seven or more residential or household entrance floor floor from the outdoor design of the ground height of more than 16m residential must be set up elevator. Note: ① the bottom of the store or other space as a multi-storey residential, the entrance floor of the building from the building's outdoor design of the ground height of more than 16m must be set up the elevator; ② the bottom of the floor or storage space of multi-storey residential, The entrance floor of the household entrance from the building outside the ground height of more than 16m must be set up the elevator; ③ the top floor of a set of two layers of thermocline residential, the thermocline part of the number of layers. The height of the building floor of the building is not more than 16m, the elevator can not be the elevator; ④ the middle layer of the building has the entrance to the outdoor ground and has a fire channel, the number of layers can be calculated from the middle layer ; In addition, "Office Building Design Code" also provides: 4.1.3 five and five floors above the office building should be set up elevator.
Q:What are the embedded parts in the elevator shaft?
If the shaft of the hoistway is a brick structure, it is necessary to set up a ring beam every 1500mm to 2000mm height in the hoistway (the first gear ring in the bottom of the hoistway is made up of 1500mm Set, from the second gear ring began to set by 2000mm, the top of the hoistway last gear ring by the floor 400mm set), ring beam height ≥ 300mm, elevator floor should be equipped with a beam on the edge, beam height 350mm, beam The width of the same width and the hoistway, and shall not protrude into the hoistway (the beam used to install the floor of the floor door) 2, the basement or other floor structure is not the structure of the floor, Along the beam with a beam height of ≥ 350mm, the length of the beam and the same width of the hoistway, and shall not protrude into the hoistway (this spoiled anger to drink sewn bucket bucket for the installation of the elevator floor gate) If the wall of the hoistway is a fully castable structure, it is not necessary to set the beam and the beam. If the wall of the hoistway is part of the cast - in - place structure, the position of the ring beam and the over - beam must be set.
Q:No machine room elevator working principle
Non-machine room elevator with permanent magnet synchronous traction machine, small size, high efficiency, light weight, easy control, low cost of machine room elevator is often used for the transformation of old buildings, through the elevator shaft, the production of steel stent, traction machine installation In the top side of the side due to the permanent magnet synchronous traction machine speed is higher, commonly used pulley group speed and increase the torque, and some brands of elevators in the car on both sides of the bottom with a turn rope [or called other name pulley] , Wire rope - counterweight - hoisting machine --- car bottom left - right - top turn rope round - car top, loaded wire rope - enough long winded enough trouble, a wheel is ramp loading of
Q:Where is the layer opener installed? Is the layer opener?
Are you talking about the elevator floor display? There are a lot of different names.
Q:How does the elevator GB balance factor determine? What is the basis for determining?
In the no-load and full load between the one to achieve power, reduce the purpose of traction machine
Q:What is the meaning of the elevator? The The Thank you
Take the elevator is that you buy a stock after the rise, you did not sell, the results fell back to the starting point. The whole process is called a lift.
Q:Recently, the Internet is a fire of an IQ problem: the elevator can take up to 10 people, you happen to be the first 10, into the elevator after the overweight, you had to go out of the elevator, the elevator door closed, you think of a horrible thing, Immediately told the police. I would like to ask, what is the matter? Tip 1: At that time is the summer hair into the useless call out both study lu day, the elevator 9 men and women, no pregnant women, no fat, no pet tips 2: the top of the elevator No body tips 3: no one to bring the trolley case can be horn deadly 4: elevator no bad tips 5: do not believe that the answer to the Internet !! Now all the answers online are wrong !! Tip 6: the answer in the text , Read it carefully. Well I thought for an hour the reasoning about twenty more than the hypothesis but the answer 6 in the text I can not stand the big God online copy of the words you go for help ah more
You are a police escort 8 prisoners and 1 woman with a lift, you are overweight so out of the elevator. At this time there are 9 people in the elevator there are men and women, the elevator door closed after you realize that you put eight prisoners and a female stay in the elevator. So the alarm. Mainly: your identity (police, mental hospital care) elevator man (prisoner mentally ill) (woman in elevator (judge female victim female doctor or nurse)
Q:There are songs, the lyrics involved in "anyway, every day will take the elevator"
This is the song name "fancy her" singer: dawn album: redshoes lyrics content: you but my girlfriend disappeared for a week do not give an account of it only two minutes to keep the elevator girl but accompany me up the mountain you see her white The gloves gently press the elevator fly the sky so high you have not thought of giving me the same smile in every beautiful morning for my soul bath I want to see what she has any relationship anyway I will take the elevator every day I want Take a look at her you do not get angry anyway I want to love you can not see you no matter how I want to catch up with your belt to miss you should not be the door did not open I guess her lipstick color like this is not love Her crimson hat let me think that the elevator inside never worry that I think the distance will be less and less if she will be sorry I pretend to read the newspaper
Q:Always dream of their own sitting in the elevator, a person, such as I press the 10th floor, the elevator will rise to their own 70,80 floor so, after the fall and then what is the meaning of falling?
With your current career | academic related to the fall: indicates that the cause of the valley
Q:Why is the elevator in the Zifu Fu letter of the gearless traction machine do not use the upstream overspeed protection of the rope device? More
The role of the gripper is called the up-speed overspeed protection device, he has two roles A role in the elevator up to run when the speed protection, there is a gear traction machine because the worm was broken, causing the traction wheel itself to turn up, Although the brake holding, in the state of the brake but does not work, and drag the car up the car over the speed of this time is the need to play the rope device, and no gear traction machine without worms so also There is no cochlear tiger class mortar straight hinge trip Leopard busy bar off the problem do not have to grip the rope.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords