Building Hoist or Construction Hoist

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
50 m/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Guangxi Heqing Construction Machinery Manufacture,established in 2004, is a private enterprise specializing in R&D, designing, manufacturing, selling and leasing of construction machinery, mainly producing builder hoist, mast climbing work platform, superdeck loading platform, temporary suspended platform, building maintenance unit etc.

Taking product sale and leasing as the basic market strategy, the company has effectively built “Heqing” and provided steady cash flow. On one hand, it pushes the independently developed builder hoist, mast climbing work platform, superdeck loading platform, suspended platform and other standardization products to Germany, Sweden, Australia, Malaysia, Singapore, India, etc.; on the other hand, it energetically expands leasing business of builder hoist, superdeck loading platform, suspended platform and other products. Till now, we have established leasing branches in Guangxi, Beijing, Shanghai and etc. Besides, according to the different requirements of customers, our company actively develops design, production, sale and other business of building maintenance system, steel aluminum shuttering and other non-standard building machinery and metal parts.

High-quality technological management team and first-rate production and detection equipment lay good foundation for the steady development of the company. Its technology and management personnel, including many senior engineers, have college degree or above, and skilled workers mostly have vocational school degree or above. The company also has over 200 general and special production equipment and over 300 measuring instruments for detection. The company passed the certification of ISO9001 Quality Management System in 2002, providing reliable guarantee for the management system and product quality.  

Our “Heqing” concern requirements of modern city construction and strive to provide products with advanced technology and rational price, furnish good technical support and pre and after-sales service for customers. We hope to create beautiful future with customers.

Corporate Vision

Vision:Become an ever-green construction machinery enterprise and maximally meet customers’ requirements
Core Values】  
Quality: High quality, innovation, safety and reliability.
              High quality is the basis of the enterprise.
              Innovation is the soul of the enterprise.
              Safety is reverence to life.
              Reliability wins the trust.
Service: Customer focused, customers are existence value of Heqing people, do what we have promised.
Responsibility: Attentive and responsible, brave to undertake and fully perform individual, company and social responsibility.
Spirit
Hard Work:Industry, simplicity, perseverance and hardships are the source power of Yuhuaxing to achieve transnormal and leapfrog development.
Struggle:Concentrated reflection of brave advance, assiduous seeking, brave challenge and enthusiasm and progress of Heqing people.
Pioneering & Progress::Promote traditions, keep pace with the times, have the courage to innovate and pursue excellence in work

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Elevator industry, the traction machine has permanent magnet synchronous motor and permanent magnet asynchronous motor two, what is the difference between them?
AC motor to rotate requires two conditions: first, there is an active rotating magnetic field; second, there is a magnetic field driven by this active magnetic field. In general, the rotating magnetic field from the stator winding, three-phase AC power naturally formed a rotating magnetic field. The difference between a synchronous motor and an asynchronous motor lies in the source of the rotor magnetic field. The synchronous motor requires an excitation power source, or a permanent magnet, so that the rotor always has a magnetic field that can be driven by the rotating magnetic field provided by the stator. As long as the braking torque is reasonable, the final rotor speed can always reach the stator in the rotating magnetic field speed, that is, synchronous speed. This kind of motor is synchronous motor. Asynchronous motor is simply closed end of the whole family is relatively simple. The magnetic field of the rotor is derived from the rotating magnetic field provided by the stator windings to cut the current generated by the conductor in the rotor. In other words, the induced current generated by the rotating magnetic field cutting rotor from the stator produces a second magnetic field based on the rotor, and the rotor rotates due to the interaction of the two magnetic fields. The greater the difference in speed between the rotor and the rotating magnetic field, the greater the rotor current, and the stronger the effect of the two magnetic fields. As the speed increases, the rotor current is getting smaller and smaller, but never. This creates that the rotor speed must have a certain difference from the synchronous speed to maintain the rotating magnetic field to cut the rotor conductor. To maintain the continuous rotation of the rotor. The difference between this speed and the speed of synchronous speed is the slip rate. Asynchronous motor speed never reach the synchronous speed, so called asynchronous motor
Q:Does the state require the number of floors above the elevator?
7 floors above, excluding 7th floor
Q:Elevator positioning problem
Oh, your question is very interesting. To be honest, my unit to do the product is about this. do you know? In fact, the elevator floor positioning is not only on the rope to capture and make up the ancient cast off the rough, but also in the floor of each layer on the positioning. Also, now the general elevator electronic core board are used in the intelligent positioning system. So this problem is generally not out of the problem. Of course, do not rule out special problems, such as all blackouts and so on.
Q:Title: a woman was followed by a man, she went into the elevator and found the man also came in.
I can not think of the elevator on the line, because he was afraid of the camera so that the woman and the elevator into the elevator when there is no killing her, so he can not kill her in the elevator, this time by siren, and then no elevator waiting for the rescue The Those who said in the third floor elevator open moment by the door simply does not work, because the murderer certainly waiting on the third floor, she went to the third floor elevator opened, the murderer found that she would not come out on the fourth floor in advance (if the woman on the first floor of the murderer can also be ahead On the second floor) press the door button, this is because whether she press the upstairs or down the elevator outside the arrow can be seen, the murderer can reach the next level in advance, and then the murderer into the elevator and before, this time repeated Staged, so stay inside the elevator does not move, the police press the emergency by the sudden angrily get the whole button to have the opportunity to escape!
Q:Elevator door in the sub-door and the difference between the two points is defined as the god of God ah?
In the middle of the door: two doors, separated from the middle, each opened to both sides of the double fold: double folding elevator door has four door panels, the elevator door to open on both sides, every two door board through the two Danchuo door arm to the equivalent
Q:What is the meaning of elevator fire linkage?
Only two kinds of start to play Cheong Chai leek to help blood explosion method, the first first-class fire switch manually start, the second building fire control room to start. The so-called fire linkage is to require the elevator to connect with the building's fire system, the building's fire equipment starts, the elevator must also start the fire state!
Q:What are the doors of the elevator?
Each elevator has two doors on each floor
Q:Are the elevators now hydraulic?
no. brand will be used with ease. The The Ha ha. The The
Q:Offer an elevator what parameters are required
1, the first elevator nature, what you want to do elevator, elevator types are: passenger elevator, cargo elevator, sightseeing ladder, escalator, sidewalk, etc. 2, and then give the other side of the hoist size 3, give the station (how many layers) (0.25 m / s, 0.5 m / s, 1.0 m / s, 1.5 m / s, 1.75 m / s). 0.25 and 0.5 are ladders, and the rest are passenger ladder. 4, domestic brands or foreign brands.If it is skilled in the elevator salesman he will give you a he think it is more suitable for your use of the program, such as how much load, how much speed or something.
Q:Hello, Hitachi Elevator is often a 38 fault is what reason. There are those cases he out of 38 failure, how to solve?
38 Run contactor disconnect fault

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat