Building Hoist or Construction Hoist

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
50 m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Guangxi Heqing Construction Machinery Manufacture,established in 2004, is a private enterprise specializing in R&D, designing, manufacturing, selling and leasing of construction machinery, mainly producing builder hoist, mast climbing work platform, superdeck loading platform, temporary suspended platform, building maintenance unit etc.

Taking product sale and leasing as the basic market strategy, the company has effectively built “Heqing” and provided steady cash flow. On one hand, it pushes the independently developed builder hoist, mast climbing work platform, superdeck loading platform, suspended platform and other standardization products to Germany, Sweden, Australia, Malaysia, Singapore, India, etc.; on the other hand, it energetically expands leasing business of builder hoist, superdeck loading platform, suspended platform and other products. Till now, we have established leasing branches in Guangxi, Beijing, Shanghai and etc. Besides, according to the different requirements of customers, our company actively develops design, production, sale and other business of building maintenance system, steel aluminum shuttering and other non-standard building machinery and metal parts.

High-quality technological management team and first-rate production and detection equipment lay good foundation for the steady development of the company. Its technology and management personnel, including many senior engineers, have college degree or above, and skilled workers mostly have vocational school degree or above. The company also has over 200 general and special production equipment and over 300 measuring instruments for detection. The company passed the certification of ISO9001 Quality Management System in 2002, providing reliable guarantee for the management system and product quality.  

Our “Heqing” concern requirements of modern city construction and strive to provide products with advanced technology and rational price, furnish good technical support and pre and after-sales service for customers. We hope to create beautiful future with customers.

Corporate Vision

Vision:Become an ever-green construction machinery enterprise and maximally meet customers’ requirements
Core Values】  
Quality: High quality, innovation, safety and reliability.
              High quality is the basis of the enterprise.
              Innovation is the soul of the enterprise.
              Safety is reverence to life.
              Reliability wins the trust.
Service: Customer focused, customers are existence value of Heqing people, do what we have promised.
Responsibility: Attentive and responsible, brave to undertake and fully perform individual, company and social responsibility.
Spirit
Hard Work:Industry, simplicity, perseverance and hardships are the source power of Yuhuaxing to achieve transnormal and leapfrog development.
Struggle:Concentrated reflection of brave advance, assiduous seeking, brave challenge and enthusiasm and progress of Heqing people.
Pioneering & Progress::Promote traditions, keep pace with the times, have the courage to innovate and pursue excellence in work

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to set the elevator shaft
There are the following items 1, the implementation of steel reinforcement corresponding project 2, concrete concrete implementation of the corresponding project 3, the template in the fixed in a proprietary, is the elevator shaft wall template, in practice, you can also use the shear wall project 4, This is the scaffolding in the project 5, you see the construction organization design, that there is a corresponding process requirements, there will be no drawings such as bolts and other materials,
Q:Rated load 1050KG elevator on the weight is generally how much
The weight of the weight = car weight + half of the rated load is the weight of the counterweight + weight = car + balance coefficient (here take 50%) * rated load of your elevator factory weight is the number of KG ? 1050KG elevator, then the total weight of the total weight of 1.3T ~ 1.4T 酣 households Feng Feng Ju 莶 angle to bring around the ax. (Including the heavy frame). That is 50KG on the heavy block, then need 24-28 pieces. If you do not worry, after loading the balance under the measured coefficient to ensure that the balance between 0.4 to 0.5 can be installed after the can also be added or minus the weight.
Q:What does the elevator use for the weight?
Balanced car weight is designed to achieve power savings.
Q:Vertical elevators between the two kamels distance 11m must be installed in the middle of the security door?
Yes, according to the regulations must be added security door.
Q:How to install the elevator monitor how to take the elevator in the video line with what kind of what?
General use SYV-75 video cable. If the cable is reserved, if the cable is reserved for the video cable, if it is not, connect the video cable to the elevator cable.
Q:There is no exhaust fan in the elevator
No, there is a corresponding exhaust. There is no dedicated exhaust fan.
Q:How can the elevator handle?
First floor, a look at the outsiders do know the layman on the fills, but also the idiot of the experts to teach others if it is a power outage, then immediately from the big numbers to a small number of times, so that the elevator can be a buffer every time that is a power outage , But also to press, your hands OKorder and OKorder guilty cunning armor for the anchor machine no electricity, and still there, press the phone can not answer the phone in addition to this sentence if the elevator is broken, it should be inside the elevator Of the sirens notice outside, or call (but the elevator inside the signal is not very good). The other is fart if the elevator off the person, you should press the elevator inside the alarm and the above intercom call to inform the outside and duty room, no one can use the phone to answer, no signal can beat the door, where the elevator flow Are relatively large, so do not worry about others do not know the elevator inside the air is flowing, do not worry will suffocate, because it is not sealed
Q:Tangled title: the woman came home and found to be a man to track, when she walked into the elevator when the man came in.
This sentence: every word is a point of information (comma-based): the first sentence, "home" does not mean "back to the home" (back home is "upstairs", this is "downstairs"); 2 women into the men with, the women get out! So must enter; 3,4,5: because it is downstairs, men positioning "two", like, on the second floor, a layer easily lead witnesses! She is three in order to advance in advance! 6: the man took the knife to the woman stabbed, the elevator door closed, the woman has been dying, "the results of a woman die! Positive solution: a woman by the end of the "three" immediately out of the elevator door to escape the product theory: the problem is the subtle nature of the use of people drop normal thinking, logical thinking! That is, the drama played! So confused you!
Q:How to save the elevator
I am engaged in maintenance, you say this situation is very rare, very little, do not know? There is a possibility, that is overload, so advise you not to squeeze the elevator. Normally the elevator will not fall. Even if it is overloaded fall, nor is you imagine the free fall, as the speed will not be very fast. The elevator has a lot of protection devices, even if the same protection device failure, can not fail at the same time, so the elevator is safe, the elevator for more than 100 years, you heard someone in the elevator from falling above the fall of the people? No. The elevator has to kill people, but are not falling when people died in the elevator, dead mostly elevator workers. Belong to the illegal operation, their own play dead. So the elevator failure, do not panic, stay inside do not tamper on the line, no life dangerous. As for the TV on the knees to bend like, no need. Right is immediately by the elevator phone keys, notify the professionals to deal with. Do not arbitrarily Pa door, tamper with the like. If the phone is unreasonable, mobile phone, mobile phone nowhere, pat on the car door, propaganda. Hope to adopt. Thank you
Q:Analysis of the causes of broken wire rope in elevator
There are two cases of wire rope section: 1, the quality of wire rope is not good; 2, up the wheel of the force there is a problem, the state is not allowed to 5%, if the force is greater, may lead to damage to the traction wheel. Wire rope in general if there is a phenomenon of shares have to be replaced. These standards you can find in the State Quality and Technical Supervision where it is, where more complete it...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range