• aluminum construction mobile scaffolding tower System 1
aluminum construction mobile scaffolding tower

aluminum construction mobile scaffolding tower

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


Quick Details

Place of Origin:
Guangdong China (Mainland)


Model Number:
st-1016
product name:
aluminum construction platform lift tower mobile scaffolding
material:
aluminum
colour:
silver,etc.
size:
L2M*W1.35M,L1.5*W1.8M,etc.
height:
customize
application:
workbeach platform
advantage:
quick delivery
MOQ:
2sets
certification:
TUV ISO9001:2008,SGS
warranty:
1year

Packaging & Delivery

Packaging Detail:carton,air bubble film,according to your request
Delivery Detail:10 days after 30% deposit

Specifications

scaffolding
1.material:aluminum
2.unit size:L2*W1.35*H2m,etc
3.Height:customized
4.ISO,TUV, SGS

Details

  1. Material: Aluminum alloy 6061-T6

  2. Scaffolding Specification: Size:(L*W*H) :The height is between the floor and  workbench platform,not the total height.

  3. L1.5m * W0.7m *H4m         L1.8m *W0.7m * H6m
  4. L2.4m * W1.2m * H3m        L 2.4m *W1.2m *H6m
  5. Height:customized.

  6. Main tube: (diameter*thickness)50*3mm

  7. The safe guard frame height: 1.2M

  8. Each transom center distance:500mm

  9. Pedal Max loading:225kgs/2pcs

  10. Stabilizer Length:1.8m/3m

  11. Technique:welding

  12. Feature: Integral ladder increased user’s safety. Ribbed frame horizontals are non-slip. All the frame scaffolding parts are connected with carbon dioxide arc welding to reduce cracking or deformation

  13. Application: For high-rise construction work both inside and outside, be installed simply and safety



Q: Wanzhou District housing notarized brick structure is how much money per square meter
Main technical performance: The use of adhesive gypsum and expansion anchor will be extruded polystyrene gypsum composite plate fixed to the inside of the building wall, and the use of joint gypsum and paper tape on the joints for processing
Q: What are the basic processes of civil engineering need to prepare the construction program
The general needs of the minimum . namely: construction crane equipment (tower crane), construction crane machinery (material hoist), construction crane machinery (construction lifts), building shelves (ordinary scaffolding), construction Construction workers, construction electrical welding (cutting) workers, high operating basket installation demolition workers and other special operations personnel with or without provincial management issued by the "construction of special operations personnel operating qualification certificate", " And the card is consistent.
Q: Safety Management of Winter Construction Rules for Construction Engineering
Clamp type flexible telescopic connection: Clamp type flexible telescopic group: Outer card, seal ring, inner card connector, fastening bolt Clamp type flexible telescopic connection Features:
Q: Construction safety management system should be clearly defined what the content
We first come to understand what is the scaffolding is what
Q: What are the main points in the inspection of building safety data?
Better with styrofoam, that is, can be insulated and heat.
Q: 1 cubic tap water there is no way to reduce the water temperature to 15-18 degrees
Desulfurization and denitrification equipment will be used in metal hose metal hose is an important engineering engineering connection components, by the corrugated flexible tube, mesh sets and joints combined
Q: Discussion on the Selection of Tower Crane in High - rise Building
project overview (project location, building height, ) the scaffolding erection form (floor type, steel cantilever) and erection parameters (erection height, vertical pole distance, distance, step, even the wall spacing, steel spacing, steel length, etc) construction and deployment (quality Safety management system; materials, equipment and labor organization; construction schedule, etc) scaffolding construction requirements and technical measures scaffolding construction and quality and safety management contingency plans scaffolding calculation book related accessories and charts Flat layout map, scissors supporting the elevation map, even the wall pieces of Fu Fung Phoenix Yu Hao Feng pupil tripod map, pole base node map, etc)
Q: Brief description of what is the danger source of the squad leader
The two kinds of sheet metal forming process is not the same Polyphenylene plate is made of volatile liquid blowing agent of the polystyrene beads, after heating preheated in the mold after heating with a fine closed-cell structure. Breaking the look will be a grain of grain. Usually white extruded plate It is made of polystyrene resin and other additives by extrusion process has a continuous uniform surface and closed-cell honeycomb structure of the plate. More brittle, but also deformation. All kinds of colors are, because the manufacturers in order to distinguish between their own brand to add something.
Q: Why is all the civil safety information, there is no special decoration safety information? More
Test thermal conductivity is generally chosen to test the heat flow meter
Q: What kind of jobs are the construction workers in the labor service network of the China Construction Service Network?
Construction engineering consumption in the fixed amount of corrosion, insulation, insulation works that chapter has polystyrene plastic plate insulation layer of this fixed child!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords