Tower Scaffolding System / Scaffold Formwork For Industrial Buildings

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description:

1. Brief introduction

A convenient scaffolding system, especially for load-bearing support, its structure is simple and reasonable, its operation is easy and flexible, and the system is widely used in industrial buildings and civil buildings.


Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings


2. Competitive advantage
①. Product standardization, produce cost is lowered.

Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings

As the picture left shown, the standard is auto-welded; all the distance between cross plates of standards with different length is 500mm, which makes the auto-welded working method be easily achieved.

②. Spatial tower assembly guarantees high load-bearing capacity.

The main body of RL-scaffolding system is consisted of standard, ledger, diagonal ledger, and diagonal brace. The system forms a whole spatial frame structure that guarantees its high load-bearing capacity.

③.Smart joint design guarantees safe application and easy operation.

As the picture below shown, the “connect head” stuck in the position of cross plate with correct hole, then fix the pins tightly with a hammer, after that, you finish the whole connection work. The joint is safe and firmly.

Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings

3. Applications

Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings

Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings


Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What kind of special jobs are available at the construction site?
Xps full name extruded polystyrene foam board with polystyrene foam board (EPS) compared to the extruded board insulation effect is better. Compared with polyurethane, phenolic resin, extruded board insulation effect to be almost
Q:Construction safety management system should be clearly defined what the content
According to the material can be divided into organic insulation materials, inorganic insulation materials and metal insulation materials three categories
Q:Discussion on the Selection of Tower Crane in High - rise Building
Now the construction of the scaffolding of the steel pipe specifications are two: diameter of 48mm wall thickness 3 bones of the fence section of the lettles of the wind. 5mm; diameter 51mm wall thickness 3.0mm
Q:What are the safety protection appliances, machinery and equipment, construction machinery and accessories for construction enterprises?
Presumably everyone on the external scaffolding erected norms of the word feel strange, do not know what it is about what is it? Now look at what: What is the external scaffolding erection specification: r n the following to pay attention to: in their daily lives which are needed
Q:How to review the special construction of steel structure
He found that the current flows from the positive pole of the filament to the metal sheet, rather than from the negative electrode
Q:What are the special types of jobs that need to be certified?
As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
Q:What kind of jobs are the construction workers in the labor service network of the China Construction Service Network?
Generally small diameter of the socket more, large diameter welding or hot sets But no matter what way to connect, backfill quality is the most critical, especially for this flexible tube, backfill quality is not good, can easily lead to the control of muscle 碃 crown degree of protection Especially for large diameter pipes, backfill quality, in order to ensure the ring stiffness of the pipeline to reduce deformation and damage
Q:What are the relevant laws and regulations for the filing of the attached scaffolding project above 150 meters?
Under the circumstances of the frame body, the floor type double row steel scaffolding
Q:Safety Management of Winter Construction Rules for Construction Engineering
Clamp type flexible telescopic connection: Clamp type flexible telescopic group: Outer card, seal ring, inner card connector, fastening bolt Clamp type flexible telescopic connection Features:
Q:The basic form of the outer scaffolding is filled in
Polyurethane roof with a small nail connection, board lap tight

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range