Tower scaffolding for formwork and scaffolding system

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Scaffolding

Shoring tower is an effective supporting system. It is easy to assemble and dismantlement, and

has excellent stability and bearing capacity. It has been widely used in the construction of industry

& residential buildings , bridges, tunnels and dam project, etc.


◆ High degree of standardization.

◆ Easy storage and transportation

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:All steel formwork in construction, after the completion of concrete pouring
Two possibilities, one is the vibration of concrete and other factors to produce concrete segregation; the two is the ratio of the concrete itself (see a similar situation, pumping agent over)
Q:Plastic building template? How is the effect? What are the advantages and disadvantages?
Plastic construction formwork turnover number can reach more than 30 times, but also recycling. The temperature range is large, the specification is strong, can be seen, drill, easy to use. The smoothness and smoothness of the surface of the template exceed the technical requirements of the existing clear water concrete formwork, and the utility model has the functions of fire resistance, corrosion resistance, water resistance and chemical corrosion resistance. Can meet the demands of building formwork of various cuboids and cubes, L shape, U shape requirements
Q:What is the 86 series steel formwork
If a large concrete pouring for the interruption or delay the closing fast and easy net is a kind of ideal material, it is a kind of preparation activities can form any emergency terminated required. The construction can be quickly restored, without dismantling work for temporary sealing end. Because of the use of quick and easy closing network can quickly build not included in the plan terminated, as a contingency measure. Customers can before large casting at the site to prepare some available will be attached, with concrete formwork for pouring the easy days after creating the ideal surface cementation.
Q:I would like to ask, large steel formwork and the average number of square meters of a template?
Single wage calculation, 9000 flat template assembly line
Q:Are all steel plates used for beam slab prefabrication
Should be determined according to the shape of the prefabricated components, specifications, to facilitate construction, cost savings, to ensure the quality of the premise.
Q:On the problem of precast box girder formwork
Especially for the construction of large bridges, the construction method of ten million, who is the way to think, who will make money in this regard. Therefore, this patent product is spent on the work of people's minds, before the patent application is not approved, is not willing to disclose to others.
Q:Want to ask the difference between the steel template and wooden template
Wood template is artificial site processing, the use of a variety of complex structural modeling, and now use the glue template is also a lot, in addition to good heat dissipation of steel templates, the use of large steel formwork is good
Q:The first layer is higher than the standard layer height, the big template according to the standard layer
The project is from the construction point of view. From the point of view of construction joints should be left in the column 1/2 high as well, where the shear is small. Consistent with the principle of beam slab stay within the 1/4.
Q:I would like to ask the bridge column (D110) steel template thickness should be how much
Parting is generally divided according to the release of simple or rounded way, according to the height of the construction plans and schedule requirements. Generally, the height of the column template is set at 1.52 or 0 5m in order to be easy to use.
Q:What is the difference between the steel template and the assembled steel template?
Stereotypes templates such as 1200*2001500*300 and so on and the combination of steel template is the use of these provisions of the steel template to be spliced into the target combination template.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range