• Shoring Tower Scaffolding Vertical Support System System 1
  • Shoring Tower Scaffolding Vertical Support System System 2
  • Shoring Tower Scaffolding Vertical Support System System 3
  • Shoring Tower Scaffolding Vertical Support System System 4
  • Shoring Tower Scaffolding Vertical Support System System 5
  • Shoring Tower Scaffolding Vertical Support System System 6
Shoring Tower Scaffolding Vertical Support System

Shoring Tower Scaffolding Vertical Support System

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Tower Scaffolding

Shoring tower is an effective supporting system. It is easy to assemble and dismantlement, and has excellent stability and bearing capacity. It has been widely used in the construction of industry & residential buildings , bridges, tunnels and dam project, etc.

 

2. Main Features of Tower Scaffolding

① Product standardization, produce cost is lowered.

We design kinds of specific specification of frame with different sizes; the introduction of Robot Weld technology improves production efficiency and production capacity.

② Spatial tower assembly guarantees high load-bearing capacity.

Like RL-scaffolding, tower scaffolding also forms spatial tower structure, which guarantees excellent load-bearing capacity and its assemble is faster by means of standard frame.

 

3. Tower Scaffolding Images

 

 

 

 

4. Tower Scaffolding Specification

Shoring Tower Scaffolding Vertical Support System

 

5. FAQ of Tower Scaffolding

1) What can we do for you? 

We can ensure the quality of the Tower Scaffolding and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

2) What promises can be done by us?

If interested in Tower Scaffolding, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

3) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

If the products are not based on the requirements, there will be the relevant compensations made for you.  

4) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of Tower Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days. 

Q:What are the special construction plans for the rainwater tank culvert project?
Machine tools: responsible for the engine, gearbox, brake system, steering system, cooling system (not air conditioning), chassis and so on
Q:What are the safety protection appliances, machinery and equipment, construction machinery and accessories for construction enterprises?
Building construction organization design book. Vertical distance: Scaffolding pole horizontal spacing, single row of scaffolding for the external pole axis to the wall of the distance step: scaffolding up and down the horizontal bar of the top of the Shanghai love Gui Nong cunning with the anchor axis distance. Is equivalent to the length and width of a cube.
Q:Brief description of what is the danger source of the squad leader
Scaffolding in the structure, vertical and horizontal vertical scissors, even wall pieces, horizontal scissors support, vertical pole, horizontal spacing, horizontal bar step, steel pipe connection, fasteners, pole base, vertical, sweeping the ground, etc , JGJ130-2011 "construction of fasteners steel scaffold safety technical specifications" on the complete provisions In addition to meet the structural requirements, the calculation of the body of the frame must meet the requirements
Q:March 20 Beijing-Zhuhai high-speed explosion, occupying the emergency lane of the car all the firefighters with forklift shovel high-speed, insurance does not lose money.
Want to know the density, we must first know that you want the board of the flame retardant grade is a few levels, or can not tell you how much density, and each company's products do not rush to avoid the rules, but also the density of the same Not the same, very different!
Q:What is the difference between the inside and outside of the car
The ambient temperature is low so the cooling mode does not start. Heating outside the machine first start, the machine delay start, and need to run for a while only hot air
Q:How to calculate the vertical shipping cost of decoration
Extruded polystyrene insulation board according to the design requirements to take the thickness
Q:Summary of the construction safety check score after the summary score how to count
In each new site to use the scaffolding, before erection, each batch, whether new or old, or rent, buy their own, have to bring the inspection and testing of qualified testing organizations testing.
Q:How is the tower crane on the site raised?
Bai google your good luck hunger aids to hold the silicone bucket hello good luck your google google good luck a good luck to dig a hollow wall is to remove the safe range of attention to the program
Q:Construction safety management system should be clearly defined what the content
We first come to understand what is the scaffolding is what
Q:What are the basic processes of civil engineering need to prepare the construction program
The general needs of the minimum . namely: construction crane equipment (tower crane), construction crane machinery (material hoist), construction crane machinery (construction lifts), building shelves (ordinary scaffolding), construction Construction workers, construction electrical welding (cutting) workers, high operating basket installation demolition workers and other special operations personnel with or without provincial management issued by the "construction of special operations personnel operating qualification certificate", " And the card is consistent.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products