• QTZ80(TC5513) tower crane System 1
  • QTZ80(TC5513) tower crane System 2
  • QTZ80(TC5513) tower crane System 3
  • QTZ80(TC5513) tower crane System 4
QTZ80(TC5513) tower crane

QTZ80(TC5513) tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ80(5513) tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

 

Amplitude(m)

3-13.6

14

15

16

17

18

19

20

21

22

23

Lifting capacity(kg)

4000

3890

3618

3380

3170

2860

2810

2660

2530

2400

2290

Amplitude(m)

24

25

26

27

28

29

30

31

32

33

34

Lifting capacity(kg)

2190

2090

2000

1920

1850

1770

1710

1650

1590

1540

1490

Amplitude(m)

35

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1440

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-26

27

28

29

30

31

32

33

34

35

Lifting capacity(kg)

2000

1920

1850

1770

1710

1650

1590

1540

1490

1440

Amplitude(m)

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~48

Maximum amplitude lifting capacity

t

1.0

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

48.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

7

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

 

Q: Write a fully developed paragraph that contrasts the effects of war in two of the following works: Cranes, Thoughts of Hanoi, and Tokyo.
Hanoi To Tokyo
Q: i have to make a children's story about how the whooping crane became endangered; (based on real facts) ideas?
You could write a story about an old Whooping Crane with lots of children that goes on migration only to come back and find her home has been destroyed. So she goes and starts trying to raise awareness about it, and eventually finds a new home due to her efforts. This would need much more tweaking and changing of course.
Q: I am trying to beat the level for the paper cranes on we love katamari damacy, and its really difficult.Anyways, i have completed all of the other levels so far except for a few like the clouds, save the pandas etc., do i have to complete the paper cranes to access these levels?
Lol I know what you're coming from. You don't exactly have to get 1000 cranes. Try to roll up as many cranes as you can get (tiny cranes count as well). From the start, don't just roll up cranes. You want to grow your katamari so you would be able to roll around more stuff. If there are small things that ARE NOT cranes and is your katamari size, roll them up. That will make your katamari bigger and allow you to roll up more bigger sized cranes. Since most cranes are bigger than the katamari that you start the level with, roll up random things to make your katamari bigger. The bigger your katamari is, the easier it is to roll up many cranes. I managed to roll up about 600 cranes on my first try (after replaying the game on a new file). Did you unlock the clouds and save the pandas yet? If you did, yo don't have to complete the paper cranes to access those levels. You just need to complete the paper cranes, the clouds and the pandas to unlock more levels.
Q: Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
Q: how much does a crane operator make ?
Tons of money. I use to off load ships in the San Diego harbor and they were long shore men or women. The crane operator made about $40 per hour.
Q: What are the main technical parameters of a tower crane?
Generally speaking, the main parameters of the tower crane are:Maximum amplitude unit MMaximum lifting height, unit MMaximum lifting torque unit KN.mMaximum lifting speed unit m/minMaximum lifting unit tRotational speed unit r/minVariable speed unit m/min or o/minWalking speed per unit m/minMotor power unit w......Please refer to the product manual.
Q: Do they come all the way down?
Don't walk below. Seriously!
Q: What is the dumbest bird in the aviary community? Is it really the Crane?
great question! I would love an aviary that was half open/half closed. I would love the birds to have the option at all times of choosing the protected surroundings (from weather, sounds, other animals, etc) of inside. Just as convenient would I love their ability to be outside in the fenced aviary so as to choose t heir own environment filled with trees, shrubs, plants, fountains but with enough room for me to observe and enjoy their interaction.
Q: I need to do a report about Stephen Crane, answering the question how did his life affect his how he wrote his books, does anyone know?
Crane is noted for his early employment of naturalism, a literary style in which characters face realistically portrayed and often bleak circumstances, but Crane emphasized impressionistic imagery and biblical symbolism rather than graphic realism. Crane's realism, writes William Peden, is often more impressionistic than photographic; his interest in psychological probing, his innovations in technique and style, and his use of imagery, paradox and symbolism give much of his best work a romantic rather than a naturalistic quality. Both realism and symbolism, the two major directions of modern fiction, have their American beginnings in Crane's work.
Q: in design of steel structures as per asce2005 or ibc2006 ,what load combinations are to be considered when crane loads and seismic loads are present?
Uh, depends on if you're using ASD or LRFD load cases out of ASCE 7-05. I also think IBC 2006 sometimes changes the fine print and also offers their own load cases for ASD and LRFD. A starting point (LRFD case 5 ASCE 7-05) might be 1.2D+1.0E+ L, and for ASD - case 6 - D + 0.75(0.7E) + 0.75L.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords