PE Reinforced Film

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1 Ton m.t.
Supply Capability:
20 Container Per Month m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

PE reinforced film, reinforced poly film,featured by

1) Material:100%PE. two sides laminated.
2) Weight: 100gsm-200gsm
3) UV protected.

 
Color of PE reinforced film:


Transparent, sliver, yellow,green,with natural weaving. 

 

Type of PE reinforced film:


* Finished size: with ropes in hem and aluminum eyelets every 3 feet or customized
* Roll size: width 2m*length 100m /roll.

 

 PE Reinforced Film
 
 
Application of PE reinforced film:
 
 
*GENERAL COVER
*SCAFFOLDING : For the construction buildings, prevrention from dropping
dangerous things, keeping warm, it prevents dust and contaminated dirt from
the inside of the construction buildings. 
*ROOFING : Waterproof from outside and keep away from wetness inside of the roof. 

 

 PE Reinforced Film

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Basement cushion waterproof
First, the basement moisture treatment structure is usually: first in the basement wall outer surface wiping 20mm thick 1: 2 waterproof mortar, basement walls should be used cement mortar masonry, gray seam must be full; and in the basement floor and the first Floor floor is divided into two walls of the level of moisture-proof layer. The outer wall of the basement wall should be tampered with the soil with poor permeability.
Q:Cushion, waterproof layer construction to do what information
4, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
Q:Roof waterproof mattress should play the number of centimeters appropriate
  2. repair the cracks well. After the cracks to be repaired are dry, start waterproofing.
Q:What is the waterproof layer and the waterproof cushion in the tile roof?
In the tile roof, to wait for the waterproof layer after the dry layer, or prone to the phenomenon of wall off. Waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5-8 Hour) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
Q:Why do the basics of the cushion waterproofing
Raft foundation do not do waterproof mainly depends on the design of the groundwater level considerations, calculated if the floor itself to meet the requirements, you can not do, and not rigid to do
Q:Foam concrete for the roof cushion generally do much bulk ah
First help you correct it, foam concrete used in the roof should be the role of thermal insulation, not as a cushion.
Q:The cushion is usually in the housing which parts
First of all, the foundation refers to the basis of the ground below, the cushion is generally below the base, the base should be there, if the sewage treatment station, then you look at the sewage pool, the bottom of the pool should also have it
Q:Is the raft cushion waterproofing full of the cushion?
As for the bottom of the bar thickness of the protective layer is generally 4cm, but if the basic floor of the concrete label is relatively high, the protective layer can be appropriately reduced.
Q:Is foam concrete suitable for use as a cushion?
And then through the foaming machine pumping system for cast-in-place construction or mold forming, the formation of natural conservation with a large number of closed pores of the new lightweight insulation materials.
Q:Basement floor mattress dry to what degree can do coil waterproof?
First, the basement moisture treatment structure is usually: first in the basement wall outer surface wiping 20mm thick 1: 2 waterproof mortar, basement walls should be used cement mortar masonry, gray seam must be full; and in the basement floor and the first Floor floor is divided into two walls of the level of moisture-proof layer. The outer wall of the basement wall should be tampered with the soil with poor permeability.

1. Manufacturer Overview

Location Shandong,China
Year Established 2003
Annual Output Value US$10 Million - US$50 Million
Main Markets Mid East,Europe,The America,Southeast Asia
Africa ,Oceania ,Mid East
Company Certifications ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Qingdao
Export Percentage 21% - 30%
No.of Employees in Trade Department 10 People
Language Spoken: English;Chinese
b)Factory Information  
Factory Size: Above 80,000 square meters
No. of Production Lines 6
Contract Manufacturing OEM Service Offered;Design Service Offered
Product Price Range High;Average