PE Reinforced Film

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1 Ton m.t.
Supply Capability:
20 Container Per Month m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

PE reinforced film, reinforced poly film,featured by

1) Material:100%PE. two sides laminated.
2) Weight: 100gsm-200gsm
3) UV protected.

 
Color of PE reinforced film:


Transparent, sliver, yellow,green,with natural weaving. 

 

Type of PE reinforced film:


* Finished size: with ropes in hem and aluminum eyelets every 3 feet or customized
* Roll size: width 2m*length 100m /roll.

 

 PE Reinforced Film
 
 
Application of PE reinforced film:
 
 
*GENERAL COVER
*SCAFFOLDING : For the construction buildings, prevrention from dropping
dangerous things, keeping warm, it prevents dust and contaminated dirt from
the inside of the construction buildings. 
*ROOFING : Waterproof from outside and keep away from wetness inside of the roof. 

 

 PE Reinforced Film

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Maintenance time of the cushion on the roof of the building
According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;
Q:Basement cushion waterproof
Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
Q:How to build a fine stone concrete cushion?
The cushion is primarily responsible for the load coming from the surface and passes the load evenly to the structural or base.
Q:Why calculate the amount of time to count a lot of cushion ah
It can be seen, in the preparation of the project budget, the cushion is also a very important sub-head, the amount of its calculation is often measured by m3, the current commonly used materials are concrete, gravel, stone, Stone slag), slag, slag concrete, lime and so on.
Q:Roof waterproof mattress should play the number of centimeters appropriate
  3. The first layer to do flexible waterproof, that is, roof-specific anti-aging waterproof coating.
Q:Why do the basics of the cushion waterproofing
Base cushion waterproofing is not contact with the soil (Ying water) to prevent water into the cushion, but in the cushion and the base of the bottom of the contact, in fact, is the basis of the bottom of the waterproof.
Q:What is the relationship between the cushion and the ring beam?
Cushion is plain concrete or asphalt concrete (for groundwater soil corrosive strong site). Is located below the ground, in order to prevent the foundation or the concrete beam pouring when the excessive loss of water caused by defects set. The purpose is to ensure the quality of concrete, increase the durability of underground components
Q:The top floor made waterproof playing cushion layer of how to do
2. repair the cracks well. After the cracks to be repaired are dry, start waterproofing.
Q:Is it possible to make a waterproof layer
1, to do after the dry do, or prone to the phenomenon of wall skin off.
Q:What is the difference between leveling and cushion?
and only in the construction of the building at the bottom of the building, it is possible to use the relevant level of the cube, After the use of the underlying layer of the building, it is not exempt from the possibility of using leveling layer

1. Manufacturer Overview

Location Shandong,China
Year Established 2003
Annual Output Value US$10 Million - US$50 Million
Main Markets Mid East,Europe,The America,Southeast Asia
Africa ,Oceania ,Mid East
Company Certifications ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Qingdao
Export Percentage 21% - 30%
No.of Employees in Trade Department 10 People
Language Spoken: English;Chinese
b)Factory Information  
Factory Size: Above 80,000 square meters
No. of Production Lines 6
Contract Manufacturing OEM Service Offered;Design Service Offered
Product Price Range High;Average