PE Reinforced Film
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Ton m.t.
- Supply Capability:
- 20 Container Per Month m.t./month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
PE reinforced film, reinforced poly film,featured by
1) Material:100%PE. two sides laminated.
2) Weight: 100gsm-200gsm
3) UV protected.
Color of PE reinforced film:
Transparent, sliver, yellow,green,with natural weaving.
Type of PE reinforced film:
* Finished size: with ropes in hem and aluminum eyelets every 3 feet or customized
* Roll size: width 2m*length 100m /roll.
Application of PE reinforced film:
*GENERAL COVER
*SCAFFOLDING : For the construction buildings, prevrention from dropping
dangerous things, keeping warm, it prevents dust and contaminated dirt from
the inside of the construction buildings.
*ROOFING : Waterproof from outside and keep away from wetness inside of the roof.
dangerous things, keeping warm, it prevents dust and contaminated dirt from
the inside of the construction buildings.
*ROOFING : Waterproof from outside and keep away from wetness inside of the roof.
- Q:Is foam concrete suitable for use as a cushion?
- And then through the foaming machine pumping system for cast-in-place construction or mold forming, the formation of natural conservation with a large number of closed pores of the new lightweight insulation materials.
- Q:Is it possible to make a waterproof layer
- 3, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
- Q:Basement floor mattress dry to what degree can do coil waterproof?
- First, the basement moisture treatment structure is usually: first in the basement wall outer surface wiping 20mm thick 1: 2 waterproof mortar, basement walls should be used cement mortar masonry, gray seam must be full; and in the basement floor and the first Floor floor is divided into two walls of the level of moisture-proof layer. The outer wall of the basement wall should be tampered with the soil with poor permeability.
- Q:What is the relationship between the cushion and the ring beam?
- Ring beam is reinforced concrete. Is to increase the overall wall and overall stiffness, improve the side resistance performance, according to the earthquake or masonry specifications set. There may be in the ground wall, there may be in the underground wall.
- Q:What is the difference between leveling and cushion?
- Cushion, the base material is not divided into materials at the same time, the design will be described. Material is the same concrete, the greater than 20CM calculated basis, less than, equal to 20CM calculated cushion. Leveling layer refers to the original structure due to the existence of uneven or slope and the laying of the base layer, is conducive to laying the surface layer or waterproof, insulation layer. The role is to play a leveling, looking for a slope or enhanced function.
- Q:Can the cushion on the prefabricated board floor be dug?
- Surface layer without steel, do not bear the load, you can dig out But sometimes the prefabricated floor above the surface layer with steel, to bear the load, this can not be removed! To know how thick the cushion, in the local dig about In general, to do leveling layer, can not be directly laid tiles
- Q:Roof waterproof mattress should play the number of centimeters appropriate
- Roof leaking of the construction program: ? 1. Need to remove the previous waterproof, such as paint, coil, etc., if it is to do the mortar waterproof can not be eradicated.
- Q:The cushion is usually in the housing which parts
- There was no other place in the house below
- Q:Maintenance time of the cushion on the roof of the building
- Concrete watering maintenance time: the use of Portland cement, ordinary Portland cement or slag Portland cement mixed with concrete, not less than 7d;
- Q:The roof cushion is waterproof on the slope roof
- and the formation of the ice dam will lead to roof water, water will find the path into the house.
1. Manufacturer Overview |
|
---|---|
Location | Shandong,China |
Year Established | 2003 |
Annual Output Value | US$10 Million - US$50 Million |
Main Markets | Mid East,Europe,The America,Southeast Asia Africa ,Oceania ,Mid East |
Company Certifications | ISO 9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Qingdao |
Export Percentage | 21% - 30% |
No.of Employees in Trade Department | 10 People |
Language Spoken: | English;Chinese |
b)Factory Information | |
Factory Size: | Above 80,000 square meters |
No. of Production Lines | 6 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | High;Average |
Send your message to us
PE Reinforced Film
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Ton m.t.
- Supply Capability:
- 20 Container Per Month m.t./month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords