Grp Reinforced Plastic

Hot Products

FAQ

How to repair and repair the broken hole of GRE glass fiber reinforced plastic pipe?
Place an iron or glass piece of steel on a broken hole like a bicycle tire, then use three oil, two cloth, or five oil three cloth;
Glass fiber reinforced plastic sand pipe backfill 5m, how much kg pressure?
You don't even know the pressure inside.
Mending method for glass fiber reinforced plastic pipe
The method for mending and mending the glass fiber reinforced plastic pipe is hand paste, and the repairing steps are as follows:The stones must be taken away so that the pipes are restored to their original shape.Into the pipe, grinding first and lining the lining. If you can't get into the pipe, polish it from the outside, polish it to the lining, and then make a new lining.Reinforce the structure with a cloth.
Why more and more people choose FRP pipe?
And the price ratio of FRP pipe is not much cheaper, and although the hardness of concrete pipe although FRP pipe to be hard, but the toughness and tensile strength is poor, the pressure is not good, and the cost is expensive, because more and more people use glass steel, and the price is expensive, with longer life.
What is the standard of flange coefficient for FRP ducts?
Can be explained in this way, the flange width is generally 50, on both sides that is 100, flange thickness is calculated as two times the thickness of the pipe, or 200. The duct length is 2000 knots, and 200 is 2000 of the 10%
What kind of epoxy resin and formula do you need for making fiberglass pipe?
By explaining the materials, tools, moulds, renovation and repair, process, structure and various products, the latest development direction, process technology and application of FRP products are described.
How to improve the compressive strength of waste glass fiber reinforced plastic profiles (such as square tubes) should be started with resin, curing agent, glass fiber or other aspects!
Use a high strength resin type;
Is the installation of FRP pipes required qualification?
Generally speaking, the glass steel pipe manufacturers will be installed for shipyard workers training, but if the shipyard did not ask, the training goal is to allow workers to master the skills to install, but they do not grant workers qualification certificate, but some shipyard will require workers engaged in installation with the installation qualification, so manufacturers will end in training workers to master confirmation the installation skills of workers, awarded the class approved qualification certificate. I don't know. Are you clear about that?.