• Mast aerial work platform System 1
  • Mast aerial work platform System 2
  • Mast aerial work platform System 3
  • Mast aerial work platform System 4
  • Mast aerial work platform System 5
Mast aerial work platform

Mast aerial work platform

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
50 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Mast aerial work platform

GTWY series of mast aerial work platform comprisee six differenttypes, with a lift of platform form

6.4 meters to 14.5 meters. They are a new generation of products with nover drsign and made of

new profife alumiumalloy. Due to the high strength of the profile alloy, the deviation and oscillation

if the lifting platform has been reduced to a minimum. The work plarform hs a slim and graceful

appearance, and is able  bring its utmost lift into play in a very small sapce. This makes poossible

an easy, high effiant an safe aeriat work done in such places as hotels, airports, railway stations,

gymnasiums, woekshops and warehouses.

Q:What is the difference between the performance of a truck crane and a crawler crane?
The biggest difference is the difference on the chassisTire type: chassis is the use of car chassis, motor performance is good.
Q:What are the shortcomings of a car crane?
But its high price, is not currently accepted by most domestic users
Q:What is the quota for a car crane (25T)?
Generally remember the cost of a large machine into and out of the transport or transport (need to transport).
Q:What is the process of handling the truck crane?
Transfer fee for the market assessment of 2.5%; photo 20 yuan; copy 12 yuan; driving permit 15 yuan: 114 yuan for the card.
Q:What are the safety procedures for truck cranes?
3, the crane in the lifting process, the site security officer must be responsible for on-site safety management.
Q:What is the reason for the jitter of the crane boom
Exclusion method: the balance valve disintegration cleaning, dredge damping holes.
Q:What are the daily maintenance of the truck crane?
4 into the factory acceptance of equipment management departments to use the equipment sector and the business sector to participate in the equipment out of the equipment inspection, out of the box to meet the requirements of the implementation of the installation, commissioning.
Q:How is the length of the main hoist's main winch and sub-winch wire rope calculated?
According to the car crane factory instructions to configure the main winch and sub-winch the length of the rope;
Q:For hydraulic cranes, why adjust the legs must be carried out without load
With the load will have the force in the leg on the cylinder, the pressure is relatively large, Xuzhou Maske machinery
Q:What are the main parts of the truck crane?
thus becoming the construction industry commonly used one of the construction machinery

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords