LUFFING CRANE TCD6024 WITH PLC control with automatic malfunction judgment

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

The tower crane adopts horizontal arm frame, load is hung in hoisting trolley, and radius is realized through horizontal movement of trolley on arm frame. Compared with luffing jib tower crane, working is steady, installation is convenient, and radius application is wide, which can make hoisting performance be fully exerted, enlarge storing range of construction materials, and make disposal of general construction ichnography be convenient.

 

Safety devices are complete, and there are brakes fixed in each mechanism, which can ensure working safety. There are safety protecting devices like hoisting height restrictor, trolley radius restrictor, moment restrictor, hoisting weight restrictor and swing restrictor, etc. fixed in tower crane.

Driving room is set separately on side with good field of vision and large working space, which create better working environment for operator.

Operation is convenient, and maintaining is simple.

Electric control system adopts domestically advanced PLC control with automatic malfunction judgment, overload and over moment safety chain protection, motor overtime protection, program controller of famous Japan Mitsubishi Company, transducer of Japan Yaskawa Company, relay of OMR Company and contactors manufactured through introducing technology of TE Company, which makes its reliability be much higher than general electric control systems. It is safe and reliable with less malfunctions.
There is no central collector to avoid disadvantages of short circuit and creepage because of damp and make entrance and exit of driver be easy.

 

LUFFING CRANE TCD6024 WITH PLC control with automatic malfunction judgment

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many tons of tower crane QTZ80A lifting?
Lifting torque = mass * radius of gyration (amplitude). That is to say, the bigger the weight is small.
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
Fast Crane = A unload x /hour Slow Crane = B unload y /hour A + B = 8 hours x /hour + y /hour = 8 hours (average rate) average rate = (x + y) / 2 so 8 hours = (x + y) / 2 and x + y = 16 since the slow crane is 12 hours longer, x must be 2 hours, since they will both take 2 hours and the slower crane will take 2 hours plus 12 hours equalling 14 hours. The rate of crane A is 2 hours to unload and the rate of crane B is 14 hours to unload. The average rate for both to unload is 8 hours. There were certain assumptions made to solve this puzzle and it is not clear how they actually operate on the ship while unloading. ~~ The most practical way to unload the ship is *NOT* to use the slower crane since it takes longer for them to work combined, than for the faster crane to work alone !! A tricky but fun question !! :-b
Q:For example, self lifting tower crane mounted to 10 meters or 2 floor use. How do you install the third floor now? Is it necessary to remove the crane?. Then add the length of the steel frame on the base seat, and then install the crane above him If so, then 2 cranes are needed. But how is another crane installed?Ask you experts on the construction site of self lifting tower cranes how to install?. Do you use hydraulic jacks like car jacks?
1, since it is self lifting, as the name suggests, is to rely on their own strength, without other cranes can rise.2, it has a special elevated section, a hydraulic device, the upper section rises, the middle empty time section, with his arm to be added to the festival hanging near the artificial it fixed, so that a section of the rising of the.3 crane refers to a certain range of vertical lifting and horizontal moving heavy lifting machines. Also called crane. At present the Guangdong SHUNFA hoisting lifting equipment limited company has gradually cancelled lifting driving function. The main features are: the tyre crane driving cab and lifting control room, is be made one crawler crane (crawler crane) evolved, the walking tracks and walking mechanism to support part of the tire chassis, overcome the crawler crane (crane) damage caused by the defects of trackboard pavement, belongs to the material handling machinery. Lifting equipment is characterized by intermittent exercise to do some work, namely the corresponding mechanism, taking in a working cycle of transport and unloading action is the turn of the job, the crane in the market development and the use of more and more widely. Because no leg lifting and lifting driving often appear some accident, driving faster than the crawler crane (crane); stable operation, large lifting capacity, lifting, walking road, but must ensure smooth solid tire pressure to meet the requirements, hanging from the ground not more than 50CM in a certain range is prohibited; with a load of long distance. In order to ensure the safety of operation, the lifting operations are not allowed to be carried out at home.
Q:quick answer or i'll delete it!
spongebob gives me a headache.
Q:i read this comment on youtube about people making 1000 paper cranes for japan is this a real thing like can i make paper cranes and mail them to some place if anyone knows the details you would be helping me out because i already started making paper cranes and its such a small but beautiful thing plz help
i know this big organisation in Japan and some of my frineds live there... if you are interested, I can give you the address and more details...etc
Q:what is the proper way to fold a paper crane?
I would go to a library or a book store and find a book on origami.
Q:How much height should tower crane work at M?
High building one meter high voltage line to keep the relevant national standard to ensure the forearm and the adjacent adjacent tower crane tower crane standard section has a safe distance of 2 meters, big boom high high tower mechanism area covering more than one meter, the end will need to receive from the nearest cab hook.
Q:Why are electromagnets on junkyard cranes generally circular in shape?
Blow a bubble with gum and you will realize the most efficient shape in nature. Sphere or circle. Whether it is a crane or the wheel, a helpful shape to be sure. The engineer to be has it right.
Q:A crane lifts a 1265 kg steel beam vertically 26 m, it then stops and swings the beam 3 m horizontally into a position where the welders can secure it into its proper position. What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
Q:A man said to the universe:“Sir, I exist!“However,” replied the universe,“The fact has not created in meA sense of obligation.”
It's recognizes no one.... I'm just guessing.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
Hot Searches
客服
live chat