LDPE Geomembrane

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

HDPE Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer.

 Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer. It is mainly divided into LD PE geomembrane, , HDPE geomembrane, EVA geomembrance and all kinds of composite geomembrane.
  1. Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .

  2. Excellent environmental stress resistant cracking performance.

  3. Excellent performance of chemical erosion resistance.

  4. Big scope of application temperature and long service life .

  5. Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction project


Items

Index

LDPE

HDPE -1

HDPE -2

Tensile strength MPa

≥14

≥17

≥25

Elongation at break%

≥400

≥450

≥550

Right angle tearing strengthN/mm

≥50

≥80

≥110

Carbon soot quantity

≥2

Environmental stress resistant cracking performance



≥1500

Oxidation induction time at 200min



≥20

Permeability coefficient of vapor(g·cm/cm2·s·pa)

≤1.0x

Impact degradation performance at -70

Pass

dimension stability%

±3


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Basement floor mattress dry to what degree can do coil waterproof?
Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
Q:How to build a fine stone concrete cushion?
The cushion is primarily responsible for the load coming from the surface and passes the load evenly to the structural or base.
Q:Can the cushion on the prefabricated board floor be dug?
Prefabricated board floor layer of cement layer is not called the cushion, should be called leveling layer, this layer can be removed, but be careful not to damage the prefabricated plate.
Q:Roof waterproof mattress should play the number of centimeters appropriate
  3. The first layer to do flexible waterproof, that is, roof-specific anti-aging waterproof coating.
Q:Why do the basics of the cushion waterproofing
The general basis of the foundation, the bar base is not necessary to do, like a raft in the basement, it is necessary to prevent the water from dipping into the basement (so the basement design may have to do anti-floating calculations). Assuming (just suppose) the raft can easily turn over, then we do waterproof (like roof) directly on it, not waterproof on the cushion.
Q:The top floor made waterproof playing cushion layer of how to do
Roof leaking of the construction program:   1. Need to remove the previous waterproof, such as paint, coil, etc., if it is to do the mortar waterproof can not be eradicated.
Q:What is the difference between leveling and cushion?
Building floor cushion is the structure layer below the grass-roots level. Cushion as the name suggests is the structure of the liner layer, mainly plays the role of the back cover. Cushion should be noted with the basic distinction. It is easy to confuse the two engineering concepts.
Q:Cushion, waterproof layer construction to do what information
4, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
Q:Is the raft cushion waterproofing full of the cushion?
As for the bottom of the bar thickness of the protective layer is generally 4cm, but if the basic floor of the concrete label is relatively high, the protective layer can be appropriately reduced.
Q:Do you need a cushion on the ground floor?
First to ask the use of your huts, there is the strength of the huts. If you just get a little, then a few years into a dangerous floor, then calculate the ground, walls, roof (slope roof) area, doors and windows can be used as a wood plate loss.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range