LDPE Geomembrane
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
HDPE Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer.
Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .
Excellent environmental stress resistant cracking performance.
Excellent performance of chemical erosion resistance.
Big scope of application temperature and long service life .
Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction project
Items | Index | ||
LDPE | HDPE -1 | HDPE -2 | |
Tensile strength MPa | ≥14 | ≥17 | ≥25 |
Elongation at break% | ≥400 | ≥450 | ≥550 |
Right angle tearing strengthN/mm | ≥50 | ≥80 | ≥110 |
Carbon soot quantity | ≥2 | ||
Environmental stress resistant cracking performance | ≥1500 | ||
Oxidation induction time at 200min | ≥20 | ||
Permeability coefficient of vapor(g·cm/cm2·s·pa) | ≤1.0x | ||
Impact degradation performance at -70 | Pass | ||
dimension stability% | ±3 |
- Q: The cushion is usually in the housing which parts
- Cushion is generally at the base, looking for the use.
- Q: Roof waterproof mattress should play the number of centimeters appropriate
- Roof waterproofing can not use a single waterproof material, must be rigid and flexible combination of construction, flexible waterproof stretch is good, a little bit of settlement or deformation will not damage the waterproof layer. Rigid waterproof (ie mortar waterproofing agent) waterproof at the same time, can play a protective role, waterproof layer is not easy to be destroyed.
- Q: Do you need a cushion for roof waterproofing?
- There is no "cushion" on the roof, and there is a concrete cushion under the basement floor. What you said may be leveling, is the base of the waterproof layer.
- Q: When the cushion is used, the thickness of the protective layer is not less than ()
- The purpose of the protection, one is to avoid man-made mechanical damage; the second is to prevent climate, UV aging, to extend the service life; three in the planting roof protection layer is to prevent plant roots puncture, different effects using different methods of protection.
- Q: The top floor made waterproof playing cushion layer of how to do
- Roof waterproofing can not use a single waterproof material, must be rigid and flexible combination of construction, flexible waterproof stretch is good, a little bit of settlement or deformation will not damage the waterproof layer. Rigid waterproof (ie mortar waterproofing agent) waterproof at the same time, can play a protective role, waterproof layer is not easy to be destroyed.
- Q: Basement cushion waterproof
- Second, when the design of the highest groundwater level above the bottom of the basement floor, you must do waterproofing. As the waterproof waterproof effect is good, so the application of more. Internal waterproofing is generally used for repair works.
- Q: Can the floor tiles be removed from the cement mats on the prefabricated board floor?
- Prefabricated board surface is best to do some cement mortar cushion, can prevent the decoration of the water generated to the downstairs.
- Q: Is foam concrete suitable for use as a cushion?
- Inappropriate. Bubble concrete is a new type of energy-saving and environmentally friendly building materials, which are widely used in wall materials, but there are still some defects, such as low strength, cracking, water absorption, as the cushion of its strength is not enough standard.
- Q: What is the waterproof layer and the waterproof cushion in the tile roof?
- In the tile roof, to wait for the waterproof layer after the dry layer, or prone to the phenomenon of wall off. Waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5-8 Hour) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
- Q: Maintenance time of the cushion on the roof of the building
- According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;
Send your message to us
LDPE Geomembrane
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords