• Laminated Flex Banner System 1
  • Laminated Flex Banner System 2
  • Laminated Flex Banner System 3
Laminated Flex Banner

Laminated Flex Banner

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
5000 Meter m²
Supply Capability:
20 Container Per Month m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Laminated Flex Banner

 

 

Specification of Laminated Flex Banner

 

 

Weight:340gsm,440gsm

Yarn count:200D*300D,300D*500D,500D*500D,9X9,18*12 

Width:1.02~3.20M

Suit for solvent base inks

 

Features of Laminated Flex Banner

 

 

1. Glossy and Matt style available

 2. Weather resistant (UV, rain, typhoon and frost)

 3. White substrate for wide format digital printing

 4. Applicable to Vutek, Scitex, Nur, Infinity, Flora printers

 

Application of Laminated Flex Banner

 

 

 1.Billboard (frontlit)

  2. Exhibition booth decoration

 3. Displays (indoor and outdoor)

 4. Building murals and instore displays

 

 

 

 

Q: Do you need a cushion on the ground floor?
Chalet recommended to do sloping roof, the lowest point suggested 2.4. Talk about the ground, the roof, the wall area divided by the length of your board length and width of the area can be calculated on the amount of it!
Q: Can the cushion on the prefabricated board floor be dug?
Prefabricated board floor layer of cement layer is not called the cushion, should be called leveling layer, this layer can be removed, but be careful not to damage the prefabricated plate.
Q: Roof waterproof mattress should play the number of centimeters appropriate
? 3. The first layer to do flexible waterproof, that is, roof-specific anti-aging waterproof coating.
Q: The roof cushion is waterproof on the slope roof
When the moisture generated by the ice dam into the external walls of the gap, the walls and insulation layer will become damp, which is the ideal environment for the breeding of mold.
Q: Basement cushion waterproof
Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
Q: Cushion, waterproof layer construction to do what information
1, the cushion to do template inspection batch information. Waterproof to do waterproof shelter, waterproof inspection batch, waterproof detail structure.
Q: Is foam concrete suitable for use as a cushion?
Inappropriate. Bubble concrete is a new type of energy-saving and environmentally friendly building materials, which are widely used in wall materials, but there are still some defects, such as low strength, cracking, water absorption, as the cushion of its strength is not enough standard.
Q: How to build a fine stone concrete cushion?
Reduce ground cracking, plus steel mesh. Reinforced mesh, should be placed in the middle of the concrete, because the protective layer of concrete thick Fang generally only 5CM thickness, so the middle is the best.
Q: Why calculate the amount of time to count a lot of cushion ah
? In the municipal engineering, the bedding layer is a structural layer between the grassroots and the soil foundation. When the soil temperature is bad, the water temperature of the soil is improved and the water stability and frost resistance of the pavement structure are improved. Diffusible load to reduce soil deformation.
Q: Maintenance time of the cushion on the roof of the building
According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;
LILAC produces PVC laminated coating (mesh fabric), covering cloth, soft ads fabrics, air tightness yacht cloth, trampoline cloth, swimming pool cloth, sun cloth, case mesh fabrics, mesh fabrics for building packaging, PVC ceiling soft membrane, air-filled toy membrane, floor surface membrane, etc., which sell well in hundreds of countries. With warm attitude, we provide you with the best products and service. Welcome to visit and support us!

1. Manufacturer Overview

Location Zhejiang,China
Year Established 2002
Annual Output Value Above US$ 10 Million
Main Markets 30% South America
20% Southeast Asia
20% Africa
10% Mid East
10% Eastern Asia
10% Central America
Company Certifications ISO 9001:2008;CE

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Shanghai
Export Percentage 21% - 30%
No.of Employees in Trade Department 21-50 People
Language Spoken: English; Chinese
b) Factory Information
Factory Size: 30,000-50,000 square meters
No. of Production Lines Above10
Contract Manufacturing OEM Service Offered; Design Service Offered
Product Price Range High; Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords