Kwikstage Scaffold Internal Corner Frame
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Type: | Surface: | Height: | |||
Pipe Size: | Accessories: | Lock Pin Size: | |||
Style: | Plate: | Certification: |
Packaging & Delivery
Packaging Detail: | Bundle packing, suitable for sea transfer. |
Delivery Detail: | Prompt |
Specifications
H frame scaffolding system
size: Tailor Mading
Height: 1219mm,1700mm,1930mm
Manufacturer
Best price and service
Q235 frame scaffolding
H frame scaffolding system is for small to medium sized projects, including small or medium sized new build, maintenance, roofing, painting and cladding. They are time efficient, safe and stable.
1.Material:Q235 Q255 Q345
2.Variety:Walk through type & Ladder type
3.Type: H frame scaffolding system
4.Thickness of the tube:3mm 3.2mm 3.25mm 3.5mm 4mm or customize
5.Surface treatment:HDG/Galvanized/Painted,ect.
6.Color:silver, red, blue, yellow, green or customize
7.Certificate:ISO9001:2000 ISO9001:2008
8.Standard:EN74 BS1139 AS1576
9.Advantage:easy erection, strong loading capacity, safety and stability
10.Main components: frame, catwalk, joint pin, cross brace, base jack, u-head jack and caster.
11.Usage: Our products are used widely in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building etc
frame scaffolding is light duty, easy to erect and walk through, wide applications for both inside and outside constructions.
A complete set usually includes 2 PCS of H frames, 2 pairs of cross braces and 4 PCS of joint pins.
Components:
Pre-galvanized tube, Joint Pin, Lock Pin, Cross Brace, Base Jack or Universal Wheel.
STD/ Ledger(P.G.)mm | Size (mm) | KG | STD/ Ledger(H.D.G.)mm | Size (mm) | kg |
Φ42*2.2/Φ42*2.0 | 1930*1219 | 15.05 | Φ42*2.2/Φ42*2 | 1930*1219 | 15.05 |
Φ42*2.0/Φ42*2.0 | 1930*1219 | 14.33 | Φ42*2/Φ42*2 | 1930*1219 | 14.33 |
Φ42*2.1/Φ42*2 | 1930*1219 | 14.43 | Φ42*2.1/Φ42*2 | 1930*1219 | 14.43 |
Φ42*2.2/Φ42*2 | 1700*1219 | 13.51 | Φ42*2.2/Φ42*2 | 1700*1219 | 13.51 |
Φ42*2/Φ42*2 | 1700*1219 | 12.88 | Φ42*2/Φ42*2 | 1700*1219 | 12.88 |
Φ42*2.1/Φ42*2 | 1700*1219 | 13.20 | Φ42*2.1/Φ42*2 | 1700*1219 | 13.20 |
Φ42*2.2/Φ42*2 | 1524*1219 | 12.21 | Φ42*2.2/Φ42*2 | 1524*1219 | 12.21 |
Φ42*2/Φ42*2 | 1524*1219 | 11.64 | Φ42*2/Φ42*2 | 1524*1219 | 11.64 |
Φ42*2.1/Φ42*2 | 1524*1219 | 12.00 | Φ42*2.1/Φ42*2 | 1524*1219 | 12.00 |
Φ42*2.2/Φ42*2 | 914*1219 | 9.56 | Φ42*2.2/Φ42*2 | 914*1219 | 9.56 |
Φ42*2.2/Φ42*2 | 1930**914 | 14.19 | Φ42*2.2/Φ42*2 | 1930*914 | 14.19 |
Φ42*2/Φ42*2 | 1930**914 | 13.47 | Φ42*2/Φ42*2 | 1930*914 | 13.47 |
Φ42*2.2/Φ42*2 | 1700*914 | 12.65 | Φ42*2.2/Φ42*2 | 1700*914 | 12.65 |
Φ42*2/Φ42*2 | 1700*914 | 12.02 | Φ42*2/Φ42*2 | 1700*914 | 12.02 |
Φ42*2.2/Φ42*2 | 1524*914 | 11.60 | Φ42*2.2/Φ42*2 | 1524*914 | 11.60 |
Φ42*2/Φ42*2 | 1524*914 | 11.03 | Φ42*2/Φ42*2 | 1524*914 | 11.03 |
- Q:I am looking for a trainee scaffolding job?
- If you're under 25, you're better off talking to the CITB, they'll find you a course at college and somewhere to work.Otherwise just try phoning a few local scaffolding firms, that's yer best bet, there's a building boom on at the mo
- Q:what is the name of the lift cart to get to the 2nd story from the exterior like for example to clean windows instead of using a ladder its like a small car with a bed at the top and then you step inside and it lifts you up . or what other electronic card do you recommend other than the regular home depo scaffold
- do u mean a cherry picker or a scissor lift, diffrence being a cherry picker you can take it on the roof and move about the roof, scissor lift will take u up 2 the roof then you just walk off scissor lift on 2 roof. i done my courses 4 these 2 the sciossor lift is easier 2 learn but the cherry picker get u all over the roof 2 an extent. hope ive helped pal.
- Q:Your opinion on Industrial/Scaffold Piercings?
- Love them. I have one on my left ear..
- Q:A. from peersB. nonverbalC. done in informal settingsD base on the level of the learner's needs
- I'm not sure if you are trying to answer a question on an exam or from homework. Really you shouldn't be cheating. If this is a take-home exam then it's ok. I will help you to solve this question. Think about which of these would ALWAYS be present in scaffolding. Do peers have to be around for scaffolding to occur? Are no words to be spoken? Can it only be done in informal settings? Is it always based upon the needs of the learner? One of these is correct and if you look at it this way I'm sure you'll see the right answer. Although, the wording does seem confusing at first:)
- Q:So i got my peircing yesterday and it was swollen and now its bruised. I know thats normal but today is day 2 and it still is very sore and is throbbing. I cleaned it twice yesterday and 4 times today by soaking my ear in salt water. But the ear that i got pierced looks very different from the other ear that i didnt pierce. My right ear is swollen even outside of the area i got pierce, in between the fistulas. And on the back of my ear. This is the first piercing ive gotten outside of my first lobe piercing 8 years ago. I didnt sleep on it. If someone can tell me if its infected I'd appreciate it.
- you got the piercing yesterday, swelling pain and bleeding are all normal and expected. It is not infected unless it is oozing yellow or green puss, is very red, very painful, and radiating heat. If this isn't happening, then it isn't infected. Over cleaning it can cause an infection, so you should only clean it 2 - 3 times a day with sea salt soaks. It looks normal, it looks a bit swollen, but that is very normal because it is a fresh piercing. it takes 6 - 12 months for this type of piercing to heal.
- Q:I got a scaffold piercing done on saturday. It's now thursday and it basically hasn't stopped bleeding since..for the first day it was just a bit crusty with dried blood but after that it has been trickling constantly and at night it really goes to town! I end up waking up at like 3 every morning having to clean it up because it's dribbled down my face and completely drowned my ear..during the day the blood is quite thin but constant and at night its really thick and grossI'm pretty sure I haven't been knocking it...I did used to snag it quite a bit before so I thought that was why but i've been really careful recently and nothings changedThe piercing itself looks epic so I don't want to have to take it out...especially since i paid ?35 quid for it. Any suggestions on how to stop the bleeding?..or what's the dealeo with it in general?I got it done at Asgard by the way..good reliable place
- you have to be doing something to is in your sleep that is causing the bleeding at night. just try to sleep on the other side. not much more you can do. it's very fresh still and this shouldn't last long
- Q:how much ?
- It depends where you go... But if you go to a decent body piercer, I'd say no less than ?20 and no more than ?40.
- Q:Do you have a change in the law for scaffolding used outdoors?
- Does ... WHO have a change in the law? What law? Where are you located? Such laws are generally LOCAL, and so you'd need to check with the building officer at City Hall.
- Q:What ever happened to scaffold matches?
- They dont want more people to die :P
- Q:If you were Vince McMahon, would you hire New Jack to wrestle Cena in a scaffold match?
- It would be an insane match but Cena would not be able to pull that one off.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Kwikstage Scaffold Internal Corner Frame
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords