Kwikstage Scaffolding System Standard

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Hebei China (Mainland)


Model Number:
XM-FS
Product:
Steel Shoring System Kwikstage Scaffolding Supporting Plywood
Color:
Grey, Yellow
Certificate:
ISO9001, ISO14001, ISO18001
Lacquer:
Electrophoretic Paint
Material:
Q235 Steel Pipe
Function:
Support The Plywood For Concrete Slabs
Load Bearing:
2 to 3 Tons Per Area






1.Specification

Slab formwork

Length

(m)

Wide

(mm)

Height

(mm)

Thickness

(mm)

Main-beam

2.68-4.39

65

70

2

2.28-3.68

65

70

2

1.77-2.88

65

70

2

1.17-1.78

65

70

2

Sub-beam

1.15

60

50

2

0.8

60

50

2

0.4

60

50

2

 

Post Supporting System

Length

(m)

Diameter

(mm)

Thickness

(mm)

Vertical Prop

2.55

48

3

1.95

48

3

1.35

48

3

1.05

48

3

0.75

48

3

Horizonal Prop

1.22

48

3

0.87

48

3

0.47

48

3

U-head Screws

0.4

40

3

0.5

40

3

0.6

40

3

0.7

40

3

2.Characteristics…………………………………………………

Telescoping scaffolding system

1)Slab formwork system

1.Make up of adjustable main-beam and different sizes of sub-beam;

2.Different sizes, suitable for any structure buildings b working together;

3.Rigorous quality control;

4.Made of Cold Rolled Steel, lighter and stronger;

5.Using level: 10KGS per m2;

6.No need timbers, reused for about 300 times;

7.Approved by ISO9001, ISO18001 and ISO14001;

8..Specifications designed according to the regular size of the plywood.

2)Post supporting system

1.Easy operation, working under correct direction will be competent for the work;

2.Free size, suitable for any height by connecting different size vertical props together;

3.Make the construction site neat and clear, improve the project quality.

4.Working load:450kg(max);

5.Approved by ISO9001, ISO18001 and ISO14001;

6.The life cycle is 300 times;

7.Quantity of per m2 is 18kg.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is the scaffolding ear piercing worth it? Any problems? Advice please.?
It's a fab that will soon pass..What wont pass are all the hole's in your ears...and head...
Q:suggestion for cheap scaffolding to reach eaves for sand and paint?
When I painted for a living, I had two options. One way was to use two aluminum extension ladders with jacks mounted on both of them and a walk board strung between them. The other way is to use 2 tall wooden ladders facing each other and run a 1 X 12 between them to stand on. There is always the park a pipck up truck under the eave and put a ladder in the bed of the truck.
Q:Scaffold requirements? Anyone have any knowledge on scaffolding?
No - do not remove the siding as you will not find any studs there. Siding is generally attached to wood frame houses - slap boards - but not studs and that wouldn't be secure enough anyway. Hopefully the house has a roof overhang - with rafters. You can use 2x4s x 8 feet bolted to your scaffolding and tied into rafters with a 6 inch bolt. Be gentle on the chimney - do not brute force it. My guess is that its very weak (mortar wise) and that the worse is going to be the sand and weak mortar joints. Be sure to use tarps around the foliage - to avoid damage to the ground. Start at the very top and work your way down.
Q:I am looking for a trainee scaffolding job?
If you're under 25, you're better off talking to the CITB, they'll find you a course at college and somewhere to work.Otherwise just try phoning a few local scaffolding firms, that's yer best bet, there's a building boom on at the mo
Q:how do i clean my scaffold piercing?
It depends which piercing you have. Belly button piercing?? Ears? Nose? Tongue? There are different techniques depends on where about your piercing is.
Q:A window washer's scaffold is 12.0 ft long and weighing 75.0 lb is suspended from each end. One washer weighs?
Let the two upward forces be F1 and F2. F1 + F2 = 155 + 75 + X. Taking moment about the end near the washer of X lb 4X + 6*75 + 12* 155 = 12.*200 X = 22.5 lb ==================================
Q:Can you get fake scaffolding piercings?
Nope you can't get fake jewellery because of the placement of the piercing. There is no way to fake it, sorry, you'll just have to wait until you're old enough to go and have it done without your parents consent and need for their approval.
Q:Scaffold piercing question?? Please help?
GO BACK TO YOUR PIERCER. or just dip the area on warm water with sea salt.
Q:Scaffold/Industrial Piercing Help.. Infected?
Its only been a month since it was pierced this is completely normal. Cartilage piercings can take up to a year and sometimes more to heal. Sounds to be like the piercing is just irritated. Have you been playing with it a lot? If so stop. Do not touch it unless you are cleaning it. Its a pretty fresh piercing and the more you play with it the more sore and irritated it will get. It could also lead to an infection. Just relax and continue to clean 2-3 times a day using a mild soap and water or using sea sale soaks. Don't use any alcohol, peroxide or polyspron.
Q:Scaffold piercing won't stop bleeding?
Did you attempt peroxide? placed some on a cotton ball and sparkling around the piercing. If this does not flow away interior of two days and the bleeding persists your physique could be rejecting the steel out of your epidermis. this could reason the peircing to ultimately migrate out. flow returned to the piercer and notice what they say.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range