• Kwikstage Scaffolding Formwork  Steel System 1
Kwikstage Scaffolding Formwork  Steel

Kwikstage Scaffolding Formwork Steel

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Jiangsu China (Mainland)


Model Number:
kwikstage Scaffolding
Type:
scaffolding system
Material:
Q235/225/345
Surface:
Paint,Galvanized,HDG
Color:
silver,yellow,black or as your request
Size:
48.3mm
Length:
0.5/1.0/1.5/2.0/2.5/3.0M
Thickness:
2.75/3.0/3.2/3.25/4.0mm
Standard:
EN74, BS1139
kwikstage Scaffolding:
kwikstage Scaffolding system standard
Stable:
durable

Packaging & Delivery

Packaging Detail:in bulk or pallet according to customer's requirement kwikstage Scaffolding system standard
Delivery Detail:no more than 15days

Specifications

Best price kwikstage scafffolding
Good bearing capacity .
Used time long .
Very good stability .
Covenient to transport

Kwikstage system

1.have our own factory
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle

Our capability

Produce Equipment: 4 forged production lines,2assembly line,2 bolish line ,1sets 400 punch   press,3sets 300t punch press

Produce Technology: stamping/pressing/forging;

Produce Capacity: 500 tons/month

Output: 3000 pcs/day couplers,3000pcs steel plank


Specification

1.Standard:

Thickness(mm):48.3*2.75 / 3.0 / 3.2 / 3.75 / 4.0

Length(mm):500/1000/1500/2000/2500/3000/3500/4000

2.Ledger:

  Thickness(mm): 48.3*2.75 / 3.0 / 3.2 / 3.75 / 4.0

  Length(mm):1200/1800/2400

3.Transom:

 50mm*50mm*5mm thickness steel angle  

Length(mm):600/800/1200/1800

4.Brace(diagonal)

  size:48.3*2.5mm thickness steel tube   Length(mm): 1830/2750/3530/3660

5.Bace Jack:

   Solid Base Jack:38mm(diameter)*650mm     (length)or as your request

   Hollow Base Jack: 38mm(diameter)*4/4.5/5/6mm(thickness) or as your request

size for reference

Kwikstage ItemsLength(mm)Steel GradeTheoretical Weight(kg)

Standard w/o spigot3000Q23517.5
Standard w/o spigot2500Q23514.5
Standard w/o spigot2000Q23511.5
Standard w/o spigot1500Q2358.5
Standard w/o spigot1000Q2356
Standard w/o spigot500Q2352
Ledger 3.2mm2400Q2359.26
Ledger 3.2mm1800Q2357
Ledger 3.2mm1200Q2355
Ledger 3.2mm760Q2354.3
Transom 5.0mm2400Q23522
Transom 5.0mm1800Q23513.5
Transom 5.0mm1200Q2359.6
Transom 5.0mm1000Q2358
Transom 5.0mm760Q2356
Ladder Access Tran2400Q23511.6
Ladder Access Tran1800Q23515.3
Ladder Access Tran1200Q23524
3 Board Stage Bracket3000Q2359
2 Board Stage Bracket2000Q2356
1 Board Stage Bracket1000Q2352.5
Tie Bar2400Q2357
Tie Bar1800Q2355
Tie Bar1200Q2353
Tie Bar760Q2352.1
Double Coupler
Q2351.25
Swivel Coupler
Q2351.25
51mm Double Coupler
Q2351.3
51mm Swivel Coupler
Q2351.3
Putlog/Single Coupler
Q2351
Girder Gravelock Coupler
Q2351.5


Q:I am filling out a job application it is asking me in to put my employment history and my job title was a Scaffold Helper. Do I capitalize this?
Yeah, I would capitalize it because it's a title.
Q:I need help in solving this.And I need to know how.Please help and thank you.
Velocity = (g*t) m/sec. (9.8 x 4) = 39.2m/sec.
Q:A scaffold of mass 51 kg and length 6.0 m is supported in a horizontal position by a vertical cable at each end. A window washer of mass 87 kg stands at a point 1.8 m from one end.(a) What is the tension in the cable closer to the painter? (b) What is the tension in the cable further from the painter?
m? = mass of the scaffold = 51 kg m? = mass of the painter = 87 kg L = length of the scaffold = 6 m d = distance between the painter and end of the scaffold = 1.8 m g = acceleration by gravity = 9.8 m/s? Using the end of the scaffold that is the furthest away from the painter as pivot point, you can find the tension in the cable that is closest to the painter. m?×g×L/2 + m?×g×(L - d) = Tclose×L Tclose = 846.72 N < - - - - - - - - - - - - - - - - - answer a Using the end of the scaffold that is closest to the painter as pivot point, you can find the tension in the cable that is the furthest away from the painter. m?×g×L/2 + m?×g×d = Tfar×L Tfar = 505.68 N < - - - - - - - - - - - - - - - - - - - answer b Check: Tclose + Tfar = (m? + m?)×g (846.72 N) + (505.68) = ((51 kg) + (87 kg))×(9.8 m/s?) . . . . ? 1352.4 N = 1352.4 N . . . . . . . . . . . . . . . . . . . . . . . . . . . .! Seems OK
Q:I have been pierced for around 3 months beginning to have a few problems with it which are starting to worry me. Firstly bumps have appeared on each hole which my piercer said were scars that should heal within 4 weeks is this true? my bottom hole has got some loose skin beside it which bleeds most times that I clean it,why is that there,is it normal? Over all,the piercing does not look very nice to look at with all this going on. Help?
The bumps are most likely keliods, most of the time they do not go away. The skin around the ball in normal I still get it every now and again an I have had mine for two years. I highly suggest jojoba oil, it's on the pricey side but I swear by it for all my metal gear.
Q:i know it varies building to building, but general what is a builder going to pay for any high rise over 30 stories. also, how do scaffolding companies typically charge for their scaffolding and services?
What part of the world, what time of year, what footprint of building, what time period of working on building? Many Asian countries erect exterior scaffolds of bamboo. European and western hemisphere countries do it with pipe and board.
Q:I need to reach my very high ceiling. Where can I rent scaffolding?
why don't you google scaffold rental in your area...
Q:in construction industry
topically scaffolding are in bucks of 6 feet toprails are at 42 inches off the platformon of each leval which also has a toerail at platform leval to pervent something from slideing off a midrail between the two.This system of 3 rails continues on every leval regardless of how high the scaffelding is bult. First platform is at 6 ft. first toprail is 9ft 6 in. Workers must be tied off anytime there over 6 feet.
Q:61245(base six) divided by 354(base six)
It okorder I hope that it helps you in something, bye-bye! =).
Q:please help me out i have to write a paper on this including explanations and examples and quotes from the text
Dimmesdale atones by admitting that he was a party to the adultery.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords