cup ock scaffolding steel

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specification

NameSize(mm)MaterialSurface finishedLENGTH(mm)
rosettesφ48Cast steel/stampingPainted/Galvanized
Ledger bar endφ48Cast steelPainted/Galvanized
Diagonals bar endφ48Cast steelPainted/Galvanized
Ledger bar48*3--3.25Q235Painted/Galvanized400, 600, 800, 1000, 1200
Diagonals bar48*3--3.25Q235Painted/Galvanized1000, 1500, 1800, 2000, 2500, 2800, 3000


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it possible to have a scaffold piercing with a helix piercing on one ear?
This is a tad of a hard question to answer with no picture, but I would tentatively say, there should be no problem. Barring any complication- bad placement of the previous piercing, insufficient anatomy, bad scar tissue, or the like- adding several piercings to one area of the ear is generally not difficult. As for pain, it is very personal, but it can be very painful for some people. I have had over 15 piercings done, and would rate this one as painful because of how long it takes to heal. They take many months, often as much as 6 months to a year, and are very very sensitive for a long time. It will take a while before accidental bashes don't hurt, or you can sleep on it safely. Be prepared to wait it out. But take heart- mine took a year to heal, but now, I can mash the bar around and such and there is no pain. As long as the holes are pierced correctly and heal well, they will eventually get better.
Q:What are the different types of steel tubular scaffold with bowl buckle
(2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The entire frame cannibalize speed is 3 ~ 5 times faster than conventional, faster effort to fight demolition, workers with a hammer to complete all assignments, to avoid the inconvenience caused by bolt operation; (3) with strong: the main components are the ordinary steel tubular scaffolding steel pipe, steel pipe connecting fastener with general availability in general, strong.
Q:Steel pipe scaffold scaffolding components which are composed of
Bowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".2.2 according to the vertical and horizontal transmission force between the vertical and horizontal1) the frictional force acting on the contact surface. That is, the friction force at the contact surface of the joint is pressed to support the load of the cross bar and is transmitted to the vertical rod;2) welding force. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission. This method is more common in the horizontal bar placed in the top of the scaffolding;4) shear force of pin. That is to say, the connecting rod and the hole of the vertical rod are connected by the pin rod through the vertical connecting plate of the transverse rod to realize the double side shear action of the connecting rod and the pin rod. This method is rarely seen in the connection between the rod and the vertical rod.
Q:Can you shorten the distance of the bowl buckle scaffold?
Must be 120 steps according to the distance control, set up close to the bottom plate beam always available for 60 or 90 bars and the adjustable bracket is adjusted.
Q:A 5.0-m long scaffold is 80 N. It hangs from wires at each end. A 200-N box sits 1.0 m from left. Tension?
The sum of the two tensions must equal the total weight supported so Tl + Tr = Wb + Ws = 200 + 80 where Wb is the weight of the box and Ws the weight of the scaffold. That's enough to choose the right answer, but to actually compute the tensions, you also need the torque equation. The sum of the torques around the left end of the scaffold must be 0 since the scaffold isn't moving. That means: 0 = (1.0) Wb + (2.5) Ws - (5.0) Tr where 1.0, the 2.5, and the 5.0 are the radii corresponding to the forces. So you can solve for Tr and then Tl.
Q:Whom does Hester recognize in the crowd as she stands on the scaffold?
her husband, he has been in England while she was in America for a year or 2 can't remember; I think she thought he was dead or not coming cannot remember. It frightens her because she has a kid that cannot be his.
Q:Who can give me a bowl buckle scaffold acceptance form?
The cuplock scaffold erection of a frame body, to inspect all the connecting bowl tightening situation.
Q:How long does it take to put up scaffolding?
all depends how many guys are putting up the scaffold but I would say more than two hours
Q:Bowl buckle scaffold from the machine to pull out the upper and lower bowl
You can refer to the "construction of bowl buckle scaffold safety technical specifications" JGJ 166-2008
Q:Can the horizontal bar of the bowl buckle scaffold be oblique to the horizontal position of the vertical bar
The utility model can not form a parallelogram, and the joint of the bowl buckle and the horizontal rod is fixed by the joint.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range