CMAX TC5516, Applicable for Construction of Different Industrial, Commercial, Office
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Brief introduction of TC5516
CNBM offers complete product portfolio, and the products are widely used in building houses, highways, bridges, water conservancy projects, etc. Featuring advanced technology, safe and reliable quality, timely and professional services, Huba products are very popular among customers both at home and abroad
Detail of CMAX TC5516
Feature:Tower Crane
Condition:New
Model Number:TC5516
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of CMAX TC5516
Our tower crane is wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Specification of CMAX TC5516
Free standing height (m) | 44 | ||
Max height with attachment (m) | 150 | ||
Working range can be adjusted(m) | 45、50、55 | ||
Min working range(m) | 2.5 | ||
Max lifting capacity(t) | 8 | ||
Tip load @ 50m(t) | 1.6 | ||
Hoist mechanism | Falls | 2 | 4 |
Lifting capacity(t) | 1.5-3 | 3-8 | |
Speed(m/min) | 0-80 | 0-40 | |
Motor | YZRDWF225M-4/8-30/30KW | ||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |
Motor | YZTDE132L-4/8/16-3.3/2.2/1.1KW | ||
Slewing mechanism | Speed(r/min) | 0-0.6 | |
Motor | YZR132M2-6-3.7KW×2 | ||
Climbing speed(m/min) | 0.58 | ||
Counterweight(t) | 44m jib length | 55m jib length | |
13 | 15.05 | ||
Mast section size(L×W×H)m | 1.6×1.6×3m | ||
Working temperature | -40-+60℃ | ||
Total power (KW) | 42 | ||
Power supply requirement (KVA) | 170KVA for generator | ||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | |||
Startup voltage & current | 380V×95%=361V 170A | ||
Rated working voltage & current | 380V 108A |
Loading diagram:
55m jib length:
R | 2.5-15.5 | 17 | 20 | 23 | 26 | 28.1 | 29 | 15 | 50 | 52 | 55 |
a=2(t) | 3.00 | 2.91 | 2.32 | 1.90 | 1.73 | 1.6 | |||||
a=4(t) | 6.00 | 5.40 | 4.48 | 3.80 | 3.29 | 2.99 | 2.88 | 2.29 | 1.87 | 1.70 | 1.30 |
50m jib length:
R | 2.5-15.7 | 17 | 20 | 23 | 26 | 28.7 | 29 | 32 | 35 | 47 | 50 |
a=2(t) | 3.00 | 2.97 | 2.63 | 2.36 | 2.37 | 2.2 | |||||
a=4(t) | 6.00 | 5.49 | 4.56 | 3.87 | 3.35 | 2.97 | 2.94 | 2.60 | 2.33 | 2.37 | 1.70 |
Images of CMAX Tower Crane
FAQ about CMAX Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: How to choose tower crane in engineering, such as arm length and lifting weight?
- 1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
- Q: how to do tower crane maintenance?
- Tower cranes in construction is being inspected as part of everyday maintenance. Usually, Safety In charge or a mechanical engineer do the inspection on site. Some pointers for inspection are: 1. Machine checking including motor 2. Emergency break 3. Lifting cable checking 4. Power panel 5. others Not only the tower crane is being checked, the operator and rigger also attends daily safety toolbox to update themselves on daily safety hazards on site
- Q: Who do you think was better and who would've won if they faced.
- willie with out a doubt
- Q: I saw this documentary on ancient buildings like the pyramids and it said that we don't have a construction crane that can life the stones used to build some of these ancient structures.So I gotta wonder how much the strongest crane CAN lift....or is that just fantastical nonsense about cranes not being able to lift those blocks?
- Those stones are small compared to what cranes can lift. I did find this Liebherr the heavy equipment company have developed a new all terrain nine axle mobile crane that is the worlds most powerful. The Liebherr LTM 11200-9.1 has a maximum lifting capacity of 1,200 tons with its powerful 100 metre (328 ft) telescopic boom. another: Deira City Centre was the crane’s first lift as it assisted in completing the work in less than 30 hours in what would have otherwise taken an approximate 20 days. The monster machine can lift up to 1,200 tonnes and cover an area over 100m wide. The operational weight is 96 tonnes and the total counterweight is 202 tonnes. Average weight of the stones in the Great pyramid is 2.5 tonnes. So either of those cranes could lift over 400 of these at once.
- Q: Operation points of tower crane (tower crane)?
- Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
- Q: How to improve tower crane industry in china?
- Powerful okorder ) manufacturing standards according to the rules of tower crane industry market economy. ?? Manufacturing industry is a huge system, the formation of a broad face, not one or two companies can do a good job. Powerful alliances to promote the group is a good idea, but it can not Arbitrarily arranged association, we must do things according to the market economy laws. A lot of problems are not necessarily be resolved by the professional industry, you can use the cross-industry solution.
- Q: I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
- They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
- Q: Please give a scripted answer. Funniest Denny Crane comment and action gets the 10 points
- Denny Crane. Now bring in the hookers. Did I mention I made Paula all she is..., was that just that I made Paula. Denny Crane Don't make me shoot you.
- Q: I think I'm going to try white crane kung fu. This is the club I'm going to which does three lessons in kung fu per week and 2 in sparring.The annual cost is ?40. It says it will take a minimum of 10 years to get a black sash.What are your views on this style? Is it effective and worth my time and does this club look good? Thanks
- White Crane Kung Fu combines protection and assault and makes use of the two gentle and not basic power. It additionally emphasizes organization yet evasive footwork. that's an on the spot, linear and deceptive martial paintings. this actual device is named Fei He or Flying Crane. Flying Crane makes use of the two extreme and occasional kicks yet has a marked decision for speedy hand innovations. It stresses empty-hand as properly as weapons preparation, 2-person instruments, self-protection drills and loose-sparring.
- Q: Is the pink paper crane used to represent Lulu?
- C.C taught Nunally how to make those paper cranes. It's the symbol of love and hope, I think. It's the symbol of a dream that Lelouch was able to accomplish. And symbol of life. It has many meanings. It just depends on how you interpret it))))
Send your message to us
CMAX TC5516, Applicable for Construction of Different Industrial, Commercial, Office
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords