Tower Crane CMAX TC5516 Construction Machiney

Ref Price:
Loading Port:
China main port
Payment Terms:
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


Tower Crane is a machinery used for vertical lifting and horizontal delivering of building materials and any other heavy items during construction process. It can lift and lay down, horizontally shift, and rotate, so the working range is very large. The whole body can be fixed or movable.


1. Designed by fully utilizing the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
2. The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the maximum lifting moment of 853.2kN*m. All the performance parameters meet or exceed national standards.
3. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall.
4. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
5. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.


Tower Crane CMAX TC5516 Construction Machiney

Tower Crane CMAX TC5516 Construction Machiney


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what does Stephen Crane mean by this ?
This is a very critical and harsh poem. Stephen Crane seems to have a more pessimistic outlook on life than other poems he has written, and nowhere else does that pessimistic outlook come through in his poetry than here. The pattern of the poem affixes a cynical, satirical statement after every statement of War is kind. For example, War is kind, Hoarse booming drums of the regiment, little souls who thirst for fight, these men were born to drill and die. The unexplained glory flies above them. Especially when Crane says the unexplained glory flies above them, he is making a powerful statement by questioning whether all the death and destruction is really worth it. This questioning is very important, because many wars are not really for what they seem to be for. There are exceptions of course, perhaps World War II and the fight to end the holocaust, perhaps the Civil War and the fight to end slavery, but for the most part, wars are usually conflicts between cultures over natural resources and disagreements over cultural values. The glory of war, the patriotism, the nationalism; Crane is trying to state that all of these emotions we associate with most wars are really made up so that generally people will feel better about their actions in the long term. Crane questions whether or not war is ever really worth anything to anybody in this poem. Crane clearly does not think so, considering the level of sarcasm he uses throughout the poem, especially at the end when he powerfully states Mother whose heart hung humble as a button On the bright splendid shroud of your son, Do not weep. War is kind. This is very powerful, and Crane very clearly points out that the glory of war and honor of battle are not worth much to a parent whose son has died, or wife whose husband has died, or child whose father has died. Crane's questioning of warfare is very relevant in today's war when we are as a country in what many people would call a meaningless war.
Q:How is a Crane dismantled?
After this the crew uses a mobile crane to assemble the jib and the machinery section, and places these horizontal members on an approximately 40 foot mast that consists of two mast sections. The mobile crane then adds the counter weights. The mast which is a large triangulated lattice structure typically 10 feet square then rises from this firm foundation. This triangulated structure gives the mast the strength to remain upright. The tower crane rises to its maximum height by using one mast section at a time, the crew uses a top climber that fits between the slewing unit and the top of the mast. This is done by hanging a weight on the jib to balance the counter weight. The crew then detaches the slewing unit from the top of the mast, this is done by using large hydraulic rams in the top climber to push the slewing unit up to 20 feet. The crane is then used to lift another 20 foot mast section into the gap opened by the climbing frame. Once bolted in place the crane gains a height of 20 feet. This process is reversed once the building is finished and its time to dismantle the crane and as stated earlier a smaller crane is used to dismantle the tower crane except the mast which is dismantled by the crane itself
Q:Tower crane attached concrete pump can be? Are there any state regulations?
The state expressly states that it is not possible to have serious safety incidents in Hunan and Zhuzhou before
Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
Special equipment including boilers and pressure vessels (including gas cylinders), pressure piping, elevator, crane, field (factory) in special vehicles, large recreation facilities, passenger ropeway, regular inspection period of their different. The periodic inspection period of hoisting machinery is usually two years.
Q:What happened to Seneca Crane in the Hunger Games?
This Site Might Help You. RE: What happened to Seneca Crane in the Hunger Games? I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of...
Q:Cranes or storks?
Depends on where you live ? Stick to Ornamental Pheasants or Ducks,Storks and Cranes,need to be penned in at night because you will have to pinion them to prevent them flying. Try some Golden Pheasants for a try ,Lady Amherst are becoming a rare commodity and are quite expensive,if you have Foxes and Mink,then no matter what you get you will have problems these two predators.
Q:how do i make the paper crane from prison break?
i hard to explain without showing.
Q:What's the difference between QTZ63 and qtz630, isn't it the same kind of tower crane?
It's the same kind of tower crane, but it's only a unit of rated lifting torque. The former unit is 63 tons. M, the latter is 630 kn m. According to the latest national standard "tower crane", GB/T5031-2008 and QTZ63 are written correctly.
Q:Tower crane; command; gesture
5. hook down: arm stretched to the front, lower, and the body with an angle of about 30 degrees, five fingers stretched out naturally, with the wrist as the axis rotation.6. hook horizontal movement: small arm side to side straight, fingers together, palms outward, toward the direction of the load should be moving down to the shoulder level position.7. the hook rises slightly: the small arm extends to the top of the side, the top of the palm is higher than the shoulder, the wrist is the axis, and the palms swing upward repeatedly.
Q:How to build a tower crane?
7, the boom of the horizontal installation, setup of counterweight, main hoist installation, installation sequence of these large, there are provisions in the instructions.8 、 install operating room, main cable and control cable. Installation of crane wire rope, hook, lifting the car has been in the assembly of the boom when installed.9, at this time has completed the basic installation, the later self lifting installation, the main work by the tower crane itself equipment and artificial to complete.10 tower crane from basic height to work height.Each type of tower crane has different self lifting mounting methods. In fact, in addition to carrying heavy loads, the installation of a large number of high-strength bolts is a heavy work.11, the above is the general procedure, the actual installation work in strict accordance with the installation instructions. According to historical experience, tower crane installation accidents often occur in some professional installation team.12, the old type of tower crane installation is relatively simple, but also have independent installation, and now the development of automobile crane is not a must, general use of car crane can complete all the installation.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range