• Tower Crane CMAX TC5516 Construction Machiney System 1
  • Tower Crane CMAX TC5516 Construction Machiney System 2
  • Tower Crane CMAX TC5516 Construction Machiney System 3
Tower Crane CMAX TC5516 Construction Machiney

Tower Crane CMAX TC5516 Construction Machiney

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Introduction:

Tower Crane is a machinery used for vertical lifting and horizontal delivering of building materials and any other heavy items during construction process. It can lift and lay down, horizontally shift, and rotate, so the working range is very large. The whole body can be fixed or movable.


Features:

1. Designed by fully utilizing the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
2. The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the maximum lifting moment of 853.2kN*m. All the performance parameters meet or exceed national standards.
3. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall.
4. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
5. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.


Specifications:

Tower Crane CMAX TC5516 Construction Machiney

Tower Crane CMAX TC5516 Construction Machiney

 

Q: What is the book about?Is it a good one?
My teacher read it to my class a few years ago so its kinda hard to remember, but it was about a girl living in Japan who gets diagnosed with a disease (i think cancer, but i'm not sure) and she beleived from the old Japanese story, that if you make a 1001 paper cranes, you would be granted a wish. Of course her wish would have been to live without the disease. Though, sadly, before she could make 1001 paper cranes, she lost to the disease and died. It had some really sad parts in it too, like how her best friend in the hospital with her died too. Also, this was a true story Her school desided to finish making the cranes for her, (which was very sweet) :) Our school also did it too hope you read it!
Q: How do you erect a crane. surely you would need a crane to make a crane.?
Yes you need a crane to erect a crane. A large mobile crane is required to erect a tower crane but the mobile crane is much more expensive so it saves money by only being on site for a few days to erect/dismantle the tower crane.
Q: I am currently on a vacation and our house is on a bay. It is 1 am here and I couldn't sleep because I had a personal issue on my mind. I walked out and I sat on the planks, letting my feet dangle in the water and prayed, towards the end, I was yelling at God to for once answer me. After I finished, I looked up and in the moonlight I could see a crane or heron in the water 20 feet from me, looking at me. I didn't notice it before. Does it have any spiritual meaning? I'm Christian if that helps.And remarks that are not the answer I'm looking for, please just don't bother.
The Crane is considered a messenger of God, or a symbol of communion with God, or Light Beings. It represents entering higher states of consciousness. In China, it represents immortality, long life and happiness. In Ancient Greece and Rome, the Crane was sacred to Apollo and was a herald of spring. In Christianity, it represents goodness, loyalty, good order. The mysterious Ainu people of Japan perform a ritual crane dance as do the people of Korea. The crane is often seen in traditional Japanese art. The Stork is also a solar bird, and is a destroyer of reptiles. It is associated with creation and birth and the coming of spring. In China, it also represents longevity and happiness. In Christianity, it represents chastity, purity, and piety. Seeing a stork in a place where they are rare, or dreaming of one is considered a good omen. The Heron is another solar bird. In China and Japan, the white Heron represents Light while the crow represents darkness and together represent yin-yang. It represents regeneration and rebirth. In parts of Africa, the Heron represents communication with God. All three of these birds represent, in one way or another, solar energy or light. They are all water birds so also represent going with the flow of life. Because all of these birds eat, among other things, snakes, frogs, and other reptiles that often represent evil or Satan, they also represent the constant struggle between good and evil.
Q: What does tower crane jacking up mean?
Jack beam and the lifting sleeve frame is connected with the movable claw beam under the fulcrum can fall in the tower body section on the top step.
Q: Can someone tell me the difference betweem safe working load and capacity of a crane?If possible, please provide reference along with tour answer.thanks for the help!!!
What sort of crane? If it is an industrial crane in a factory, the maximum rating for the crane is always lower than the true maximum to allow for a safety cushion. If the crane states it cane lift say 1 ton, it can safely lift 2000lbs. It will lift up to 2300 lbs if needed though.
Q: I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q: we have a project starting that will require a stack built 1km high in the air?How will they install this?
Build form the top, when they build these huge cranes, they build the top section, lift that up and build the next section underneath it, set it down to release the lift off the top section and lower it to the second section. Lift those 2 sections from the bottom, build the third section underneath it, and so on. You need to lift securely, like on all 4 sides for stability, and that leaves the corners free to build the next section.
Q: I was wondering how those guys/gals get up to their posts. Is there some type of elevator or do they climb up everyday? I'm talking about those big cranes on contruction sites. the huge ones.
There are ladders leading up there. Crane operators are fit enough to do the climb at least twice a day. I climbed cranes on weekends as a hobby photographer to take panoramic shots from that nice position up there. It was quite a climb to get up more than 200ft (60m)
Q: Emergency treatment of interrupted electricity during lifting of tower crane
When the power supply fails, you should first remove the things that are stuck in the gear!
Q: I have to answer some questions about an except from Where I Lived, and What I Lived For by Henry Thoreau. I don't need an explanation for all the metaphors he uses and what they mean, but what is he talking about with the Pygmy thing? Do the pygmies battle the cranes because... they want to eat them? Are cranes just d!cks? Is a crane some type of weapon?
Thoreau, okorder /

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords